Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2021-10-18 General Committee Meeting Agenda

of 67

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                       AGENDA


             General
         Committee Meeting


             Monday, 18 October 2021

                   commencing at 10am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Frank Wilkie (Chair), Karen Finzel, Joe Jurisevic, Amelia
             Lorentson, Clare Stewart, Brian Stockwell, Tom Wegener



                    “Noosa Shire – different by nature”
Log in to download the original file

2021-10-18 General Committee Meeting Agenda(PDF, 3MB).pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 66 sections

Section 2

GENERAL COMMITTEE MEETING AGENDA                                 18 OCTOBER 2021


TABLE OF CONTENTS
ITEM                                                                           PAGE

1      ATTENDANCE & APOLOGIES                                                     3

2      CONFIRMATION OF MINUTES                                                    3

3      PRESENTATIONS                                                              3

4      DEPUTATIONS                                                                3

5      ITEMS REFERRED FROM COMMITTEES                                             3

       1    CLIMATE CHANGE RESPONSE PLAN COMMUNITY REFERENCE GROUP –
            EXPRESSION OF INTEREST OUTCOME                                        3

       2    PROPOSED LOCAL LAW AMENDMENT – SHORT STAY LETTING AND HOME
            HOSTED ACCOMMODATION – PUBLIC CONSULTATION RESULTS AND
            ADOPTION                                                              3

       3    51983.3225.14 – OTHER CHANGE TO A DEVELOPMENT APPROVAL FOR
            MULTIPLE DWELLING UNITS X 25 & 8 SHOPS AT, 30 HASTINGS ST NOOSA
            HEADS                                                                 3

       4    MCU18/0006.03 & OPW18/0012.03 APPLICATION FOR AN OTHER CHANGE
            TO A DEVELOPMENT APPROVAL FOR MULTIPLE HOUSING - TYPE 2
            DUPLEX AND OPERATIONAL WORKS, TO INCLUDE SHORT TERM
            ACCOMMODATION, SITUATED AT 1 & 2/10 HILL ST SUNSHINE BEACH            4

       5    MCU17/0046.03 – APPLICATION FOR AN OTHER CHANGE TO A
            DEVELOPMENT APPROVAL FOR MULTIPLE HOUSING TYPE 2 DUPLEX TO
            INCLUDE SHORT TERM ACCOMMODATION & OPERATIONAL WORKS AT
            2/38 PARK CRES, SUNSHINE BEACH                                        4

       6    RAL20/0014 - APPLICATION TO RECONFIGURE A LOT (1 INTO 2 LOTS) AT
            9A JIRRIMA CRES, COOROIBAH                                            4

       7    PEREGIAN DIGITAL HUB – FULL YEAR REPORT TO 30 JUNE 2021               4

6      REPORTS DIRECT TO GENERAL COMMITTEE                                        5

       8    T000054 – TEWANTIN BYPASS STAGE 1 INTERSECTION UPGRADE –
            TENDER AWARD                                                          5

       9    MCU20/0037 – PLANNING & ENVIRONMENT COURT APPEAL NO. BD1074
            OF 2021 – REFUSAL OF AN APPLICATION FOR MULTIPLE HOUSING – TYPE
            2 DUPLEX AT 11 MARGIT CRES, SUNRISE BEACH                            13

       10   PROPOSED LEASE TENANCY FOR PEREGIAN DIGITAL HUB                      42

       11   NOOSA HOLIDAY PARK FEES AND CHARGES                                  51

       12   FINANCIAL PERFORMANCE REPORT – SEPTEMBER 2021                        54

7      CLOSED SESSION                                                      67

                                                                       Page 2 of 67

Section 3

GENERAL COMMITTEE MEETING AGENDA                                               18 OCTOBER 2021



1   ATTENDANCE & APOLOGIES




2   CONFIRMATION OF MINUTES

    The Minutes of the General Committee Meeting held on 13 September 2021 be received and
    confirmed.


3   PRESENTATIONS

    Nil.




4   DEPUTATIONS

    Nil.




5   ITEMS REFERRED FROM COMMITTEES

    PLANNING & ENVIRONMENT COMMITTEE

    1      CLIMATE CHANGE RESPONSE PLAN COMMUNITY REFERENCE GROUP –
           EXPRESSION OF INTEREST OUTCOME
           (Planning & Environment Committee Agenda, 12 October 2021, Item 1, Page 4)
           Reason for referral – significance of issue


    2      PROPOSED LOCAL LAW AMENDMENT – SHORT STAY LETTING AND HOME
           HOSTED ACCOMMODATION – PUBLIC CONSULTATION RESULTS AND
           ADOPTION
           (Planning & Environment Committee Agenda, 12 October 2021, Item 2, Page 8)
           Reason for referral – significance of issue


    3      51983.3225.14 – OTHER CHANGE TO A DEVELOPMENT APPROVAL FOR
           MULTIPLE DWELLING UNITS X 25 & 8 SHOPS AT, 30 HASTINGS ST NOOSA
           HEADS
           (Planning & Environment Committee Agenda, 12 October 2021, Item 2, Page 79)
           Reason for referral – significance of issue




                                                                                         Page 3 of 67

Section 4

GENERAL COMMITTEE MEETING AGENDA                                             18 OCTOBER 2021


   4     MCU18/0006.03 & OPW18/0012.03 APPLICATION FOR AN OTHER CHANGE TO A
         DEVELOPMENT APPROVAL FOR MULTIPLE HOUSING - TYPE 2 DUPLEX AND
         OPERATIONAL WORKS, TO INCLUDE SHORT TERM ACCOMMODATION,
         SITUATED AT 1 & 2/10 HILL ST SUNSHINE BEACH
         (Planning & Environment Committee Agenda, 12 October 2021, Item 5, Page 117)
         Reason for referral – for further consideration


   5     MCU17/0046.03 – APPLICATION FOR AN OTHER CHANGE TO A DEVELOPMENT
         APPROVAL FOR MULTIPLE HOUSING TYPE 2 DUPLEX TO INCLUDE SHORT
         TERM ACCOMMODATION & OPERATIONAL WORKS AT 2/38 PARK CRES,
         SUNSHINE BEACH
         (Planning & Environment Committee Agenda, 7 September 2021, Item 6, Page 139)
         Reason for referral – for further consideration


   6     RAL20/0014 - APPLICATION TO RECONFIGURE A LOT (1 INTO 2 LOTS) AT 9A
         JIRRIMA CRES, COOROIBAH
         (Planning & Environment Committee Agenda, 12 October 2021, Item 7, Page 154)
         Reason for referral – significance of the issue


   7     PEREGIAN DIGITAL HUB – FULL YEAR REPORT TO 30 JUNE 2021
         (Planning & Environment Committee Agenda, 12 October 2021, Item 10, Page 173)
         Reason for referral – significance of the issue




   SERVICES & ORGANISATION COMMITTEE
   Nil




                                                                                    Page 4 of 67

Section 5

GENERAL COMMITTEE MEETING AGENDA                                             18 OCTOBER 2021


6    REPORTS DIRECT TO GENERAL COMMITTEE

8    T000054 – TEWANTIN BYPASS STAGE 1 INTERSECTION UPGRADE – TENDER AWARD

Author           Designer Capital Works, Aiden Flannery
                 Infrastructure Services Department

Index            ECM/ Project and Contract/ T000054 Tewantin Bypass Stage 1 – Intersection
                 Upgrade / Council Reports
                 ECM/ Projects (T1) / Tewantin Bypass – Beckmans Rd – CAP.WORK – 100970
                 ECM/ Subject/Contract/Road Construction

Attachments      1.   Evaluation Spreadsheet


EXECUTIVE SUMMARY
•    The design and delivery of the Beckmans Road roundabout as a critical piece of the Tewantin
     Bypass is funded by Transport and Main Roads (TMR) with additional funding provided by
     Noosa Council.
•    Noosa Council have agreed to manage the delivery of the project.
•    This is the largest project Council officers have designed in-house.
•    A Request for Tender (RFT) was advertised on 24 August 2021 and closed on 22 September
     2021.
•    Five respondents provided compliant submissions for Council to assess.
•    The tender price is within the allocated budget and includes a component of work that is
     Council’s responsibility.
•    The budget for the component that is Council’s responsibility (upgrade to pavement entering
     the roundabout) has been approved by the Capital Works Executive on 30 September 2021
•    The remaining tender price is fully funded by the Department of Transport and Main Roads
     under the terms of the Funding Agreement.
•    The comprehensive assessment of the five tenders resulted in the recommendation to award
     the contract to SGQ Pty Ltd.
•    Endorsement of the recommendation will allow the contractor to mobilise in November and
     complete the project in July 2022 according to requirements.
•    Recommendation to approve expenditure of $7,849,520 excluding GST, including contract
     value and contingency spend.

RECOMMENDATION
That Council note the report by the Designer Capital Works to the General Committee Meeting dated
18 October 2021 and:
A.   Award Contract T000054 for the construction of the Tewantin Bypass Stage 1 – Intersection
     Upgrade works to SGQ Pty Ltd for the sum under a schedule of rates contract for the amount
     of $5,052,575 excluding GST;
B.   Approve expenditure under this Contract up to $7,849,520 excluding GST, including
     contingency spend.




                                                                                    Page 5 of 67

Section 6

GENERAL COMMITTEE MEETING AGENDA                                                 18 OCTOBER 2021


REPORT
1.    Project Background

The delivery of the Tewantin Bypass Stage 1 – Beckmans Road and Cooroy-Noosa Road
Intersection Upgrade (upgrade) is funded by the Department of Transport and Main Roads (TMR)
under Funding Agreements executed by TMR and Council for the design and construction phases.

Through the Funding Agreement it was agreed for Council to undertake the delivery including the
design development.

In general, the scope of the upgrade includes:
•     Project Management of the design, early works and construction phases.
•     Design development including all necessary approvals.
•     Design, coordination, liaison with relevant authorities and the delivery of early works packages
      including the watermain relocation.
•     The upgrade of the existing T-intersection to a dual-lane roundabout with the ability to tie-in
      with future staging including the proposed Beckmans Road Duplication.
•     All required works including but not limited to earthworks, drainage, pavements, public utility
      and plant relocations, electrical and landscaping.
Early works requirements have been introduced to the delivery methodology to compress the overall
delivery program by enabling relocations to occur concurrently with the design development. Other
benefits include reducing the risk of authority interfacing with the main contractor (such as Energex
and UnityWater) and having the ability to deliver authority relocation using specialist contractor’s,
reducing risk of program and cost.

All early works are programmed for completion by late October 2021, enabling the intersection
upgrade contract to commence as planned.

The scope of the intersection upgrade includes a component that is Council’s responsibility and falls
outside of the Funding Agreement. The scope involves the pavement repairs for an adjoining section
of pavement west of the project extents and adjacent to the Carramar Noosa Care retirement village.
This section of works (Carramar) will be funded by Council with the budget of $400,000 (excluding
GST) approved by the Capital Works Executive on 30 September 2021.

The project consists of the following stages with the current status noted:




                                                                                        Page 6 of 67

Section 7

GENERAL COMMITTEE MEETING AGENDA                                                    18 OCTOBER 2021


                                                                                                   Cost
 Stage                         Description                       Timing        Status (%)
                                                                                                 to Date
                               Planning & detailed design      Mar 2020 –
 Planning & Design                                                                100%            $460,000
                               including approvals              Jul 2021

 Implementation                Internal costs including        Mar 2020 –
                                                                                   21%             $99,000
 Costs                         consultants                     July 2022

                               Clearing Works                   May 2021          100%             $72,000

                               Energex relocation              June 2021          100%            $156,000
 Early Works
                                                               Sept 2021 –
                               Trunk Watermain                                     80%            $470,000
                                                                Oct 2021

                               All remaining works to          Nov 2021 –                          For
                                                                               This contract
                               complete the upgrade             July 2022                        approval
 Construction –
 Main Civil Contract           Council Contribution –
                                                               Nov 2021 –
                               Carramar Pavement Repair                        This Contract    Approved
                                                                July 2022
                               ($400,000)

 Total to date                                                                                  $1,257,000


2.       Budget

The overall budget for this project, under TMR’s Funding Agreement, is as follows:

                                                                                         Amount (Excl.
                                   Summary Financial Details
                                                                                                GST)

     Funding Agreement – Detailed Design Stage                                                  $460,000

     Funding Agreement – Construction Stage (Council’s Implementation Costs)                    $485,000

     Funding Agreement – Construction Stage
                                                                                               $7,182,370
     (see breakdown below)

     •    Clearing                                                                               $72,000

     •    Energex relocation                                                                    $156,000

     •    Trunk Watermain (This Contract)                                                       $767,480

     •    Main civil works                                                                     $6,186,890

     Funding Agreement – TMR Costs                                                              $100,000

     Approved Variations                                                                              $0

     Contingency                                                                               $1,582,630

     TOTAL, including completed detailed design stage                                          $9,810,000

Under the terms of the Funding Agreement, amounts exceeding the budget items require TMR
approval to use the contingency. Under this Contract, any amount exceeding $6,186,890 requires
TMR approval to access additional funds within the Contingency amount of $1,582,630.




                                                                                            Page 7 of 67

Section 8

GENERAL COMMITTEE MEETING AGENDA                                                      18 OCTOBER 2021


3.       Tender Process

Due to the budget for the intersection upgrade being greater than $200,000, staff prepared and called
for public tenders in accordance with the Local Government Act 2009. Tender T000054 was released
via VendorPanel on 24 August 2021 and advertised in Noosa Today on 27 August 2021. The tender
closed on 22 September 2021 with five (5) conforming submissions received.

4.       Tender Assessment

The tender evaluation panel undertook an assessment of the following conforming tender
submissions, listed in alphabetical order:
•        Bellwether Contractors Pty Ltd
•        Hall Contracting Pty Ltd
•        HEH Civil Pty Ltd
•        Pentacon Pty Ltd
•        SGQ Pty Ltd
Three additional submissions were received and assessed as non-conforming and were not
considered.

The conforming tenderers were evaluated using the following evaluation criteria and weightings:

    Evaluation Criteria                                                        Weightings

    Price                                                                          40%

    Financial Capability & Resourcing                                              10%

    Contract Experience & Capacity                                                 10%

    Methodology                                                                    25%

    Quality                                                                        5%

    Health & Safety                                                                 5%

    Contribution to Local Economy                                                   5%

Note: Attachment 1 presents the evaluation outcome of the conforming submissions against the
above criteria.
The tender evaluation panel completed the evaluation process and considered SGQ Pty Ltd to be
the most advantageous to Council, presenting the best value for money.
SGQ Pty Ltd’s tender submission is most favourable based on their tender demonstrating the
following:
•        High level of experience and capability to construct civil projects of a similar nature.
•        A detailed methodology demonstrating their understanding of the scope.
•        Program to commence as soon as awarded and to achieve important milestones.
•        Certified Quality System.
•        Certified Workplace Health and Safety systems.
•        Overall best value for money benefit for Council.



                                                                                             Page 8 of 67

Section 9

GENERAL COMMITTEE MEETING AGENDA                                                  18 OCTOBER 2021


5.       Program & Next Steps
SGQ Pty Ltd propose on-site establishment to commence in November with Practical Completion
towards the middle of July 2022 inclusive of a wet weather allowance. SGQ Pty Ltd program duration
is 37 weeks.

6.       Construction Management & Inspections
The current delivery model has Council in the project management and Superintendent roles.
Council resourcing to support the project are in place with specialist consultants available to provide
technical advice and inspections if necessary.

Previous Council Consideration
Nil.

