                              •     evidence that seed of annual and perennial grass species has been applied at an
                                    adequate rate; and
                              •     that grass seed has germinated at a density that is likely to achieve an effective
                                    grass cover.
                      Retention of Existing Trees
               10.    The existing trees on adjoining properties must be retained and protected during construction
                      wherever achievable. To avoid doubt, this advisory note is not intended to exclude the
                      operation of Chapter 3 of the Neighbourhood Dispute Resolution Act 2011 following
                      construction of the development which is the subject of this development approval.
                      Removal of Existing Trees and Vegetation
               11.    Stockpiling mulch to the appropriate volume and separation is required for fire mitigation as
                      well as optimum weed seed sterilisation.
                      Qualified Person
               12.    Qualified Person, for the purpose of:
                      a.      Supervising landscape works and preparing a landscape certification, is considered to
                              be a landscape architect, landscape designer or horticulturist with a minimum of three
                              years current experience in the field of landscape design.
                      b.      Undertaking landscape construction and establishment works is considered to be a
                              person with five years current experience in commercial landscape construction
                              projects.
                      c.      Undertaking, supervising tree works and preparing arboriculture certification, is
                              considered to be a person with a minimum three years current experience in tree
                              protection, hazard identification/mitigation and assessment and either:
                              i.       International Society of Arboriculture (ISA) certification; or
                              ii.      A Diploma of Arboriculture.
                      d.      Undertaking Fauna site works and calculating compensatory habitat is considered to
                              be a Fauna Spotter Catcher with current certification under the Queensland Parks and
                              Wildlife Service.
                      e.      Assessing and certifying soil quality is considered to be an Agronomist Horticulturalist
                              with three years current experience in soil testing.
                      Landscape Works
               13.    The applicant must pay the re-inspection fee in accordance with Council's Fees and Charges
                      Register where:
                      a.      An inspection revealed that any constructed rehabilitation/landscape works do not
                              comply with the conditions of the Decision Notice, Approved Plans and or Approved
                              Documents
                      Certification is submitted to Council falsely stating that works comply with the approved plans,
                      documents and or conditions of the Decision Notice.
               14.    Public amenity trees are defined as any tree located within public streets, parks or areas that
                      will become publicly owned as a result of this development.
                      Erosion & Sediment Control Plans
               15.    The ESC plans submitted with the application have not been approved and are not
                      considered suitable for addressing the conditions of this permit. Specialist advice and input
                      should be sought in the preparation of ‘for construction’ ESC plans.
               I.     Include the following Reference Document



                                                                                                        Page 24 of 25

Document Set ID: 22926712
Version: 8, Version Date: 13/05/2024

Used in these records

About this file

File size
932 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

AS PUBLISHED Negotiated Report (Representations made) MCU23 0094.pdf · 932 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.