Council archive · source document
16427 - 26Oct16 · OPW16/0270
Attached to the e-mail Operational Works Application OPW16/0270.
NOTE: ALL EARTH WORKS ARE TO BE CARRIED OUT IN ACCORDANCE WITH THE SLOPE STABILITY REPORT. ALL EARTH WORKS ARE TO BE SUPPORTED BY ENGINEERED RETAINING WALLS. ALL STORM WATER IS TO BE DEALT WITH IN ACCORDANCE WITH THE REPORT. LOOSE MATERIAL WAS FOUND TO AT LEAST 1800mm DEPTH. ALL FOOTINGS ARE TO BE FOUNDED THROUGH THE LOOSE MATERIAL INTO THE MEDIUM DENSE SAND. ca ¢ ce! pee Po Ncot PFI (e 1 PFI (2) BI (orn ! | | | c2¢_ | : | PRICE Te ee —-—— #902 | || | c2 el é | é Il | C2 Ca2¢ C2 Pre — ped — SE ap pris —— — lea — pat — eet | 17) | C2 ¢ | IV}! ! | PrI(gY — — G2 % a--- > | | PFI “S 7 I | | | C2 ¢ | | (EY | | | EF II | | Fitts ual Sea Wilco! C2 ¢ C2 ¢ | 5 PF : PFI © : Aer Cb PFI(a) PFI (<Y PFI (> cnc? SEE MEMBER SCHEDULE lil ! : : AI : ON DRAWING 54. < C2 & alyl LD 4.55.-— Free — Sle | Il ~ E - az NC2@ ¢nc2e et ~ PF gh ~~ pr 2 Bey Pri | I | RIENMAC PTY LTD | | | | | | A.B.N. 52 010 666 430 A.C.N. 010 666 430 | | lez C2 & C2 & CONSULTING CIVIL & iar | Il | PFI (2 PFI (a) Pri (dy (ne STRUCTURAL ENGINEERS A ' I| jl SUNSHINE COAST OFFICE: C2 ¢ C2 ¢ C2 SUITE 5, FIRST FLOOR, P:- (07) 5478 250 =| PFI(o) PFI (a (BY at (aNC2 Beir | | SAINT CIRINO, F:- (07) 5444 (isd z ~ ~ ~ PF ~ PFI AY | 137 BRISBANE ROAD, Email:- info@rienmac. biz 1 | | (PO BOX 149) info@rienmac.,ne' IVI | ian | MOOLOOLABA QLD 4557___Web:~_ www,rienmac,bi CLIENT: I | AI , GREEN EARTH HOMES Il C2 & C2 & | IAI pri(bX. — £2 &%N _ _ C2 § C2 YS (ar C2 ¢ PROJECT: I} —— PE — Pela Hi : PRI ~— PFI” PFI — PF PROPOSED RESIDENCE ll c2 Ng NC2 al S17] PRI ‘EPr ah | 22 LITTLE COVE ROAD % | | NOOSA HEADS QLD 4567 LC2 #2 GN C2 tr NIL ps — 2 [4| PFI — PFI — PFI ~ [,.LESELEEELELE LA LLIL LLL ELLE LLL ELLY ZA REAL PROPERTY DESCRIPTION # COUNCIL: LOT 52, RP 52418 PARISH OF WEYBA, COUNTY OF MARCH THE BASE OF RWI @ RW2 FOOTINGS |S TO BE q SATURATED AND COMPACTED WITH A NOOsA SHIRE COUNCIL VIBRATING PLATE COMPACTOR. FOOTING PLAN GROUND FLOOR FRAMING PLAN FOUNDATION DESIGN IS BASED ON REPORT No, 2330I(S) ¢ 2330I(SL) SOIL REPORT ¢ FOOT | NG P | AN - SLOPE STABILITY REPORT BY SCG ENGINEERS. REFER TO THIS REPORT FOR SOIL Designed: PLR Drawn: LR CONDITIONS EXPECTED ON SITE, IF ACTUAL SOIL CONDITIONS VARY SIGNIFICANTLY FROM THOSE IN THE REPORT. CONTACT ENGINEER FOR RE-APPRAISAL OF FOOTING DESIGN. SCALES: |:100 ALL FOOTINGS TO BE FOUNDED IN MATERIAL OF MINIMUM SAFE BEARING CAPACITY Engineer: PLR |DATE: 7 OCT Ie l00kPa, ANY FILL MATERIAL BENEATH SLABS IS TO BE COMPACTED IN LAYERS TO ACHIEVE A MINIMUM UNIFORM DENSITY OF 98% STANDARD COMPACTION. 16427 S52 B CONFIRM ALL STEPS AND FALLS WITH ARCHITECTS DRAWINGS. The dig te cet rove watt wit | JOB, NUMBER DWG No. | ISSUE permission from Rienmac Consulting Engineers . CJ - FULL HEIGHT CONTROL JOINT TO MASONRY. PETER RIENECKER - RPEQ 2088 | | Do Nor SCALE oF DRAWINGS, | A3 |SHEET 2 OF [2 |CHECKED: PLR
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
16427 - 26Oct16.pdfRelated documentApplication case desk ↗
16427 - 26Oct16.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.