Finance
The estimated construction cost is fully funded by TMR under the Funding Agreement and there will
be no requirement to cashflow the costs.
As per the milestone payments nominated in the Funding Agreement, the first milestone payment of
$1.493M (ex GST) has been paid to Council upon the signing of the Funding Agreement. The
second milestone payment of $3.7325M (ex GST) is to be invoiced upon Contract Award of the
construction contract and will be paid to Council prior to payment of the first payment claim by the
proposed contractor.
The total construction cost estimate is as follows:

                    Item                 TMR Component           Council Component

 SGQ Pty Ltd (This contract)                              $5,052,575

 TMR / Council Components                        $4,652,575               $400,000

 Consultants and additional costs
 (if required, refer below)

     •   Native Foresters (Fauna)                      $20,000

     •   Arborist                                      $10,000

     •   Archeo (Cultural Heritage)                    $20,000

     •   Engineering consultants                       $20,000
     •   Council Implementation Costs
         (extra-over to Funding                       $250,000
         Agreement)
 SUB-TOTAL                                       $4,972,575               $400,000

 BUDGET                                          $6,186,890               $400,000

 REMAINING BUDGET –
                                                 $1,214,315                      $0
 Contingency Against Estimate




                                                                                         Page 9 of 67

Section 10

GENERAL COMMITTEE MEETING AGENDA                                                       18 OCTOBER 2021


Risks & Opportunities
 Finance Risks                                         Mitigation
 Final contract value exceeds budget.                  Risk partly mitigated by an independent cost
                                                       estimate review undertaken at the completion of the
                                                       design.
                                                       Contingency using the budget estimate under the
                                                       Funding Agreement is at 24% or $1,214,315. Under
                                                       the Funding Agreement, overall project contingency
                                                       (an additional $1,582,630) is available if required
                                                       subject to TMR approval.


 Time (program) risks                                  Mitigation
 Delays to Contract Award affecting the placement of   Contract Award for SGQ Pty Ltd scope must be
 earthworks requiring settlement of 2 months.          executed in October 2021 in order to enable the
                                                       contractor to mobilise and complete earthworks
                                                       affected by settlement before the Christmas
                                                       shutdown period.
                                                       Contract documents are to be prepared and
                                                       transmitted to the Contractor as soon as tender
                                                       award is approved.
                                                       Council to ensure all required consultants including
                                                       Native Foresters (fauna management), Archeo
                                                       (cultural heritage) are aware of the program and are
                                                       planned to attend the site to achieve the Contractor’s
                                                       program.
 Delays affecting the main civil contract.             SGQ Pty Ltd can add additional resources if required
                                                       should the program require acceleration or mitigation
                                                       of delays.


 Safety Risks                                          Mitigation
 SGQ Pty Ltd fails to ensure the work is conducted     SGQ Pty Ltd will be appointed as the Principal
 safely and in accordance with minimum standards.      Contractor responsible for workplace health & safety
                                                       for the site.
                                                       Prior to commencement of construction, SGQ Pty
                                                       Ltd management plans, Safe Work Method
                                                       Statements, Job Hazard Analysis (or similar) and
                                                       other documentation will be submitted, reviewed,
                                                       and accepted by Council.
                                                       Council will undertake surveillance, regular safety
                                                       audits and inspections throughout the construction
                                                       period.


 Scope & Quality Risk                                  Mitigation
 The Contractor fails to construct the scope of work   SGQ Pty Ltd is highly skilled with constructing civil
 to the minimum standard.                              and roadworks with extensive experience working
                                                       with Council’s and TMR, and the nominated
                                                       specifications for this project.
                                                       The quality of workmanship in the field will be
                                                       monitored with regular Council surveillance with
                                                       availability of technical support from the engineering
                                                       consultant if required.



                                                                                             Page 10 of 67

Section 11

GENERAL COMMITTEE MEETING AGENDA                                                         18 OCTOBER 2021


 Resource Risk                                           Mitigation
 Scope, quality, safety, and program are affected due    SGQ Pty Ltd have nominated a highly capable team
 to resource shortages.                                  for this project and can add additional and
                                                         appropriately skilled resources as required.
                                                         Council have added an external resource (Capital
                                                         Works Consultant) who has been procured as a
                                                         dedicated resource to provide project management,
                                                         surveillance, and contract administration support.
                                                         Council can engage the designer responsible for the
                                                         design and additional engineering consultants as
                                                         required to attend inspections if required.
                                                         Council can utilise internal resources to attend
                                                         inspections or assist with documentation if required.

Consultation
External Consultation - Community & Stakeholder
Roadpro have been engaged to provide community and stakeholder communication support. The
proposed communication program for the main civil works builds on the stakeholder engagement
and proactive communication undertaken during design and early works phases, with consistency
in key messaging, existing general community awareness about the upcoming works, and
communication methods that reflect a greater understanding of impacted stakeholders.
Communication material includes project newsletters, Facebook posts and stakeholder emails.
To coincide with the start of major construction, a sod-turning event with the Minister for Transport
and TMR is tentatively scheduled for the week starting 9 November 2021. This event will be held on
site and provide an opportunity to promote the project and the benefits for the Noosa Shire.
Separate consultation has been made with TMR (party to the Funding Agreement) regarding this
tender, program, and budget.

Internal Consultation
Corporate Services (Procurement)
Infrastructure Services (Infrastructure Planning, Design and Delivery)

Departments/Sections Consulted:

    Chief Executive Officer       Community Services                           X   Corporate Services
    Executive Support             Director                                         Director
                                  Community Development                            Financial Services
                                  Community Facilities                             Fleet
                                  Libraries & Galleries                            ICT
                                  Local Laws                                   X   Procurement
                                  Waste & Environmental Health                     Property
                                                                                   Revenue Services

    Executive Services            Environment & Sustainable Development        X   Infrastructure Services
    Director                      Director                                         Director
    Community Engagement          Building & Plumbing Services                     Asset Management
    Customer Service              Development Assessment                           Buildings and Facilities
    Governance                    Economic Development                             Civil Operations
    People and Culture            Environmental Services                           Disaster Management
                                  Strategic Land Use Planning                  X   Infrastructure Planning,
                                                                                   Design and Delivery




                                                                                                Page 11 of 67

Section 12

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021


Attachment 1




                                       Page 12 of 67

GENERAL COMMITTEE MEETING AGENDA                               18 OCTOBER 2021

Attachment 1
                                                                           Attachment 1 T000054 Intersection Upgrade Evaluation Upgrade
                                                     Final Evaluation

                  NOOSA SHIRE COUNCIL Weighted Attribute Evaluation Spreadsheet - Final Evaluation
          [ emnerties             YrewartnyaaisStgetimesecionvewese |
                a
                  NAME OF TENDERER              PRICE
                 (Conforming Tenders Only)    (excl of GST)
                2 [sGQPtyttd                      $5,052,575]
                2
                3
                4
                5
                                                 1         2          3         4          5
                 feameencmene    |    mineens | ee [| oe [Smee] oo     ieee]    [Sete] ee [ce
                 Pmcecommmyamwig  | ame     || om | ms | ve |» | om | = | ve | = | om |
                  contract txperenceandcapacty | sox || zoo | wo | so | os | ts | om | ew Ts | ts
                                        ee         ee ee ee
                 emesey                       s | we |     | ee | om  | em | es | ew | ow | oe
                  contributiontotocattconomy | se | vs |e | vs | aas | szs | oes | a [ ozs | os | as |
                  reteset ei is                                                          ee
                              ee
                  Total Fees (Pc)     40%     $5,052,575 $5,689,694 $6,181,491           $7,130,000
                 Average Fees (Pav) $....cccccccese $6,009,778
                   oo ee                            es
                 pormaeed Pte Scare ad  Pm Pe we
                 | Weighted Price Score (Pw)

                 [|      Assesment PanelMemberS | Workplace Health and Safety Advisor
                 |    CC FinamcintAssessmentPanel =| Best Title
                 [|      Assesment PaneiMembera | ADirector Corporate Services

                                                                   Page 12 of 67

Section 13

GENERAL COMMITTEE MEETING AGENDA                                              18 OCTOBER 2021


9    MCU20/0037 – PLANNING & ENVIRONMENT COURT APPEAL NO. BD1074 OF 2021 –
     REFUSAL OF AN APPLICATION FOR MULTIPLE HOUSING – TYPE 2 DUPLEX AT 11
     MARGIT CRES, SUNRISE BEACH

Author             Manager Development Assessment, Kerri Coyle
                   Environment & Sustainable Development

Index              ECM/ Application/ MCU20/0031/ Case/ Cottee & Ferraro

Attachments        1.   Amended Proposal Plans


EXECUTIVE SUMMARY
Not Applicable

RECOMMENDATION
That Council note the report by the Manager Development Assessment to the General Committee
Meeting dated 18 October 2021 regarding Planning & Environment Court Appeal No. BD1074 of
2021 and agree to settle the appeal generally in accordance with the following conditions:
     PLANNING
     When Conditions must be Complied With
1    Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
     the use commencing, and then compliance maintained at all times while the use continues.
     Approved Plans
2.   Development undertaken in accordance with this approval must generally comply with the
     approved plans of development. The approved plans are listed in the following table unless
     otherwise amended by these conditions.

 Plan No.   Rev.   Plan/Document Name                                         Date

            H      Development Application/Development summary, prepared by   03.09.2021
                   OH Architecture
 DA 001     H      Proposed Plan, prepared by OH Architecture                 3 September 2021
 DA 101     H      Proposed Basement Plan, prepared by OH Architecture        3 September 2021
 DA 102     H      Proposed Lower Floor Plan, prepared by OH Architecture     3 September 2021
 DA 103     H      Proposed Upper Floor Plan, prepared by OH Architecture     3 September 2021
 DA 104     H      Proposed Roof Plan, prepared by OH Architecture            3 September 2021
 DA 151     H      Proposed Elevations, prepared by OH Architecture           3 September 2021
 DA 152     H      Proposed Elevations, prepared by OH Architecture           3 September 2021
 DA 153     H      Proposed Elevations, prepared by OH Architecture           3 September 2021
 DA 154     H      Proposed Elevations, prepared by OH Architecture           3 September 2021
 DA 161     H      Proposed Sections, prepared by OH Architecture             3 September 2021
 DA 162     H      Proposed Sections, prepared by OH Architecture             3 September 2021
 DA 163     H      Proposed Sections, prepared by OH Architecture             3 September 2021
 DA 301     H      Pergola materials, prepared by OH Architecture                3   September
                                                                                     2021

     Currency Period
3.   This development approval lapses if the use has not happened by 21 October 2027, unless an

                                                                                     Page 13 of 67

Section 14

GENERAL COMMITTEE MEETING AGENDA                                                  18 OCTOBER 2021


      application to extend the currency period is approved by Council.
      Built Form and Development Appearance
4.    The maximum height of the development must not exceed 8 metres above the natural ground
      level and the finished surface level and 2 storeys.
5.    Certification must be submitted to Council from a Licensed Surveyor which certifies that the
      buildings do not exceed the maximum height requirement of this Decision Notice.
6.    All fencing and retaining walls within the northern and southern setbacks must be located and
      constructed in accordance with approved drawings DA 153 and DA 154, prepared by OH
      Architecture and dated 3 September 2021.
7.    All air conditioning units or other mechanical equipment must be fully enclosed or screened
      such that they are not visible from the street frontages nor adjoining properties.
8.    All deck and balcony areas must not be enclosed by permanent fixtures such as shutters,
      louvres, glass panelling or the like, except where required to satisfy any privacy condition of
      this Decision Notice.
      Performance Bond
9.    Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be
      submitted to Council, to secure performance of all conditions of this approval, prior to pre-start
      meeting. The cash bond or trading bank guarantee will be returned on performance of the
      conditions of approval less any costs incurred by Council in respect of enforcing performance
      of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect
      compliance with conditions.
      Protection of Privacy
10.   To ensure privacy is protected between adjoining properties to the west, south and north, the
      development must:
      a.    provide screening devices to balconies; and/or
      b.    have a minimum window sill height or 1.7 metres above floor level; and/or
      c.    be fitted with translucent glazing; and/or
      d.    be fitted with fixed external screens.
      Street Identification
11.   The street address of the development must be clearly visible and discernible from the primary
      frontage of the site by the provision of a street number and, where appropriate, the building
      name.
      Water & Sewer Connections
12.   An underground connection to reticulated water and sewerage must be provided to the
      development site in accordance with the standards and requirements of Northern SEQ
      Distributor–Retailer Authority (Unitywater).
13.   A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater)
      must be submitted to Council that certifies an underground connection to reticulated water and
      sewerage has been provided to the development site.
      Fencing and Walls
14.   Street fencing must be provided generally as shown on the approved plans.
15.   The area of land between the street fence and the front property boundary must be densely
      landscaped to screen any fencing from the street. A mix of understorey and taller species must
      be included.


                                                                                        Page 14 of 67

Section 15

GENERAL COMMITTEE MEETING AGENDA                                                  18 OCTOBER 2021


      Clothes Drying Areas
16.   Each dwelling unit must be provided with access to an outdoor clothes line which is screened
      from public view.
      Community Management Statement
17.   Any proposed Community Management Statement required for the development pursuant to
      the Body Corporate and Community Management Act 1997 must be submitted to Council for
      endorsement at the same time as submission of the Building Format Plan (or similar) to Council
      for compliance assessment.
      Landscaping
18.   The site must be landscape in accordance with Planning Scheme Policy PSP2 – Landscaping.
      The works must be undertaken in accordance with an operational works approval and the
      approved plans and must include in particular:
      a.    Dense screening vegetation within the gardens located to the perimeter of the site along
            the north, south and western boundaries and;
            i.     must be a minimum of 1m wide unless otherwise shown on the approved plans;
            ii.    Trees that grow to a minimum height of 8m planted at 1.5m centres. The trees
                   must have a minimum pot size of 45 litres; and
            iii.   1 x 100 litre pot size feature tree planted to each side of the driveway within the
                   site and near the front boundary.
      b.    Retention of the existing street tree located near the south east corner of the site as
            shown on the approved plans.
      c.    Provide an arborist report with construction methods to retaining the street tree in good
            health during constructed.
      d.    Provide 1 x 45 litre pot size street tree located to the northern side of the driveway
            crossover.
      e.    Provide a planting and plant schedule including species and pot size.
19.   All landscape works must be established and maintained in accordance with the approved
      design for the life of the development, and in a manner that ensures healthy, sustained and
      vigorous plant growth. All plant material must be allowed to grow to full form and be refurbished
      when its life expectancy is reached.
      Noise
20.   Written certification is required from a suitably qualified person confirming that sound pressure
      levels from all mechanical plant and equipment comply with the following:
      a.    Air-conditioning and Refrigeration
            •      7am to 10pm: Maximum level allowable = background + 5dB(A)
            •      10pm to 7am: Maximum level allowable = background + 3dB(A)
      b.    Pumps
            •      7am to 7pm: Maximum level allowable = background + 5dB(A)
            •      7pm to 10pm: Maximum level allowable = background + 3dB(A)
            •      10pm to 7am: No audible noise.
21.   The certification must be submitted to Council, which certifies that operational noise from any
      fixed plant and equipment complies and with the requirements of this Decision Notice.




                                                                                       Page 15 of 67

Section 16

GENERAL COMMITTEE MEETING AGENDA                                                   18 OCTOBER 2021


      HYDROLOGY
      Stormwater Drainage
22.   The site must be provided with a stormwater drainage system connecting to a lawful point of
      discharge. The works must be undertaken in accordance with an Operational Works approval
      and must include in particular:
      a.    a Site Based Stormwater Management Plan which addresses the following:
            i.     existing overland flows and proposed overland flows;
            ii.    maintenance of overland flows within the subject site; and
            iii.   the drainage system for all roofed areas, hardstand, grassed areas and pool
                   surrounds.
      Erosion and Sediment Control
23.   In conjunction with the application for Operational Works approval, provide an erosion and
      sediment control plan, prepared in accordance with Best Practice Erosion and Sediment
      Control (IECA, 2008) and which achieves the construction phase stormwater design objectives
      of the State Planning Policy 2017.
      WASTE DISPOSAL
24.   The developer must provide waste storage and disposal facilities in accordance with Planning
      Scheme Policy 9 - Waste Management. The facilities must include an impervious area, within
      the site, correctly sized for all refuse and recycling containers and suitably screened from public
      places and neighbouring properties. A bin wash area is required with a cold-water tap, hose
      and drain outlet connected to sewer, via a bucket trap. The drain outlet must be designed to
      prevent storm water entry to the sewerage system.
25.   Refuse containers must be provided in accordance with the requirements of the Environmental
      Protection (Interim Waste) Regulation 1996 and (Waste Management) Regulation 2000, for
      the storage and collection of refuse.
      ENGINEERING
      External Works
26.   Margit Crescent must be upgraded for the length of its frontage to the subject site. The works,
      which must be undertaken in accordance with an Operational Works approval, are:
      a.    construction of a pedestrian footpath in accordance with the conditions of this Decision
            Notice
      b.    removal of all existing property access (driveway/crossovers) and reinstatement of the
            kerb, footpath and verge area to match the balance of the site frontage, including the
            provision of topsoil and turf where the existing verge is grassed.
      Site Access and Driveways
27.   A sealed access driveway must be provided from Margit Crescent to all parking and
      manoeuvring areas of the development. The works must be undertaken in accordance with an
      Operational Works approval and must include in particular:
      a.    a driveway crossover in accordance with Council standard drawings RS-051 and
            addendums
      Car Parking
28.   Car parking must be provided generally in accordance with the approved plans. The works
      must be undertaken in accordance with an Operational Works approval and must include in
      particular:



                                                                                         Page 16 of 67

Section 17

GENERAL COMMITTEE MEETING AGENDA                                                18 OCTOBER 2021


      a.   dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
           Parking Facilities
29.   Pedestrian facilities must be provided for the development. The works must be undertaken in
      accordance with an Operational Works approval and must include in particular:
      a.   a 2 metre wide concrete footpath within the road verge for the entire length of the site’s
           frontage to Margit Crescent.
      This condition is imposed pursuant to s128 of the Planning Act 2016 being necessary trunk
      infrastructure identified by Council’s LGIP to service the development.
      Easements
30.   Unless otherwise agreed in writing by the relevant service provider, any public or third party
      infrastructure located on the subject site must be placed within an easement registered against
      the title of the property.
31.   All easements must be designed in accordance with the planning scheme and granted at no
      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
      documentation must be in accordance with the Grantee’s standard easement terms. Draft
      easement documentation must be submitted to Council for endorsement.
32.   All works must be kept clear of any existing or proposed easements on the subject land, unless
      agreed otherwise in writing by the Grantee.
      Earthworks and Retaining Walls
33.   All fill and associated batters must be undertaken in accordance with an Operational Works
      approval, and contained entirely within the subject site unless written permission from the
      respective landowner(s) is provided to Council.
      Damage to Services and Assets
34.   Any damage caused to existing services and assets as a result of the development works must
      be repaired at no cost to the asset owner at the following times:
      a.   where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
           or
      b.   where otherwise, upon completion of the works associated with the development.
      Any repair work which proposes to alter the alignment or level of existing services and assets
      must first be referred to the relevant service authority for approval


REPORT
On 8 April 2021, an application under the Noosa Plan 2006 to remove the existing dwelling and
develop the site for a duplex dwelling comprising 2 x 3 bedroom dwelling units was refused for the
following reasons:
1.    The proposal results in a development that does not comply with the following provisions of
      the Noosa Plan 2006 Eastern Beaches Locality Code:
      a.   Overall Outcomes 7.7.2g), h) and mm) as the scale and form of the proposed building is
           not in keeping with the surrounding streetscape and development, and the garages will
           dominate and present poorly to the street.
      b.   Specific Outcomes O3, O4, O5 and O6 as the proposal exceeds the maximum density,
           building height, site cover and gross floor area sought for the Eastern Beaches locality,
           proposes insufficient side setbacks and:
           i.     will be imposing on the neighbouring properties and visually dominate the street;
           ii.    will not be compatible with development in the surrounding area;
           iii.   will present excessive building bulk to adjacent and surrounding properties, and

                                                                                      Page 17 of 67

Section 18

GENERAL COMMITTEE MEETING AGENDA                                                     18 OCTOBER 2021


                 the street; and
           iv.   does not allow for sufficient landscaping and spacing between the proposed
                 building and neighbouring properties.
     c.    Specific Outcomes O39 and O42 as the garages are not articulated, span most of the
           site’s frontage, do not visually integrate with the building and will dominate the street front.
2.   The proposal is not consistent with the built form requirements of the Noosa Plan 2020.




                                         Figure 1 – Locality Plan

The application was refused as while the area is intended to be developed for duplex dwellings being
zoned Attached Housing under The Noosa Plan 2006, the proposed built form was non-compliant
with a number of key development parameters, including population density, plot ratio, site cover,
building height in storeys and side setbacks
These key development parameters are designed to ensure buildings are consistent in scale and
bulk with surrounding development in the area, buildings do not present an appearance of excessive
bulk, preserve the amenity of the surrounding area, allow soft landscaping between buildings and
adequate recreation area at ground level for residents.
The delegated officer report at the time noted that while there may be some grounds to approve the
additional bedroom given the changes to the planning scheme, there were no grounds to approve
the development in full given the number and extent of non-compliances with the scheme’s built form
outcomes.
As a result of Council’s decision to refuse the application, the applicant lodged an appeal to the
Planning & Environment Court seeking that the duplex be approved subject to reasonable and
relevant conditions.
During the course of the appeal, mediation was attended with the Court registrar wherein Council’s
reasons for refusal were discussed with the applicant and officers explored potential amendments
to the plans with the applicant to address the issues raised in the refusal. Following the mediation
the applicant made a number of amendments to the proposal plans. The amended plans address
the non-compliances with the planning scheme including:

                                                                                           Page 18 of 67

Section 19

GENERAL COMMITTEE MEETING AGENDA                                                    18 OCTOBER 2021


•      Site cover, plot ratio and building height are now fully compliant with the Noosa Plan 2006
•      The garages have been pushed back further under the building with a pergola structure added
       to this area, which assists in better integrating the garages into the overall building design and
       reducing their dominance on the street.
•      Fill on the northern side boundary has been reduced from 2m to a maximum of 1.4m tapering
       to 0m to the rear boundary, with the fill stepped back from this northern side boundary in part.
•      The number of bedrooms or rooms capable of being used as a bedroom still remain the same
       and so the proposal is non-compliant with the population density for the site under The Noosa
       Plan 2006. This is considered acceptable given the maximum population density requirements
       were not continued with the Noosa Plan 2020.
•      The proposed side setbacks have not changed and still remain non complaint but these
       intrusions are relatively minor for planters at the lower level and will not result in any amenity
       impacts.
Overall, the amended proposal plans are considered to be a reasonable outcome for the site and
while the extent of fill on the northern side boundary is not considered the best outcome, site
inspection shows it will not significantly impact on the neighbouring property given the current
neighbouring setbacks and building design. It is also noted that both the Noosa Plan 2006 and
Noosa Plan 2020 suggests some fill on sites up to 1.5m is acceptable.
It is therefore recommended that the appeal be settled.
Previous Council Consideration
Ordinary Meeting, 17 June 2021, Item 3, Page 5
That Council note the report by the Manager Development Assessment to the Planning &
Environment Committee Meeting dated 8 June 2021 regarding Planning & Environment Court
Appeal No. BD1074 of 2021 and agree to defend the appeal
Finance & Risks
Should Council not wish to settle the appeal, there will be further costs in defending the appeal and
while advice on prospects has not been received from Council’s barrister, based on the amendments
made to the plans, a favourable outcome by trial may be unlikely.
Consultation
External Consultation - Community & Stakeholder
Thynne Macartney – Tim Quirk
Internal Consultation
Nil
Departments/Sections Consulted:
      Chief Executive Officer       Community Services                        Corporate Services
      Executive Support             Director                                  Director
                                    Community Development                     Financial Services
                                    Community Facilities                      Fleet
                                    Libraries & Galleries                     ICT
                                    Local Laws                                Procurement
                                    Waste & Environmental Health              Property
                                                                              Revenue Services

      Executive Services        x   Environment & Sustainable Development     Infrastructure Services
      Director                      Director                                  Director
      Community Engagement          Building & Plumbing Services              Asset Management
      Customer Service          x   Development Assessment                    Buildings and Facilities
      Governance                    Economic Development                      Civil Operations
      People and Culture            Environmental Services                    Disaster Management
                                    Strategic Land Use Planning               Infrastructure Planning,
                                                                              Design and Delivery



                                                                                           Page 19 of 67

Section 20

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021


 ATTACHMENT 1




                                       Page 20 of 67

GENERAL COMMITTEE MEETING AGENDA                                                                                   18 OCTOBER 2021

   ATTACHMENT 1

                                                                                                                                                             Afachment 1

             DEVELOPMENT                                  APPLICATION                                                                          a
                                                                                                                                         BXSTING STE AREA                     635 468  |
                                                                                                                                         DOSTING SITE COVERAGE                29%
             PROPOSED DUPLEX (MULTIPLE HOUSING - TYPE 2)                                                                                 PROPOSED SITE COVERAGE               40%
             LOT 1 35 ON RP1 321 35                                                                                                      MAXIMUM BUILDING HEIGHT              7950rem
             11 MARGIT CRESCENT, SUNRISE BEACH                                                                                           PLOT RATIO                           0451
                                                                                                                                          TOTAL LANDSCAPED AREA OF SITE (St)  3025%
             ARCHITECTURAL DRAWING PACKAGE                                                                                               Seen                                          |

             DRAWING REGISTER

             bA.OO0         EXISTING SITE PLAN
             DAOD1          PROPOSED SITE PLAN

             DA 101         PROPOSED BASEMENT PLAN
             DA 102    -    PROPOSED LOWER PLAN
             DA 103    .    PROPOSED UPPER PLAN
             DA 104    -    PROPOSED ROOF PLAN

             DA151    -     PROPOSED ELEVATIONS
             DA152_-        PROPOSED ELEVATIONS
             DA153-         PROPOSED ELEVATIONS
             DA154—-        PROPOSED ELEVATIONS

             DA 161   -     PROPOSED SECTIONS
             DA162———-      PROPOSED SECTIONS
             DA163_—-       PROPOSED SECTIONS

             DA181-         PROPOSED BASEMENT GFA PLANS
             DA 182         PROPOSED LOWER GFA PLANS
             DA 183         PROPOSED UPPER GFA PLANS
             DA 184         PROPOSED SITE COVERAGE

             DAI91—-        PROPOSED STORY DIAGRAM

             DA211     -    STREETSCAPE ELEVATION

             DATE:          03,09,2021
             REVISION:      H                                                                                                      a         =                  —         ssi
             PORNO:         200m                                                                                      OH         ARCHITECTURE
                                                                                                                                  i     )                    a              5

                                                                                                    101 days rd.grange.qld.4051 | 0431065811 | www.oharchitecture.com.au

                                                                                                                           Page 20 of 67

Section 21

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021




                                       Page 21 of 67

Q@
                                                                                                          m
                                                                                                          =a
                                                                                                          m
         OK                                                                                               J
       |  = ]                                                                                             >
         :                                                                                                g
       pe)                                                                                                =
         5                                                                                                =
       ii                                                                                                 4
       =                                                                                                  =
       - Be                                                                                               m
       ‘oe                                                                                                m
         =                                                                                                a
         _                                                                                                m
         oe                                                                                               =
         @                                                                                                S
       -                                                                                                  >
       ; i?                          $     pif     wy   a Ne   Oe                                         @
       fe                                            }      {4    Ne                                      5
       aT                            —             rs             ee                                      2
                                                  os  ae a   My VS                                        2
                                     :   (at -                     ¢
         =                                              a     Lad
         =                           1-4             ae            is
         >                             H               i       L   Ty
         a                            AK               a        aaa
        =a                           #-/ >       enna —           |
        Fa                           ViAY              i    rt     }
                                     t  wt              3a   fH   ye,
         m                           \   by                   \
         a                           PT,            |   a   A    ae.
         m                           qi  Al 4       |   #    Si   |
         a                           1   iis                ”      |
        aA                          Ye                            aa
         w                          -   {             ,
         c                                                    1    b
        ie                           4                      a      |
         a                                                 cag
         m                          ,        pm                    lL,
         m                          :       i   .  }
         >                           a      \                      or
         m                              ¥   =...                            ies ae eees \
         =                           ee L Sy   4                   a                 |                    o
2                                   Tie     1           ‘                                                 ot
©        <                          mse        Y       €                                                  Oo
©        a                         WK   MY                                                                w
         wn                        ?  ‘     a f                   ‘“
R        —j                       1 wy       ye     o            as                                       m
         m                        b -\S— a= rt      art            °                                      aU
         vu                       Re  ht  =
        om                        s a    —*
N                                         a                         <=                                    -
                                                MARGIT CRESCENT

        3	1	1	9	0	0	302	2408	11	19	-1	
4	1	1	9	1	0	302	2408	11	19	-1	
5	1	1	9	1	1	302	2408	11	19	28	8
3	1	1	10	0	0	300	2430	57	12	-1	
4	1	1	10	1	0	300	2430	57	12	-1	
5	1	1	10	1	1	300	2430	57	12	0	sl.
3	1	1	11	0	0	302	2445	11	14	-1	
4	1	1	11	1	0	302	2445	11	14	-1	
5	1	1	11	1	1	302	2445	11	14	38	=
3	1	1	12	0	0	302	2718	30	38	-1	
4	1	1	12	1	0	302	2718	30	38	-1	
5	1	1	12	1	1	302	2718	30	38	0	¥i
3	1	1	13	0	0	301	2718	57	121	-1	
4	1	1	13	1	0	336	2718	20	72	-1	
5	1	1	13	1	1	336	2718	20	72	54	i
3	1	1	14	0	0	302	2834	56	33	-1	
4	1	1	14	1	0	302	2834	56	33	-1	
5	1	1	14	1	1	302	2834	56	33	28	4.8

Section 22

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021




                                       Page 22 of 67

GENERAL COMMITTEE MEETING AGENDA                                                         18 OCTOBER 2021

                                             bubs    .      4     4          5   ‘ a    t     i     te
                                                                 4    A            a                 waits
                                            Fr                                                         a5
                                                               DWELUNG UNIT 01 FOOTPRINT |                       _
                                             8            $V | _A_                                      9
                                            y                  DWELUING UNIT 02 FOOTPRINT         a              =
                                            t's                                                        TES      '
                                            2       -                                     -         _s   5   ‘ |
                                                   x                               memes           A\\\       iM
                                                i                4    4            3                   eft,    t
                                                                    H                   4             pet | |

       (               eR eT              REIS] =     11 MARGIT CRESCENT, SUNRISE BEACH| PROPOSED SITEPLAN. = LE}                        20 | OA oot

                                                                                               Page 22 of 67

Section 23

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021




                                       Page 23 of 67

19 40 €2 abed
  imcamenncs                      womies                                                                                                                                                          i
‘ou vol eovez                      hi                          NVId LNSW3SW8 O3SOd0Ud | H3V38 3SIYNNS “LN3DSIUD LIOUWW LL                       FJYNLDIALINDYV                         HO         \y)
                             |                                                                                                                                                                             |
                             |                                                                                                                                       CHS OMAN HIN
                    ec                       ‘is                      |                                 !                                                                                       i)         |
                  ey     :   k   -            wal                  Me |         |     ies               |      \                                                                                           |
             A          tt   |  #     =e      ‘          an               _     iWiaaenn    awning SMH   i}    |   ;              «              «               .                   ¢          |          :
             |      |    pi        Le     BN \       Kin GF                       OF       a  OF Le                   ‘            i             i                  ;                   SOs
             /             Se       K              >      ~~                 \        ee    ae     P    |            *                            }                ’                   ,        S          1
             \ |    |             Se                          \       ie        MOTT                                       NS                                        YN
              |              | PON,           ee OR             oan    Bk               .         x     IMIR                                                ;     RY.                  ;                er
                             Wear       ITA                \      iTS            NI                 ‘        r               }                    \                Cx                   Y                 »
        :                    a                 1   oS        \     eS            —                              Sy            \                    j            SSIS                      OA
               |              ne               ¥        TR OO               \      1    OR         k                   t       :                   %              Ke                         BGS           1
                               oe      :                       ad     |         aqme napa}                             f                                               oS       Ss
et         a       1       \I|     \                   ‘  Sere       <f           4       aa:             Ny        i    4             {                        ;  ;                             ; yD     hy
3           |      |     i | k       a                      S        >             1%      pth               x        AR               ;                           CAN         PR         CN               |
            |       |                \     re ye       he     a) rt    ma       =     .           , \           SX     \   x            }                          y              Sy A         vm          ;
     aS     \       \    Ee        —      rai                ES            = :         : :                -——-—--——- = hulaaeiertied 5 Sates     aie Seas ease -        iO DDE ELLA:                        gi
De           }      \    »   h         7   e7 TR Vise ae              —     % ———       \ ———,       |               x   i                                         1, ‘       x          ®          ay     j
=                     HLT            \E    ONDREYa MOLISIA        my                ho      |         |         i                                                  AS                            :       4
            \     Hewat         ° ; \.         Oras     a         ‘ 24             LS      pS                     t                              Spas              eae     x        \         nae      M4
             \               Roe                   ee                                                             \                             X                  BAR               %           !       %
                 x oe        | \, .    Ci                         i                  ‘       \     \    levees 6 #1                           ‘     x         \    i       7                     I         j
                           | SER                                  é   ey         aa                                       ISI          IISA                                     ;              SIS
                          (tees                          \            Ion        TUT NHS                                                 ‘                 x             NARA
         |       \-~|        Sal Sekeeterke ke @eiee ia                                                                                     .                 .               :               SNA
        HO                                                                             ee                                                                                    ER                     SD
       #                     |                Ont                   “                                                                                                                            ik        |
                             6B                                                           <r                                                                                                      |        '
                 a           |                                                                                                                                                                             |

                                                     L202 HAEOLOO BI                                                                    VONADV ONILAAW SALLINNOD 1WYHANAD

Section 24

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021




                                       Page 24 of 67

GENERAL COMMITTEE MEETING AGENDA                          18 OCTOBER 2021

                                                                                          \\
            a | =          : ——     eet 7 — +    -   a    t  =) 4       sk       }        |
   ESR 8 Fae ws 8) ke
   op                              oes             qi
   BL  Ht i 7} os    J*   wat    {-f TURF me euncoet | te ‘sees tTe =
   fae          ==            A       a           cho!        «Ok
   |) 1-4         —      j C)                  }          :   ela)
   Hometst—topoot {FT dd oon J                       |        a)
   iS                    SF      ere           |  ooo          |
   ‘Az                iE       :        a         oem          :                             -
   ea             =                                  oor |     :                             =
    ae Et f fort — :  eal      Cmte ' bel   iss     0    0     i                             =
   }  BK   aes @ac i         Get   PN             ;  |    -    Ab                            =~
   JP     a 3      Kee!      el          ot      |e i                                        ©
   Gh de- | ye Pie Se     tl             /          i    use    |                            rae
      ea   eee ae              =     tt a                                                    =
   ise                        Baru   Free            loot                                    <
    iS            ==     5       os                 emgage!
   Ma-ES                         =                oD          Cg            aan
   eo           FE   =_bO_           qolol                    &           a           .
   Pe        Sa                              on   enero                  #               \
   x                eS           Ep                aut                   fF
   cee     ee            ee                                                     ate      |
   [<a eK ae 9 RRR              OR HD 8 BH a :    is KA        a         \       o       J
                                                         if          a       en ee a

   @                              11 MARGIT CRESCENT, SUNRISE BEACH| PROPOSED LOWER FLOOR PLAN 7 | BEES LOW 106
                                                              Page 24 of 67

Section 25

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021




                                       Page 25 of 67

|                                                                8
                  Fo                                                                                9                                 =
       (~)                      |                                     |                                      |                        x
       St                                                             |                                      |                        r
          re                                                          |                                      |                        Q
       :                                                              |                                      |.
       ca:                                                            |                                      |                        =|
       | --                                                           |                                      |                        m
        ‘i _=      £                    GE tie OR                     i                       UE Fie OER                              =
       f                        -                                   :                                                                 4
        -                       |      —      §      js        5   He       a                                                         a
        ck  ]                   |      z              a        @            a                       ~        :                        a
        -                       i                    Ce)                                                     |                        >
         le                                                       ee ee                                ee                             m
                                |                    eel          Ot.     Wes                                |                        S
          =                     |          a i      i —       if          i       .     B)#  i  s            |                        >
          :                     |            sll                 =                   eo:                     |
                                |            i        =          has                 =        j  +   sri     |
          é                     i                          BERET                          oo
          Poof                           GOD             TRSeR                          IC                   I
          d                              WE         NE     Ded                          GL
         ¥                    til         i                So               et
          z                  x f                             ts   ‘    oy       ||                           |

          3                  3                                                                               i:
          g                   iI                      oe              |               (8                     |
          8               aE I            * emia             viel     |    Wororer        wee”               |                        o
          3                    |                                                                             |                        °
 »        8                     |         |                shod       |    =                                 |                        “4
          2                     |                           g                   3                            |                        Oo
          9                     '          ie oF bia mLew             t                   Ue rio we          '                        Oo
o         3                     |                                     |                                      |                        ow
          e                                                                                                                           m
 oO                             |                                     |                                      |                        a
9°                       4      |                                     |                                        5.                     N
 ~                              |                                     |                                      |
                                ps                                    |                                      |
        ic                      i                                     i                                      :
           .                    |                                                                            |
        i                       |
        °                       |   2g                                |
                                                       cc:
          ir                        a

        te           Sanaa...                                   SS   SSS SSQQooooeeeessm
        Is
        .8                                                  MARGIT CRESCENT

Section 26

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021




                                       Page 26 of 67

GENERAL COMMITTEE MEETING AGENDA                                                           18 OCTOBER 2021

                                                                                                                                                 |

     oO          SETAE,                                                                                        STEN                ©

                                  t                                               3
                                 =                                          3     £   MTT
                                                                            3     %   TTT
                                                                        =         —   |llIIenellh
                                               SS                       =                                                                              _
                                                                            :                !                                                         =

                                                                                                                                                       ce
    8                             ——————                                                                                           o                   ~

                                                mae                                   AUT                                                              =
                                               =                                             |
                                                                        =             Vy) re 17)
                                                                                      11 naa                                     aan a: ©
                                  :                                                                                        1S

                                Es               71.                                    aes                                        1
          |          |          |           |                                            .                             .

     (    )    OH ARCHITECTURE                         11 MARGIT CRESCENT, SUNRISE BEACH| PROPOSED ROOF PLAN              Pea                S005 OA 194,
                                                                                                  Page 26 of 67

Section 27

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021




                                       Page 27 of 67

GENERAL COMMITTEE MEETING AGENDA                                                                    18 OCTOBER 2021

     FINIBHES LEGEND
       ”   wee
           Tre er nee
       5  eee wen
       5	1	1	1	6	2	424	581	40	24	36	eee
5	1	1	1	6	3	470	585	45	13	43	we
4	1	1	1	7	0	1597	1029	60	33	-1	
5	1	1	1	7	1	1597	1029	60	33	35	wi:
4	1	1	1	8	0	1144	1069	902	28	-1	
5	1	1	1	8	1	1144	1081	23	11	38	a]
5	1	1	1	8	2	1592	1069	7	28	82	j
5	1	1	1	8	3	2045	1079	1	4	33	[
4	1	1	1	9	0	787	1114	1644	63	-1	
5	1	1	1	9	1	787	1122	15	15	47	RL
5	1	1	1	9	2	877	1134	17	43	54	5
5	1	1	1	9	3	1144	1114	91	57	18	ANH
5	1	1	1	9	4	1277	1135	13	24	28	ge
5	1	1	1	9	5	1321	1127	30	2	0	_—=
5	1	1	1	9	6	1396	1130	24	26	48	<=
5	1	1	1	9	7	1469	1129	39	6	0	cee
5	1	1	1	9	8	1725	1143	29	23	8	i
5	1	1	1	9	9	1906	1146	73	13	28	pa
5	1	1	1	9	10	2131	1168	33	3	13	Z
5	1	1	1	9	11	2327	1134	17	43	0	E
5	1	1	1	9	12	2365	1121	17	16	59	RL
5	1	1	1	9	13	2388	1122	43	15	26	ee
4	1	1	1	10	0	877	1173	1465	43	-1	
5	1	1	1	10	1	877	1180	17	16	87	2
5	1	1	1	10	2	1606	1186	1	30	2	:
5	1	1	1	10	3	2197	1169	19	35	6	_—
5	1	1	1	10	4	2327	1180	15	16	87	2
4	1	1	1	11	0	877	1201	1464	23	-1	
5	1	1	1	11	1	877	1201	15	23	39	=
5	1	1	1	11	2	1133	1207	59	17	23	ita
5	1	1	1	11	3	1208	1207	35	15	29	ou
5	1	1	1	11	4	1281	1221	4	1	56	|
5	1	1	1	11	5	1378	1221	5	1	58	2
5	1	1	1	11	6	1485	1220	3	2	35	1
5	1	1	1	11	7	1725	1220	3	3	34	bi
5	1	1	1	11	8	1923	1221	4	1	39	}
5	1	1	1	11	9	1969	1195	12	32	36	pe
5	1	1	1	11	10	2011	1207	67	16	24	esx
5	1	1	1	11	11	2327	1201	14	23	45	=
4	1	1	1	12	0	787	1241	1644	67	-1	
5	1	1	1	12	1	787	1269	16	15	70	RL
5	1	1	1	12	2	811	1269	38	15	11	Oa
5	1	1	1	12	3	877	1241	17	28	0	q
5	1	1	1	12	4	913	1290	4	1	52	i
5	1	1	1	12	5	1234	1290	47	10	19	setae
5	1	1	1	12	6	1320	1266	15	41	26	a
5	1	1	1	12	7	1366	1276	122	26	7	ates
5	1	1	1	12	8	1605	1290	4	3	0	;
5	1	1	1	12	9	1690	1289	16	15	7	Gh
5	1	1	1	12	10	1725	1297	11	5	22	i
5	1	1	1	12	11	1741	1277	120	25	21	testcase
5	1	1	1	12	12	1878	1266	16	26	14	A
5	1	1	1	12	13	1923	1267	161	32	4	recut
5	1	1	1	12	14	2295	1261	9	36	3	ae
5	1	1	1	12	15	2365	1268	16	16	28	Ab
5	1	1	1	12	16	2388	1269	18	15	22	a
4	1	1	1	13	0	787	1307	1644	38	-1	
5	1	1	1	13	1	787	1314	66	16	46	Ria
5	1	1	1	13	2	926	1311	15	3	24	TS
5	1	1	1	13	3	1142	1320	12	9	36	ee
5	1	1	1	13	4	1163	1319	63	11	48	Ria
5	1	1	1	13	5	1430	1307	45	31	0	paentp
5	1	1	1	13	6	1479	1307	27	31	26	rea
5	1	1	1	13	7	1536	1307	51	37	0	Gain:
5	1	1	1	13	8	1598	1310	12	24	51	i

                                                                                       TAME (oe Tbee       meree fer           1    AL ce
                                        3 g             aa         GABIG             Beet           aAreg       er               g 5
                                        2 =                                           |                                          z 2
                                        Ee              ee Busy              |   con] | Lunes ab ew   |        |  =              =F
                                          =                                           i                                          Rs
                                        Er  |                            i           {|               :                            z
                                  Rl 60a  . be eet             ae ace ee  mee            add                            Sst eet      Rb Abe
                                  RLM       pes         :  =                         i                                    |    ;   A  i th ait
                                   =    ss Ig              ST        enue                Se    nT eames TTT  eT             \    g 5 =
                                          2                |                                                                ;    2
                                        #e       SS le ee tua ene                                                          *     t5
                                        eee                Po aimee te          tet                    er               ae       ae
                                  eT aot         =i        |                    Wea                             ay Sd 2S all       S mam

                             ELEVATION A - MARGIT CRECENT (EASTERN) ELEVATION

                OH      ARCHITECTURE                                                                                                i
                       aaa               WV  IUI           11 MARGIT CRESCENT, SUNRISE BEACH | PROPOSED ELEVATIONS                 CLP                    22.008 1A 151,
                                                                                                                                    armen                     etme

                                                                                                           Page 27 of 67

Section 28

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021




                                       Page 28 of 67

GENERAL COMMITTEE MEETING AGENDA                                                                                           18 OCTOBER 2021

       FINIBHES LEGEND
        a     eure
              treet er nae
        ;      RS wee!
        '       ee wre

                                                               £           ens ie gt
                                                                                                                dom
                                                       Lem y                 = 7   =  7"   .     7      *      —_ ~      —     .   .     7      ame              Z has
                                                             g                    ‘R           eas       x             x          ANY       GAN                  zg
                                                             5                                                                                                   z
                                                       aL be E                                                                                                   5 aL Aja
                                                       UA                                                                                                           hai
                                                             §                             amy              BAW    Aw                  aN                        3
                                                             :         te Eth ea                        =               Laas          35       eet             . 3
                                                                            ‘      18k, PERS    ~~*=.            ti
                                                       a me   b--          penn mnteaeet?                                                   4            Ss         au
                                                                  a
                                                                                              a

                                                                  ELEVATION B - WESTERN ELEVATION

                    OH      ARCHITECTURE                                 11 MARGIT CRESCENT, SUNRISE BEACH | PROPOSED ELEVATIONS                                  -Lr—F                       —e
                    TO) days ra grange. gid. 4957 | G491905801 | wwe. oherchttecture comee                                                                        cel ON                      i   CW tegtertee ta!

                                                                                                                                    Page 28 of 67

Section 29

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021




                                       Page 29 of 67

GENERAL COMMITTEE MEETING AGENDA                                                                        18 OCTOBER 2021

     |                                                                                                                                             |
     |                                                                                                                                            1|
     |                                                                                                                   TOTAL AREA - LOWER FLOOR  :
     !                                                                                                                      ‘Area       Colour | GEA i!            |
     |                                                                                                       [ree                    _|            |
                                                                                                                        t                       ibe
     |                                                                                                                                             |

     '                                                                                     ve  7. [eee ee ee        4                              |
                                                                                              itn                                                  |
                        S70            We                                                             ne                                           |
                                                i                       |        |                                                                 |
                                        ce     Jf, Df MA Lh Of Mf,    SAL, Mf, Mf,  1 |                                                            '
                                        ppprfrrzr— JULIE                                                          |                                |
                                       CME                LI IEEE                                                                                  |
     |                                  ASA ALLA    LLL SL iy ONL      fp fA A, 1                                                                                        a
     |                                  fy Lif, (fA J ASP L PLS  ied PPP SPALL f   LA                                                              |
     '                                   W4   ;     /,  if 7       SELL,        Pp   A                                                             '                     =
     |                                      SATS L ILL     LDS SSIS SE Tp AOD                                                                      |                     ta
                                        LHS               — LI GF AS            yo                                                                                       te
     i                      2          Sa    ¥   te   S     AY, OA   AF $e    tA A SA /                           |                                '
     {|             wa                 ss     Bj ON Ge ‘ ee Af,               re I                      =        4                                 |                     a
                                        LADD LA ALL LL Agee SA DOH MW)                   i      |                                                  '                    ce
     !                                    SSSA SLL              Lf              ee                                                                ‘                     o
  ae                                    Vfl fT)      FIN SASLL            RA             |   k                                                                          —
                                          php   Li ttt in    GA                +     7                                                             \                     _
     i             sos                 AA 4 JA        fg     AV 1,      IMAL      KAZ           A       x        4                                 |                    w
     i                                 a                              as                                                                           i                    e
     j                                   7 3 ) If, SLL ; Gi     Af j fy Sf  Lf, Af fy Z\                                                           !                     pod
     I                                    YIOLLIL AA Si               NULLLLLL                                                                     |
                                         7 7 i x ys raf f   / x ft f Vee ere eee a, C SA                                                           }
     Ht                                Gittty “L, bf, Vif hf) (Lag LILA pA                                                                         '
                                         FLAS           SPS    ppp fp ff ILE DFLES SL A                                                            |
     i                                  /. fe  7 “fy a J, Af, tf, fp 7 “Ly /, Jf, SALA                                                             |
      i                                VASSAL       GLipi tt tt thi tt  fifi ti fi y
     i                                    te “ig, hy                                                                                               |
     I                                       IF                                                     a                                              |
     |     |                |                                                              Ge                                                      |                |
     |                      t                                                     nn | a  |                                                        |
     Hi                                                                        |                                                                   '                |
                                                                                                                                                 ee
     |                                                                                                                                             |
     |                                                                                                                                             |
     i                                                                                                                                             '
        7                     NLT    eT   PET RTT
      ( f        OH ARCHITECTURE                             11 MARGIT CRESCENT, SUNRISE BEACH| PROPOSED LOWER GFA PLAN                 PL                      ae
      YS                                                                                                                                 ontmen                     eee
                                                                                                               Page 29 of 67

Section 30

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021




                                       Page 30 of 67

:                                                                                         fA
                 -           gp                                                                                                                                                         z
              fo                                                                                                                                                                        m
                  ———                       |                                                   |                                                  |                                    ss)
                 7                          |                                                   |                                                  |                                    z
              B                             |                                                   :                                                  |                                    8
              i                             |                                                   |                                                  |                                    =
                 cs                         |                                                   |                                                  |                                    +
              i                             |                                                   |                                                  |
              ca                                                                                |                                                  |                                    m
              A                             |                                                   |                                                  |                                    m
              3                             |                                                                                                      |                                    =
                 _—                                                                                                                                }
              i   R |                       |           SS * ~ ~ \ .           N S S \,    Se ~S WS .                      SS SK                   |                                    S
               BR    3                      |            SY   SS SN \S         MQ                SS      KAO SRN                SYS ‘              |                                    >
              :  ew                         ‘               oy NG,’ roms pene                °    ose a            N\   awd SS   ne                i
              :    as                       |            ~ ARN            SFE          SSN             Sok NE .                Ss    a             |                                    a
                                            |                AS \}          ‘    Ss Soy    SY 7      Re   WS SW          - iN     \                |                                   DB
                 ~                          :              SERIE AN BS                          RSTO. CRS            SMES                          {                                    >
                 3                          |                ty NS      Sh \ ut  \      .  ‘       nN ‘ at    XN     SRS iN pS                     |
                                            |              ~ »      N :     NS \ \ \             EROS,  ~~  SS ‘ \        Wt NY                    |
                                            '              KOEN                    SS                      =         REO                           |
                 g                          |              RRQ                     CET          == eo          q RRQ                               |
                 a                          |              RRQ                   NE                       DR  ISDRAA                               |

                 =                          '               USAIN                    ae              1      \             SOSRSY                   ;
                 Zz                         ;                    Sa                                              mn              :                 ‘
                 m                          |                                                                                                      |
                 o                          :                                                                                                      '
                 :                          |                                                                                                      |
                z                           |                                                                                                      |
                 3                          |                      ]                                                        [                      |
                 S                                                                              1
                 °                          |                                                                                                      |
                 g                          |                                                                                                      i
                 8                          |             J                         mot         tie                                                |
                 a                          |                                                   |                                                  |                                    Oo
                 vv                                                                                                                                                                     —_,
                 m                                                                                                                                                                      co
  vU             =                          |                                                   |                                                  |                                     QO
 9               5                          |                                                                                                      |                                    a
3                                           |                                                   |                                                  |
 w                                          7                                                   |                                                        lila                           m
 °                                          |                                                   |                                                  | |        .                         a)
2.                                          |                                                   |                                                  |     als                            &
 o                                          |                                                                                                      |          gs                        i
 NJ                                         ‘                                                   '                                                  '          é                          —_,
                                            |                                                   |                                                  |  raf a
              _                             |                                                   |                                                  |          mg
              iL.                           |                                                                                                      |    i
              °                             |                                                   |                                                  |
                             oe

               ¥f
               2 i             S —————                                                        ee                                       ——————————————————s
              j=
              #18                                                                MARGIT         CRESCENT

Section 31

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021




                                       Page 31 of 67

GENERAL COMMITTEE MEETING AGENDA                                                                                                     18 OCTOBER 2021

           FINISHES LEGEND
             “     VU are)
                  Wen rw Lee
             s     wens ace
             «     eer one:

                                                                      xe               uae              :                ieee
                                                 :          ar                         |        um                       ay Sr tae  ae                                        :       =                    Z Pre
                                                                                                                                                                                                           g
                                                                                                                                                                                                           =
                                                                                       =                                               iL nce aN     ,                                                     x al Ada
                              9                  -                                                                 =                    7          7                                                          a iss
            0   A) BOAOaRY *                                                                                  ”                                                                                            3
                    STS      HR           TE Tare                       i                                                 lt     !    ~   -JHEIAB EAR 0                                                    a
         :          -         =                                                                               a        = eae             1             }                                                      aL sna
                                                                                          ata                   |      Nin   i Calis                                                                       z ae
                                                                                                                                                   Lisa)                 ea                                i
                                                                                                                              SSA           SN                                 —                              a aes

                                             ELEVATION C - SOUTHERN ELEVATION

                     OH       ARCHITECTURE                                     11 MARGIT CRESCENT, SUNRISE BEACH | PROPOSED ELEVATIONS                                          7              |             2-008 | DA 153
                    | TOD days rt. grange. gid. 495° | S421905801 | wwe. oharchttecture com.ee                                                                                fe    ON                      sa   (05 Cegterte 222)

                                                                                                                                               Page 31 of 67

Section 32

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021




                                       Page 32 of 67

GENERAL COMMITTEE MEETING AGENDA                                                                           18 OCTOBER 2021

         FINISHES LEGEND
          «    WU beeen)
               Wer hw Lees
          .    one aoe
          u    oa er re

                                                                      omnes ——                          —              us
              Al dist =                -        —      ——        te eet ar [e                   :                              .       5                                  , a sai
        .          z                                                                                                                                                      7
                   E                                                                               a                                3                                     5
              nan *                                    fea w mss           |                             é                                                                B ae
              Ri aS  1                                           =         Aw                                                          =                   ¥                 al 4a
                   3                                  ut “uu                          Be                      Ay                                        ¥   ee            x
                   &                                   igesbiace pee ee    ee       |)          7      |      |      |            s+                             tute     &
                   ®                                                    a    AN        HERO CE                                                     WEEE ain
             Al ta                                   | ep hdbs, r=      Sea       ENE        —              Se      Rag say Pore                                             et]
              we                                               lo    peereee      Sa i                                                                                    ‘ ‘aaa
                   :           Bk Bi SAY   en          ae aera ail al                   exer                                                                              2
                   = T    Serr ni]                                                      mes                                                                               g
              ua           1. a eeeeesnisiaaiae ie ball Ue ———                                                                                                            R al stu

                                  ELEVATION D - NORTHERN ELEVATION

                 OH ARCHITECTURE                               11 MARGIT CRESCENT, SUNRISE BEACH | PROPOSED ELEVATIONS                         Lr                    CEOS | DA TH
                             ele        ‘i ga eh:                                                                                             pong        .
                                                                                                                                             sarmon                  etm
                                                                                                                  Page 32 of 67

Section 33

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021




                                       Page 33 of 67

GENERAL COMMITTEE MEETING AGENDA                                                                      18 OCTOBER 2021

      FINIBHES LEGEND
       a   el ea
      Liz} rete ere rape
      Co   HORS we
       w     a er TS

                                            2                                            3                                          =
                                    08a. Adee) waTu
                                                              aaah    iinet fa os er ae Sanna                       S
                                                        FATT a                                  in ————-——;
                                    Ter                         :     :                 =          ~     TF                        |    ab uaa
                                     *   =                       U2          an     eal   inna   oe         wns                      =
                                         2                                              ‘           —                                 2
                                         §                 eae      jo eed              |      ainiian    one                         $s
                                    RL ALE e            =       1   Ee         =: =        =|      Bir case     th aa              |B    asm
                                    RL AI o =          me respon ratte se ietseeae  — =r =     Sa te aerate tet ees                Fr a aL Abe
                                         ge       si itsten BAM      Qn         ©         GAM] 5       Gaga         HADSE     wi aes = é
                                         rs        sas          LI             &,             “,                               om ig
                                         EF                 =                                                                       Re
                                    pease |            =                       HU             re                    =           ar)  2  ah eae
                                    ha)             Asi                                                                   rae    Ss aoa
                                       a                                                                                es          28
                                         gf   ead                                                                              ee fs
                                          |                                                                            }--———--=}    ie
                                           7        fet                                                                   FEL        =
                                         se                                                                             ieee
                                    tiene ON) ee ey                                                                             eee   ES an eae

                                              SECTION 01

                 OH ARCHITECTURI                             11 MARGIT CRESCENT, SUNRISE BEACH | PROPOSED SECTIONS                      he         al          20-003 | DA 161
                                                                                                                                         armen                 se ta
                                                                                                              Page 33 of 67

Section 34

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021




                                       Page 34 of 67

GENERAL COMMITTEE MEETING AGENDA                                    18 OCTOBER 2021

                                                                          [i connor      aso see]
                                                                               eee       ee
                                                                          ——
   Qo                                                                                         oO

   8                       7 j// MY Yj                                                        ;             -

  1)                                                                                          ©

    SIN         Apher y ere     rae
    S ‘)   OH ARCHITECTURE             11 MARGIT CRESCENT, SUNRISE BEACH| PROPOSED SITE COVERAGE CLF   SNS | OK T98

                                                                         Page 34 of 67

Section 35

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021




                                       Page 35 of 67

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                                  18 OCTOBER 2021

                 2                            Sas                    ae                                                                                      :                                                                                                     z
                                                                                                                              ae                        as

                   I                                                      :                ME OF UREA HD     CFR LENE                                        £              =            i                                                                      ET         ki dca
                                                                          ¢                                                                                  Sasioriewtis                                                                                              g
                                                                          y                                 FIRST STORY                                      ;  oe                                                                                                     §
                                                                          t                                                                                  i
                   i                                                     x                                                                                   }        i     ie                                                                                    has  %   RL aa
                   1   a                                                ri                                                                                    G      (th,                 aes                                                                     ’ :      RL 4a
                       ay                                                                                    GROUNO                                         !          ;                                                                                            z8

                                                                                 SO                                                                   |                              ELI 200  AX CL     ba                                                        | ty     aL anal
                   ;                                                                                                                                                                                    |                                                           a
                                                                                                                                                                       RO                                                                                      rT   $2
                                                                                                                                            2      B                             |     eu                                      ere                   ~———                   —_
                   ‘                                                                                                                                         1
                   {                                                                                                                                         t
                                                                                                                                                             {
                   +                                                                                                                                         '
                                                                                                                                                             t
                                                                                                                                                             4
                                                                                                                                                             +
                   {                                                                                                                                         1
                   ‘                                                                                                                                         4
                   t                                                                                                                                         .                                                                                                    {
                                                                                                                                                             1
                   ;                                                                                                                                         ‘
                   ;                                                                                                                                         '                                                                                                    1
                   :                                                                                                                                         '
                   ‘                                                                                                                                         ‘
                                                                                                                                                             ‘
                                                                                                                                                             t
                   f                                                                                                                                         ‘

                            OH          ARCHITECTURE                                                    11 MARGIT CRESCENT, SUNRISE BEACH| PROPOSED STORY DIAGRAM                                                                       no                                    22-005 1 0A 181,
                                                                                                                                                                                                                                      sermon                                  te    eta

                                                                                                                                                                                               Page 35 of 67

Section 36

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021




                                       Page 36 of 67

GENERAL COMMITTEE MEETING AGENDA                                                                            18 OCTOBER 2021

       i            Lot 182          i             Lott36               i              LotB5             ;                 Lott34                i            GTP 66S            i
                   SPBINIS           |            RP BIS                              wines               |               RP BGS                                                  |
        |                            |                                   |             =                  |                                      |                                |
        |                            |                              ne                                    |                                      |                                |
        |                               |                           pL                                  =                                       s                                 |
        :                            :                                   eo                                                                                                       |
                                                                         py      Fe                                                                                               |
                                                                               MARGIT CRECENT                                                                                     |
                                                                                                          |                                                                       |

                                                                11 MARGIT CRESCENT, SUNRISE BEACH | STREETSCAPE ELEVATION                                               20-005 | OA 241
                                                                                                                    Page 36 of 67

Section 37

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021




                                       Page 37 of 67

GENERAL COMMITTEE MEETING AGENDA                                                         18 OCTOBER 2021

          EXEMPLAR IMAGES:
                %   fad                                      ; Au <1         i           |   os        |              i a            |
           | a           3  9                                  he      iat     .      ad     ap chal   Re                     ThA Mf, |
                                                                 ai iy      ‘ze      Ll                i           -         /   '
           Sear                        (Pe                   fe ore                    Ste                                           .
           ae                                                         ma             SE
                                       Sn                       i,2=> mee      yr'     =                é‘            -
           |          MBER POSTS & BATTEN PERGOL A                                                             MEER POSTS b BATTEN PERGOLA
                          —               ESS                                                      |
                              WNTED WHITE  |                                                                   PAINTED WHITE
                                                eee =)                 ,  i | EOE
              =                          =S   _       * SS         M a     i   { ae      —        a” dis
                   a                1          =   i!    BE   Ms   i.       Pe eee            J     Ee   ;             il

           pig         Ss      ioctl    |   Hie           HEH       ae       .                              :

                                                     11 MARGIT CRESCENT, SUNRISE BEACH | PERGOLA MATERIALS                                20-005 | DA 31
                                                                                               Page 37 of 67

Section 38

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021




                                       Page 38 of 67

q)
                                                                                                                                        m
                                                                i                          ser                                          =
                                                          ase                                |                          |               2
                                                               a                             |                ‘lig      |               r
      3 re)                                                    i                             f                ify :                     9

       Ee                   8                                 — a                          |                                            rH
         Bee                                                            lasers                                                          a
      3  eB                                                    ;             E                                                           =a
         pe                                                                  z                                                          o
      i aa                                                                           ;                                                  ze
      : aa                                                   }                            j
      aT                                                                                                                                m
                                                                                                                                        <
                                                                             tal.                                                       S
        x                                                  Fi                5
        =                                                  ag                oS           |
        5                                                  fe          pe                |
        a                                                   i                         ef
        3                                                  ey                         ft
        a                                                  /   8                        Se
        a                                                                    5         Be
        s                                      !        :                    q         “s
        *                                               :
        €                                                                    a      i
        2                                                                           =   |
        o                                      :      '                         a)     ‘
        2                                            :                                 |
        z                                          i                  |               i
        3                                          3                              =                                                     4
        #                                            ; |                          E  |                                                  0
        q                                          {   {       3      ie          t  {                                                   Oo
        9                                            :            an:                                                                   °
s                                                              a                                                                        4
=]                                                         sees  B} * u é                                                                Oo
                                                       ne &>.                                                                           w
w                                                 t    |                                                                                m
©                                                 {   f                             |                                                   a
g.                                                |                                |                                                    8
o                                                                                                                                        Ny
                                                 |   ;                             ;

      |                                         ;   |                             )
      =                                         }   {                            |
         =                      OO             | aan      +  Wet fant To haar, }            a
                                               | MMT FLOe Po om ! Danfoss foes Tahu focus

      ¥f
      we
      j=
      #2

Section 39

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021




                                       Page 39 of 67

2° i
                                                                                                                                            i                  |                                                               r
                                                                             wr                                       i    4                                                                                                   ry
                                                                                 |                                      ae                                     |                                                               ats
                                                                                  |                                              2»
                                                                                                                                 21         §
                                                                                  |                                      <                 Bye                 j
                                                                                   |                                     3            _    lS
                                                                                                                                      |    ia                  |                                                               .
                                                                                                                                       \   We                  i
                                                                                                                                        }  Vesta                                                                               |     .
                                                                                     \                                                  |                      |                                                               L
                                                                                                                                         |                     |                                                               \
                                                                                       3                             5   ea
 a                                                                                    a          or                                                            |
                                                                                        is                                  iy]
 ‘                                                                                    eaga                     i.                                              :                                                                              .
 nN
a                                                                                        |
Lu                                                                                       .
3                                                                                        :                                       |
:                                                                                         |                                                  ;                 |                                                                2            a
  oO                                                                                      |                                                                    :
 5	1	1	1	25	2	1425	1613	17	52	95	i
5	1	1	1	25	3	1582	1623	1	33	70	|
5	1	1	1	25	4	2171	1640	22	15	0	E
4	1	1	1	26	0	2171	1697	22	14	-1	
5	1	1	1	26	1	2175	1693	7	25	49	uw
4	1	1	1	27	0	1422	1713	771	44	-1	
5	1	1	1	27	1	1422	1754	3	3	95	|
4	1	1	1	28	0	1422	1751	771	36	-1	
5	1	1	1	28	1	1422	1760	3	27	90	|
5	1	1	1	28	2	1582	1777	1	3	56	|
4	1	1	1	29	0	1581	1788	618	26	-1	
5	1	1	1	29	1	1581	1788	2	26	66	|
5	1	1	1	29	2	2170	1788	29	25	26	5
4	1	1	1	30	0	966	1812	1227	30	-1	
5	1	1	1	30	1	966	1812	7	22	72	ba
5	1	1	1	30	2	1422	1818	29	24	25	:
5	1	1	1	30	3	1581	1818	2	24	0	,
4	1	1	1	31	0	966	1838	1227	34	-1	
5	1	1	1	31	1	966	1838	26	29	41	eh
5	1	1	1	31	2	1423	1838	22	34	6	i
5	1	1	1	31	3	1581	1846	2	4	50	!
5	1	1	1	31	4	2171	1840	22	16	17	.
4	1	1	1	32	0	969	1827	1224	76	-1	
5	1	1	1	32	1	969	1873	2	14	43	3
5	1	1	1	32	2	1099	1827	17	76	0	;
5	1	1	1	32	3	1428	1881	2	7	28	|
5	1	1	1	32	4	1581	1877	2	4	0	,
4	1	1	1	33	0	971	1890	1222	27	-1	
5	1	1	1	33	1	971	1901	2	16	75	|
5	1	1	1	33	2	1581	1907	2	3	45	!
5	1	1	1	33	3	2171	1890	22	16	0	:
4	1	1	1	34	0	977	1969	1216	29	-1	
5	1	1	1	34	1	977	1969	82	29	9	iF
5	1	1	1	34	2	1436	1969	5	29	38	|
5	1	1	1	34	3	1581	1976	2	3	62	|
4	1	1	1	35	0	982	1991	1214	50	-1	
5	1	1	1	35	1	982	2014	2	13	0	'
5	1	1	1	35	2	1493	2035	29	6	28	1
5	1	1	1	35	3	1581	2016	2	3	89	|
5	1	1	1	35	4	2171	1991	25	48	30	i
4	1	1	1	36	0	1099	2032	1094	58	-1	
5	1	1	1	36	1	1099	2033	17	51	39	i
5	1	1	1	36	2	1321	2032	18	58	3	§
5	1	1	1	36	3	1444	2042	2	8	0	}
5	1	1	1	36	4	1504	2041	20	16	21	1
5	1	1	1	36	5	1582	2045	1	3	5	{
5	1	1	1	36	6	2171	2038	22	50	45	:
4	1	1	1	37	0	991	2089	1202	17	-1	
5	1	1	1	37	1	991	2090	1	4	62	|
5	1	1	1	37	2	2171	2089	22	17	63	u
4	1	1	1	38	0	993	2112	340	27	-1	
5	1	1	1	38	1	993	2112	4	25	62	i
5	1	1	1	38	2	1200	2112	38	27	0	pslss
5	1	1	1	38	3	1326	2114	7	18	44	=
4	1	1	1	39	0	996	2135	1197	22	-1	
5	1	1	1	39	1	996	2141	1	7	29	a
5	1	1	1	39	2	1047	2145	5	6	29	|,
5	1	1	1	39	3	1199	2135	3	22	83	|
5	1	1	1	39	4	1327	2141	5	4	16	3
5	1	1	1	39	5	2171	2137	22	15	0	:
4	1	1	1	40	0	999	2153	1194	17	-1	
5	1	1	1	40	1	999	2162	1	4	0	\
4	1	1	1	41	0	1001	2177	1191	24	-1	
5	1	1	1	41	1	1001	2181	34	20	26	i
5	1	1	1	41	2	1327	2179	6	5	35	=
4	1	1	1	42	0	1004	2200	1189	32	-1	
5	1	1	1	42	1	1004	2200	4	32	22	|
4	1	1	1	43	0	1010	2232	192	56	-1	
5	1	1	1	43	1	1010	2232	28	56	10	3
5	1	1	1	43	2	1199	2267	3	5	94	|
4	1	1	1	44	0	1014	2292	1179	25	-1	
5	1	1	1	44	1	1014	2294	2	14	83	|
4	1	1	1	45	0	1192	2323	31	29	-1	
5	1	1	1	45	1	1192	2323	31	29	57	al!
4	1	1	1	46	0	159	2456	2025	45	-1	
5	1	1	1	46	1	159	2456	23	45	33	Oo
5	1	1	1	46	2	1178	2462	10	30	48	zl
5	1	1	1	46	3	1251	2462	60	20	32	coh
5	1	1	1	46	4	1559	2478	11	7	0	:
5	1	1	1	46	5	2146	2465	80	30	39	7
4	1	1	1	47	0	156	2488	2070	49	-1	
5	1	1	1	47	1	156	2494	31	31	89	g
5	1	1	1	47	2	1381	2488	28	42	23	at
5	1	1	1	47	3	1474	2503	15	14	94	it
5	1	1	1	47	4	2176	2517	3	1	0	:
5	1	1	1	47	5	2215	2498	11	39	34	:
4	1	1	1	48	0	1037	2538	1140	44	-1	
5	1	1	1	48	1	1037	2538	6	44	51	|
5	1	1	1	48	2	2164	2536	41	54	27	ae
4	1	1	1	49	0	156	2576	2070	41	-1	
5	1	1	1	49	1	156	2576	34	41	22	r
5	1	1	1	49	2	1042	2587	4	24	76	|
5	1	1	1	49	3	2146	2592	39	21	68	|
4	1	1	1	50	0	156	2612	2070	41	-1	
5	1	1	1	50	1	156	2621	34	28	16	e
5	1	1	1	50	2	1044	2618	4	35	81	|
5	1	1	1	50	3	2217	2612	9	33	82	|
4	1	1	1	51	0	147	2636	2081	51	-1	
5	1	1	1	51	1	147	2636	39	51	73	Lu
5	1	1	1	51	2	1049	2661	2	12	67	|
5	1	1	1	51	3	1505	2660	4	7	70	|
5	1	1	1	51	4	1857	2653	12	30	77	|
5	1	1	1	51	5	2164	2653	64	25	64	7
4	1	1	1	52	0	147	2666	2079	61	-1	
5	1	1	1	52	1	147	2666	39	51	49	Lu
5	1	1	1	52	2	1050	2678	4	26	69	|
5	1	1	1	52	3	1507	2670	8	57	80	|
5	1	1	1	52	4	2146	2677	80	30	0	a
4	1	1	1	53	0	156	2710	2014	59	-1	
5	1	1	1	53	1	156	2712	34	33	96	=
5	1	1	1	53	2	1052	2710	5	34	88	|
5	1	1	1	53	3	1512	2734	5	22	82	|
5	1	1	1	53	4	1856	2711	13	58	20	!
5	1	1	1	53	5	2149	2734	21	3	26	q
4	1	1	1	54	0	156	2758	1722	62	-1	
5	1	1	1	54	1	156	2762	34	56	35	r
5	1	1	1	54	2	1057	2758	2	61	79	|
5	1	1	1	54	3	1515	2766	5	54	92	|
5	1	1	1	54	4	1857	2771	21	27	41	5
5	1	1	1	54	5	2146	2772	80	58	22	a
4	1	1	1	55	0	1515	2821	37	47	-1	
5	1	1	1	55	1	1515	2821	37	47	0	r
5	1	1	1	55	2	2146	2830	83	45	33	oa:
4	1	1	1	56	0	156	2880	1393	69	-1	
5	1	1	1	56	1	156	2880	34	45	83	=
5	1	1	1	56	2	847	2883	702	66	16	a
5	1	1	1	56	3	2146	2881	83	59	36	4
4	1	1	1	57	0	156	2927	2031	84	-1	
5	1	1	1	57	1	156	2930	35	70	22	g
5	1	1	1	57	2	1054	2933	506	43	13	anette
5	1	1	1	57	3	2145	2927	83	84	75	OF
4	1	1	1	58	0	156	2981	2070	80	-1	
5	1	1	1	58	1	156	3003	35	30	0	d
5	1	1	1	58	2	509	2981	91	80	45	il
5	1	1	1	58	3	1180	2997	213	62	33	a
5	1	1	1	58	4	2215	2996	11	16	7	:
4	1	1	1	59	0	156	3018	1423	75	-1	
5	1	1	1	59	1	156	3049	34	24	41	a
5	1	1	1	59	2	439	3024	14	69	12	‘
5	1	1	1	59	3	506	3018	14	73	35	I
5	1	1	1	59	4	534	3049	66	42	0	#i%
5	1	1	1	59	5	1379	3052	50	7	20	23
4	1	1	1	60	0	156	3078	34	31	-1	
5	1	1	1	60	1	156	3078	34	31	73	<x
4	1	1	1	61	0	156	3098	297	75	-1	
5	1	1	1	61	1	156	3112	31	28	46	a
4	1	1	1	62	0	156	3144	441	26	-1	
5	1	1	1	62	1	156	3144	34	26	71	w
5	1	1	1	62	2	537	3153	3	9	24	ie}
5	1	1	1	62	3	563	3152	8	11	16	(8)
5	1	1	1	62	4	590	3155	7	7	43	|e
4	1	1	1	63	0	156	3175	34	28	-1	
5	1	1	1	63	1	162	3171	11	42	73	=a
4	1	1	1	64	0	156	3208	34	26	-1	
5	1	1	1	64	1	156	3208	34	26	60	Lu
4	1	1	1	65	0	156	3239	35	31	-1	
5	1	1	1	65	1	156	3239	35	31	60	O i B

Section 40

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021




                                       Page 40 of 67

GENERAL COMMITTEE MEETING AGENDA                                                                                                                        18 OCTOBER 2021

        |                                                                                                                                                                                                            |
        3                                                                                                                                                                                                            i               il
        |                                                                                                                                                           [SS ROTERO ROAR                    | aoa         |                       |
        |                                                                                      ‘
       Rear              TUR                          IU

        |                                                                                                                                                                                            |               |
        |                                              !                                                                                                                                                             |
                                                                                                                                                                                                                     |
        |                                                                                                                                                                                                            i
        |                                                                                                                                                                                                                                           =
        |                                                                                                                                                                                                            |                              2
        |                                                                                                                                                                                                            i                              2
                                                                                                                                                                                                    ]                |                              ce
  (Gr                                                                                                                                                       peg                                                   8                                 os
        |                                                                                                                                                    iff)                                                    |                              =
        |                                                                                                                                                           i)                                               |                              is
        i                                                                                                                                             A                                                              Lr                             =
        |
        |                                                                                                                                                           )                                                i
        |                                                                                                                                                           }                                                |
        i                                              NN                                                                                   ATT                                                                      |                       |
        |                                                                                                                                             a
                                                                                                                                           NUTT                                                              |
       GOON                                                                                                                                                        literal                                       ig |            |
        |                                                                                                                                                                                                            |
        |                                                                                                                                                                                                            i
        |                                                                                                                                                                                                            |

        (    i )        OH         ARCHITECTURE                                          11 MARGIT CRESCENT, SUNRISE BEACH| PROPOSED BASEMENT GFA PLAN                                                a                               e205 1A 181,
          Mo          | TON days ré grange. gid. 4957 | 5421905801 | wee. oherchitecture.comee                                                                                                        cee                               te    tetente ta!

                                                                                                                                                                   Page 40 of 67

Section 41

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021




                                       Page 41 of 67

GENERAL COMMITTEE MEETING AGENDA                                                        18 OCTOBER 2021

                 :                                                                                                                                : RL ae
                                                                                                                                                  z
                 :                                  S                                                                                             a aL Aus
                 :                                y                        ete       + seesticesteisabuscipiaie oo 7 = Sale              ie  je |   ~
                 z                                                    i  5    es 4               ae                                           HI  ; sums
                 ,                                                              |e                               Le      eee     ee  oe
                 ee                                 i :     if  iil ii                  i       LL  eo                                   ul       a

                  |           ELEVATION D - NORTHERN ELEVATION                                                                                  |

                                                      11 MARGIT CRESCENT, SUNRISE BEACH | PROPOSED FENCE COMPARISON       FF                  EEN LDA

Section 42

GENERAL COMMITTEE MEETING AGENDA                                                 18 OCTOBER 2021


10   PROPOSED LEASE TENANCY FOR PEREGIAN DIGITAL HUB

Author            Acting Director Environment and Sustainable Development, Anthony Dow
                  Environment and Sustainable Development Department

Index             ECM/ Subject/ 45.04 Economic Development

Attachments       1.    Leasing Overview and Recommendations 2021


EXECUTIVE SUMMARY

Not applicable.

RECOMMENDATION
That Council note the report by the Acting Director Environment and Sustainable Development to
the General Committee Meeting dated 18 October 2021 regarding the commercial lease of office
space at the Peregian Digital Hub and:
A.   Agree to enter a commercial lease of the Unit 4 premises of 45m2 to Anson McCade Pty Ltd.
     for a three year term, as generally outlined in the report;
B.   Agree to enter a commercial lease of the Unit 3a premises of 45m2 to Saturate for a three year
     term, as generally outlined in the report;
C.   Note that a market process will continue in order to secure a tenant for Unit 3b;
D.   Authorise the CEO to award one subsequent lease extension of 3 years for each of these
     tenancies, subject to the lessee complying with the terms of the lease.


REPORT
The purpose of this report is to seek Council approval to enter into new leases for commercial office
space, upstairs at the Peregian Digital Hub.

Unit 4 has become available due to a ‘break-lease’ situation. Former tenant, Fireball International,
indicated in June that due to the growth of their business they were expanding into larger premises
of their own and would need to terminate their lease. Council understands that Fireball International,
now rebranded as Exci, have secured a larger space on the Sunshine Coast.

Unit 3 has become available due to the 3-year lease with Atmail Pty Ltd coming to an end in July
and their decision not to exercise an extension option due to them adopting a remote workforce
model.

The COVID pandemic has driven major changes in the digital sector’s demand for commercial office
spaces, driven by increased adoption of work-from-home policies and the normalisation of remote
collaboration. The Unit 3 space, previously tenanted by Atmail, is 104m2 in size and designed to suit
an in-person operation of 15-20 staff. The market process undertaken to re-let this space has
indicated low demand in the digital sector for this configuration and that Council would better serve
the industry’s needs and generate a more sustainable return by subdividing the Unit 3 space into
two units (Units 3a and 3b) of approximately 45m2 each.

Sourcing and evaluation of prospective tenants for the available units has been undertaken by
Colliers, Council’s contracted provider of Property Management Services, in accordance with the



                                                                                         Page 42 of 67

Section 43

GENERAL COMMITTEE MEETING AGENDA                                                   18 OCTOBER 2021


Local Government Regulation 2012 and guided by the Sound Contracting Principles set out in the
Local Government Act 2009.
Colliers has worked collaboratively with the Digital Hub Director to ensure that Council’s strategic
objective of bringing together the optimal mix of technology company tenants in the Hub is achieved.
Accordingly, the assessment of Anson McCade and Saturate as prospective tenants (for units 4 and
3a, respectively) at the Digital Hub were guided by criteria that evaluate both their ability to meet the
commercial obligations of the tenancy and their fit with the objectives and culture of the Hub.
Colliers has provided Council an outline of the procurement process, timeline and assessment
criteria, refer Attachment 1.
The primary lease provisions proposed are as follows:
 Lease Provision                 Proposal
 Unit                            4
 Lessee Name:                    Anson McCade
 Premises:                       Lease 4 being part of Lot 95 on SP137431 253 David Low Way
 Nett Lettable Area:             45m2
 Commencement Date               01.11.2021
 Base Rental                     $21,600 excluding GST per annum (to be paid in monthly
                                 instalments in advance)
 Initial Lease Terms:            3 years
 Options to Extend:              1 option, of 3 years
 Market Rent Reviews:            CPI reviews annually with Market review at exercise of option
 Outgoings:                      100% of outgoings for the building and land in proportion to the
                                 area leased (approximately $3,000 per annum).
 Permitted Use:                  Professional Office
 Rental Free Period :            Nil
 Bond:                           Three month’s rent plus Outgoings plus GST to be paid by the
                                 lessee to the lessor by cash or bank guarantee upon execution
                                 of the lease.

 Lease Provision                 Proposal
 Unit                            3a
 Lessee Name:                    Saturate
 Premises:                       Lease 3A being part of Lot 95 on SP137431 253 David Low
                                 Way
 Nett Lettable Area:             45m2 (to be confirmed on final survey)
 Commencement Date               01.11.2021
 Base Rental                     $21,600 excluding GST per annum (to be paid in monthly
                                 instalments in advance)
 Initial Lease Terms:            3 years
 Options to Extend:              1 option, of 3 years
 Market Rent Reviews:            CPI reviews annually with Market review at exercise of option
 Outgoings:                      100% of outgoings for the building and land in proportion to the
                                 area leased (approximately $3,000 per annum).
 Permitted Use:                  Professional Office
 Rental Free Period :            Nil
 Bond:                           Three month’s rent plus Outgoings plus GST to be paid by the
                                 lessee to the lessor by cash or bank guarantee upon execution
                                 of the lease.

It is recommended Council agrees to enter commercial leases with Anson McCade and Saturate
generally in line with the above provisions.



                                                                                         Page 43 of 67

Section 44

GENERAL COMMITTEE MEETING AGENDA                                                     18 OCTOBER 2021


Previous Council Consideration
Ordinary Meeting Minutes, 20 February 2020, Item 2, Page 7
That Council note the report by the Economic Development Manager to the Services & Organisation
Committee Meeting dated 11 February 2020 regarding the commercial lease of 45sqm
approximately of space at the Peregian Digital Hub and:
A.     Agree to enter a commercial lease of the premises to Fireball International Pty Ltd. for a three
       year term, as generally outlined in the report;
B.     Agree to an initial rent-free period of 3 months; and
C.     Authorise the CEO to award up to three subsequent lease extensions each of 1 year, subject
       to the lessee complying with the terms of the lease.

Finance
The financial return posed by the new lease is as detailed above. Overall this is slightly above the
previous financial return for the leased space.

Risks & Opportunities
The report seeks to minimise risk associated with securing a new lessee and allowing the lessee to
activate its business plan. The lessee’s proposal demonstrates a commitment to the Peregian
Digital Hub and Council’s strategic objectives.

Consultation
External Consultation
●    Commercial Real Estate Agents
●    Prospective tenants
Internal Consultation
●    Manager Property
●    Property Officer

Departments/Sections Consulted:
     Chief Executive Officer       Community Services                      X   Corporate Services
     Executive Officer             Director                                    Director
     Executive Support             Community Development                       Financial Services
                                   Community Facilities                        ICT
                                   Libraries & Galleries                       Procurement & Fleet
                                   Local Laws                              x   Property
                                   Waste & Environmental Health                Revenue Services

     Executive Services        X   Environment & Sustainable Development       Infrastructure Services
     Director                      Director                                    Director
     Community Engagement          Building & Plumbing Services                Asset Management
     Customer Service              Development Assessment                      Buildings and Facilities
     Governance                    Economic Development                        Civil Operations
     People and Culture            Environmental Services                      Disaster Management
                                   Strategic Land Use Planning                 Infrastructure Planning,
                                                                               Design and Delivery




                                                                                            Page 44 of 67

Section 45

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021


 Attachment 1




                                       Page 45 of 67

GENERAL COMMITTEE MEETING AGENDA                                                              18 OCTOBER 2021

   Attachment 1

                Level 5 57 The Expterunte PO Box Tas       me «6961 7 S478 S788
                Cotten Tree QLD 4558   Cotton Tree OLD 4558 vmx «(961 7 5443 S82            —      .
                                      www coBericomss      oe mcheel polbrgtormedicalten can C oll | e Ts

               24 September 2021

               Robyn Mercer & Chris Boden
               Noosa Council (Commercial Property)
               PO Box 141
               TEWANTIN QLD 4565

               Dear Robyn and Chris,

                Re: Leasing of Peregian Digital Hub

               Thank you for the privilege of allowing us to assist with you once again with your tenant search
               for the Peregian Digital Hub (the Hub). It is the recommendation of Colliers that, in addition to
               the successful placement of Anson McCade Pty Ltd (hereinafter Anson) into Tenancy B, that
               Tenancy A be split into two separate tenancies to accommodate Saturate (Andrew and Ludivine
               Maccoll) leaving approximately 45-SOm? vacant for a future prospective tenant.

               The potential subdivision of Tenancy A will cost approximately $50,000 however it will allow for
               the introduction of an additional suitable business to join the Digital Hub community and will
               somewhat “future proof” the space as the smaller spaces have traditionally been in higher
               demand.

                Procurement Process

               Colliers International (Sunshine Coast) followed the procurement processes required of Council
               in addition to generally accepted methods of advertising online and approaching potentially
               Suitable tenants within our own database. The below table outlines the timeframes surrounding
               the tenant procurement.

                Procurement Timetine

                 1* May 2021          Publicly advertised Tenancy B online via major commercial real estate
                                      websites:

                                          e   Realcommercial.com.au
                                          e  Commercialrealestate.com.au
                                          e  Colliers.com.au

                 7™ June 2021         Publicly advertised Tenancies A & B online via major commercial real
                                      estate websites:
               Coolers rternaticnal (Sutahene Const) Macagetere | ABN 3 600 Sh? 069                         op
                                                                                                     Page 45 of 67

Section 46

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021




                                       Page 46 of 67

GENERAL COMMITTEE MEETING AGENDA                                                              18 OCTOBER 2021

                  Lovet 4 57 The Esplanade PO Bon Tt          ome «6961 7 S478 P88
                 Cotton Tres OLD 4558    Cotten Tree OLD 4565 ~~  +o) 7 5443 Suez                —    -

                                            ¢   Realcommercial.com.au
                                            *   Commercialrealestate.com.au
                                            e   Colliers.com.au

                  1* july 2021          Enhance Listing to Elite Plus status (premium advertising) on
                                        Realcommercial.com.au

                                        Establish “Enquiry registration portal” for potential tenants to register
                                        their interest in the space and provide details about their business.
                                        Enquiry register portal established.

                  15" July 2021         Send targeted Noosa
5	1	1	1	12	7	1291	1311	160	34	86	Hampers”
5	1	1	1	12	8	1463	1309	58	28	96	and
5	1	1	1	12	9	1534	1309	212	29	96	hand-written
5	1	1	1	12	10	1756	1310	89	27	95	cards
5	1	1	1	12	11	1855	1314	33	24	95	to
5	1	1	1	12	12	1899	1309	137	37	95	targeted
4	1	1	1	13	0	921	1364	1120	39	-1	
5	1	1	1	13	1	921	1372	95	29	94	major
5	1	1	1	13	2	1028	1365	179	37	96	technology
5	1	1	1	13	3	1219	1364	83	30	96	firms
5	1	1	1	13	4	1312	1365	145	29	95	assessed
5	1	1	1	13	5	1470	1372	35	22	96	as
5	1	1	1	13	6	1515	1372	18	22	96	a
5	1	1	1	13	7	1545	1370	104	33	96	strong
5	1	1	1	13	8	1660	1364	31	30	96	fit
5	1	1	1	13	9	1703	1366	60	28	96	and
5	1	1	1	13	10	1774	1365	134	36	23	possible
5	1	1	1	13	11	1919	1370	122	32	96	targets.
4	1	1	1	14	0	548	1488	1524	41	-1	
5	1	1	1	14	1	548	1488	59	33	79	16
5	1	1	1	14	2	613	1492	62	37	79	july
5	1	1	1	14	3	685	1494	74	27	96	2021
5	1	1	1	14	4	921	1491	67	30	59	Half
5	1	1	1	14	5	997	1499	78	30	96	page
5	1	1	1	14	6	1086	1493	239	28	96	Advertisement
5	1	1	1	14	7	1336	1495	29	26	95	in
5	1	1	1	14	8	1376	1494	104	27	95	Noosa
5	1	1	1	14	9	1492	1499	83	22	96	news
5	1	1	1	14	10	1586	1495	90	33	95	along
5	1	1	1	14	11	1686	1494	68	26	93	with
5	1	1	1	14	12	1766	1491	153	38	91	half-page
5	1	1	1	14	13	1929	1493	143	28	90	editorial.
4	1	1	1	15	0	544	1612	1528	41	-1	
5	1	1	1	15	1	544	1612	63	33	61	30

                      July 2021         Half page Advertisement in Noosa news along with half-page editorial.

                  1° August to 20th     Offer to Lease applications and information sent to (six) relevant
                  September 2021        parties who had enquired on the tenancy.

                                        Several other enquiries had been received as a result of the online
                                        marketing however these were either not interested following more
                                        information or were insufficiently *tech-based”.

                  15th September        Applicants advised applications would be closing COB 24™ September
                 2021                   2021.

                  24th September        Applications closed.
                  2021

                 Results

                 Colliers received no enquiry from any of the targeted companies. 12 total enquiries were
                 received, of which 8 companies had sufficient interest, of which 2 were suitable candidates for
                 the available space. All 8 tenants with reasonable interest enquired on the 45m2 space, with no
                 organisations expressing interest on the larger 120m2 space.

                Calers inernutions! (Sumhune Const) Managemen | ABN Bi 600 322 068                               DA

                                                                                                     Page 46 of 67

Section 47

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021




                                       Page 47 of 67

GENERAL COMMITTEE MEETING AGENDA                                                              18 OCTOBER 2021

                  Level 5 57 The Excterscte PO Box Tos       ame «(61 T S47E Ses
                 Conon Tree OLD 4558    Cotton Tree OLD 4558 ed                               an     x
                                         wewcoleicomss       —. nthe cdbrgtomepcoben con      B oll i re rs

                 Following discussions with the suitable tenants, Saturate expressed interest in taking the
                 subdivided section of Tenancy A and Anson MaCade were satisfied with Tenancy B.

                 It is the view of Colliers that the following tenant applications be accepted. Individual support
                 letters have been provided for each tenant:
                     *  Tenancy 8: Anson McCade

                     e  Tenancy A: Subdivide tenancy into Al & A2

                            ©   Tenancy A-1: Saturate
                            e   Tenancy A-2: Vacant - Continue to source the most appropriate tenant.

                 We again thank you for the opportunity to work alongside Noosa Council to find a suitable
                 tenant for the Peregian Digital Hub. Having followed the Council's due process and having
                 assessed the potential tenant against the Council's criteria, we strongly support the application
                 of the two applications and can be called upon anytime to provide further feedback.

                 Yours sincerely
                 Colliers International

                 Michael Polkinghorne
                 Director - Real Estate Management
                 Mobile: 0408 062 602

                Cote rrernucices! [Sunstone Cast) Masagerwrt | ABN £3 £00 2 O88                             op

                                                                                                     Page 47 of 67

Section 48

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021




                                       Page 48 of 67

Level 5 S7 The Exctenade             PO Box Tot                        oe    «001 7 Se76 SPER
  Catten Tree CLD 4558                 Cotten Tree OLD 45568              an   «6-961 Y 5443 Soe?                              at         -
                                       wwe. cobers comes                      mene polbrgtorwe coher csr                      € olliers

 Annexure A               Advertisine D               umentation

r        r        f
  ‘      t                       I

  COMMERCIAL FOCUS

  THE            NEXT                ‘GREAT                    TECH                 STORY’                    WANTED

 AS pet of an orgy can pegD th athe!                          —Z >                                                             ¥
  hed end Mabrone lecheokaty comtaerers                     be
  ts the Nocus Show, Colhors m searching .          ’      =
  for “tee rect great ech tery” & om oer         ‘      .                                            —                                     —
  OPP EE TO ON) Oe Iharenees @ he                         “I
  Perapan Dagre Hn
    One of the thts test greery sertge                                                                       -                4
  tan (OCRTTy FURtes Wty thew oer
  UEEet ApmOe ore! fea hee pened up «                                                           ’      a                      i
  ree oppor trwy for an uperdccorery                                                            ’                           =         .
 lech comrgary to beret Gor) the Huts   tase The Goreguer Unga (ut offers the
  extepreneutal ervrcnmen arc supportive «= petlect ersitorrnent for tee) Cerpurses to
  cues fees Nowt bor Coters sect        bene (how connote Gta”, whdel Vaertarrg                                                                 |
  “Tet OF) 20 we Seetirng lh artes      tw comeecdtion to cote: axl cofstersao
  te jor he tenancy ree ee ates ee tee frat can be eet when worterg fon tore”
  8 am oppertunty tor krger tmtro-beeet Ths Reregper Cagtal He coment het tex
  tm OT Carat Pete OTTER y~Ets woe      prwate secure offs eth focr emus of
  rertely Wah the cmmet of Covel tent year, «wither Ser or Uhr cw avedatte. for                                                           4	1	1	1	27	0	544	1559	778	21	-1	
5	1	1	1	27	1	544	1565	46	10	23	sors
5	1	1	1	27	2	600	1562	13	13	77	of
5	1	1	1	27	3	622	1561	87	15	24	Amines
5	1	1	1	27	4	719	1563	60	17	17	etrg
5	1	1	1	27	5	785	1563	34	12	69	ech
5	1	1	1	27	6	829	1565	93	12	8	ceewpewes
5	1	1	1	27	7	933	1555	11	29	22	=
5	1	1	1	27	8	951	1559	57	14	0	foto
5	1	1	1	27	9	1014	1560	57	13	25	Grows
5	1	1	1	27	10	1080	1562	56	12	0	plneen
5	1	1	1	27	11	1145	1562	61	10	41	Comat
5	1	1	1	27	12	1217	1562	44	10	0	feuse
5	1	1	1	27	13	1271	1559	51	14	7	Hott
4	1	1	1	28	0	540	1579	750	26	-1	
5	1	1	1	28	1	540	1579	31	26	19	ene
5	1	1	1	28	2	580	1587	36	11	7	WEP
5	1	1	1	28	3	641	1587	9	14	0	¢
5	1	1	1	28	4	650	1579	51	26	56	lege
5	1	1	1	28	5	702	1579	98	26	47	percentage
5	1	1	1	28	6	810	1584	14	13	94	of
5	1	1	1	28	7	832	1579	38	26	44	(her
5	1	1	1	28	8	943	1576	26	26	90	on
5	1	1	1	28	9	977	1576	47	26	9	Of08
5	1	1	1	28	10	1032	1576	32	26	67	496
5	1	1	1	28	11	1069	1576	38	26	42	£40
5	1	1	1	28	12	1106	1576	26	26	83	of
5	1	1	1	28	13	1132	1576	40	26	34	viet
5	1	1	1	28	14	1179	1576	49	26	0	hepa
5	1	1	1	28	15	1232	1591	2	4	33	/
5	1	1	1	28	16	1243	1576	48	26	0	ewe
4	1	1	1	29	0	544	1605	719	19	-1	
5	1	1	1	29	1	544	1606	82	14	13	wotdones
5	1	1	1	29	2	634	1607	65	17	8	aorking
5	1	1	1	29	3	708	1608	214	15	22	teretey
5	1	1	1	29	4	783	1601	27	27	72	cc
5	1	1	1	29	5	810	1601	14	27	64	a
5	1	1	1	29	6	828	1608	94	15	21	permarent
5	1	1	1	29	7	952	1607	59	12	19	calllers.com
5	1	1	1	29	8	1055	1609	34	13	27	ay
5	1	1	1	29	9	1091	1605	172	18	0	pALMSOLITS
5	1	1	1	29	10	1239	1601	28	27	41	&
4	1	1	1	30	0	544	1651	1600	34	-1	
5	1	1	1	30	1	544	1652	110	31	96	HOME
5	1	1	1	30	2	670	1651	236	33	45	ESSENTIALS
4	1	1	1	31	0	547	1708	812	20	-1	
5	1	1	1	31	1	547	1712	17	5	71	ar
5	1	1	1	31	2	607	1715	1	3	39	+
5	1	1	1	31	3	628	1708	32	17	59	753
5	1	1	1	31	4	675	1709	39	15	38	Gerd
5	1	1	1	31	5	723	1704	30	29	69	Low
5	1	1	1	31	6	760	1704	37	29	41	Wey,
5	1	1	1	31	7	805	1708	88	17	0	SERCO
5	1	1	1	31	8	900	1708	58	16	0	READY
5	1	1	1	31	9	1021	1708	20	13	86	On
5	1	1	1	31	10	1051	1711	92	15	14	epptowionn
5	1	1	1	31	11	1178	1716	14	8	31	«By
5	1	1	1	31	12	1228	1708	131	19	0	appenemere
4	1	1	1	32	0	587	1736	807	18	-1	
5	1	1	1	32	1	587	1746	4	3	41	eet
5	1	1	1	32	2	625	1741	45	9	43	Jeane
5	1	1	1	32	3	680	1740	52	11	0	Meet,
5	1	1	1	32	4	745	1737	46	14	43	0808
5	1	1	1	32	5	799	1737	32	13	47	296
5	1	1	1	32	6	839	1736	35	15	24	G20
5	1	1	1	32	7	893	1738	43	14	0	 bepe,/
5	1	1	1	32	8	956	1729	46	32	0	Newe
5	1	1	1	32	9	1001	1729	69	32	43	collers
5	1	1	1	32	10	1076	1729	35	32	69	com
5	1	1	1	32	11	1119	1736	180	18	0	au/pAUNGO1I7
5	1	1	1	32	12	1273	1729	30	32	31	48
5	1	1	1	32	13	1309	1737	85	14	58	COLLERS
4	1	1	1	33	0	621	1825	1478	46	-1	
5	1	1	1	33	1	609	1828	72	48	30	pelea
5	1	1	1	33	2	689	1833	91	30	15	=>
5	1	1	1	33	3	789	1836	6	26	0	e
5	1	1	1	33	4	802	1828	35	48	0	|p)
5	1	1	1	33	5	837	1828	56	48	27	et
5	1	1	1	33	6	890	1841	133	22	14	Pee
5	1	1	1	33	7	1966	1825	133	31	1	OTs
4	1	1	1	34	0	843	1867	1106	32	-1	
5	1	1	1	34	1	843	1867	8	32	7	my
5	1	1	1	34	2	1946	1874	3	11	0	i
4	1	1	1	35	0	2055	1933	35	17	-1	
5	1	1	1	35	1	2055	1933	35	17	16	aaa
4	1	1	1	36	0	612	1955	1499	33	-1	
5	1	1	1	36	1	612	1962	112	19	60	Peregian
5	1	1	1	36	2	738	1963	78	23	83	Digital
5	1	1	1	36	3	829	1964	52	15	95	Hub
5	1	1	1	36	4	882	1958	28	32	95	|
5	1	1	1	36	5	915	1963	124	17	79	Beachside
5	1	1	1	36	6	1058	1964	158	22	95	Opportunity
5	1	1	1	36	7	1229	1964	31	14	96	for
5	1	1	1	36	8	1280	1962	47	17	61	Tech
5	1	1	1	36	9	1345	1962	111	18	94	Business
5	1	1	1	36	10	2033	1956	19	30	0	z
5	1	1	1	36	11	2062	1955	49	33	15	A
4	1	1	1	37	0	2036	1985	50	13	-1	
5	1	1	1	37	1	2036	1985	50	13	39	a
4	1	1	1	38	0	594	2281	1525	27	-1	
5	1	1	1	38	1	594	2295	12	13	40	i
5	1	1	1	38	2	2114	2281	5	17	50	|
4	1	1	1	39	0	821	2403	1207	21	-1	
5	1	1	1	39	1	821	2418	3	2	40	.
5	1	1	1	39	2	829	2403	100	21	43	Peregion
5	1	1	1	39	3	937	2403	65	17	64	Beach
5	1	1	1	39	4	1956	2403	72	13	33	——
4	1	1	1	40	0	626	2398	1423	48	-1	
5	1	1	1	40	1	626	2402	21	18	34	a
5	1	1	1	40	2	654	2398	61	48	0	aane
5	1	1	1	40	3	726	2403	93	21	22	ea
5	1	1	1	40	4	1351	2422	71	12	0	Aecnahiee
5	1	1	1	40	5	1419	2412	16	32	26	Mer
5	1	1	1	40	6	1437	2412	34	32	43	FOE
5	1	1	1	40	7	1472	2412	25	32	16	st
5	1	1	1	40	8	1501	2412	30	32	17	tee
5	1	1	1	40	9	1535	2426	47	8	32	SN
5	1	1	1	40	10	1589	2412	49	32	0	ame
5	1	1	1	40	11	1640	2423	128	11	13	ORR
5	1	1	1	40	12	1712	2412	25	32	25	tw
5	1	1	1	40	13	1739	2412	32	32	8	a
5	1	1	1	40	14	1783	2423	29	11	30	BT
5	1	1	1	40	15	1816	2412	11	32	10	2
5	1	1	1	40	16	1833	2422	20	12	36	how
5	1	1	1	40	17	1872	2426	27	8	13	nea
5	1	1	1	40	18	1899	2412	19	32	54	of
5	1	1	1	40	19	1977	2413	27	31	31	LAL
5	1	1	1	40	20	2018	2424	31	11	20	ee
4	1	1	1	41	0	1367	2442	444	12	-1	
5	1	1	1	41	1	1367	2447	48	6	46	gee
5	1	1	1	41	2	1425	2442	21	11	50	120
5	1	1	1	41	3	1542	2446	65	8	19	ee
5	1	1	1	41	4	1614	2446	159	7	33	Ae
4	1	1	1	42	0	763	2443	1321	38	-1	
5	1	1	1	42	1	763	2468	43	3	64	—
5	1	1	1	42	2	898	2468	14	3	7	-
5	1	1	1	42	3	1009	2468	14	13	0

                                                         -           —,      «atta  ney aC een Ml carace Thea eciede ants            SMNNSNN Sn
           ta)         te)       ¢                       ®          , ao
          [=          LF         \¥          tI          V         ay        wrt at ook ek
          ees. -   Uy oe pater    mw ae    Tee &  .   sare beet eS he        le Perma nets Het 8 a paremee bet | tity aged be ewe
           ‘kes          Te        en         are     SC        a                           ee eT ran
                                —            err                             Ce ae TOC) Se ber        ern prone et gues met te
        cutters com safp-AUSeee i708                                         rte eee en                                                      we.

 32 NOOSA TOOT [|      Pike: [6 iy 207!                               View                                                          penes etary seen aw

Colors rtarnasoest [iumbane Castt| Mesagerere | ABM 62 S00 S62 063                                                                                           DA

Section 49

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021




                                       Page 49 of 67

GENERAL COMMITTEE MEETING AGENDA                                           18 OCTOBER 2021

                   a            ——e               oe ee

                 Accelerating success.     eT

                 cee he       wa  -—        A    ;
                  Pe      Ae            =     =
                           as          <7
                rn   =       we      —_——
                          TF % ;         a
                               Se!              L
                           ;     me?
                                                 ss
                 Peregian Oigital Hub, 253 David Low Way, Peregian Beach
                   na.             an,
                  airmail -

                                                      at                     Ori fae

                For Lease
                                                     id
                sir-l@abyel-m@jejeleaceialiqym
                for Tech Business
                Peregian Digital Hut

                                                              ————

                                                                                Page 49 of 67

Section 50

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021




                                       Page 50 of 67

a                  i                      BEY    ELGG   Ete   S838   ELT                                                                                                                   SN
 _
 N
  oO                a            a         oeth   Bact         bee    tis.                  ;                                                                                              ©
 oS
 N
 5                 e                   ee  foo:   eke    rae   (ches  Sects    aie          ;                                                                                               °
 co                a             6     Ma  u's    Stet   the   §  ts  “ifs     Re        fxs          3     s                                           }         .                         oO
                   _             |         S335   ESE    sic   ffeh   SEE?        5S     es |                                                           :        ‘
 uu                 =)           a     Me  siky   dance  234   sit.   fgis?    die       2}           .                                         -       :         ;                        w
co                 a                   eee fees   2p     ke    SES    isis:    Se        ae           =                       x                 :             sf                            ©
 ~               aad              -        55     ies)   <a¢   iif:   padi     A         nil          SU                      :        :        Z       a5                                  D
                                 ~}          a       é    '     3%       :     3         3
                                 en        Sages chee    tol   <#55   255.     ¢ ia        7                 .                5        :        oh            a:4                          ©
                                            eet een      és    eves   GEaes      3S        S            c    5      E         &        z        cs              2 «
                               sO      &   B2e°6 S9t4     She  2 EES  25355    i                             :      z         $        5        ys             nls
                               —           §etSs pase    —5%   Beas   estes       -                   ey on         d         o        Sy       ze
                               aan         ST       TY:  cle   SoRe   ES       i:            :       a              s         e        so       3       :
                               ae.         Fisse deeds 348     SEY    gbest      ae                  oOo f£          ;        $        2%       BS      :       E
                               os      &   feas= $552: eo      ERsS   Beote        3         P      a               E         =        s3       v3                 y
                                       .   o    r t._sP  ert   st.    5e2*s      :           4                      5         c=       sz       x7
                    5          ae * |  =   Stes Sees:    was   fgs>   32%%s   i 4            :       a)             8         .        s¢        a               ,
                    :          =       -   OPte   £°y5s  aa E  Rete   s nse    tf ae      t  +       o %     é                -        es       ==
                                   =       epsh eters Exe      fate   Sepos    § ie          :      re                                          at                 ,
                    2           4 rie}     ceaes So3es =7t     23a Fete        = ie      Bey ft!       eal                                                         i
                    ;          SR          rics | isk Say      ergs Stree      ye        Po)         Bae                                                        fi
                 sai           m   2       beset S8acs    ag, tagti getee      &  ;      a2   itt    a              “        ~        f         re            72 t!
                 aa 5           :          Beepe SEES>   oh Pi sEtee icpes     < Be                  a 2                                ;                        5
                 un                o>  ©   eee ‘ites:                                      x         oO             E       (aL,       >)      i              gaat!
                 5H            site        begee G2RES sece fleet egies: * iam                      eae                               i       x         :     set
                 EQS              a        seefe Joebe   Thig   EDLeS thas)    & ie                      7                                     S        :        2  +4
                 ~~                                         ==  ShREs BE ERES     -        '        wn cy    5	1	1	1	34	11	2867	942	4	3	0	'
4	1	1	1	35	0	420	956	2444	153	-1	
5	1	1	1	35	1	420	1097	59	12	13	mE
5	1	1	1	35	2	1683	1034	4	3	0	.
5	1	1	1	35	3	2860	956	4	5	30	:
4	1	1	1	36	0	417	1023	1152	112	-1	
5	1	1	1	36	1	417	1111	62	24	33	33%
5	1	1	1	36	2	1126	1066	184	31	19	Bait
5	1	1	1	36	3	1351	1070	12	12	25	os
5	1	1	1	36	4	1505	1023	64	59	46	mats
4	1	1	1	37	0	725	1021	2000	110	-1	
5	1	1	1	37	1	725	1126	1	5	0	H
5	1	1	1	37	2	1185	1092	17	15	14	a)
5	1	1	1	37	3	1317	1094	10	3	23	-
5	1	1	1	37	4	1557	1074	14	19	28	7
5	1	1	1	37	5	1897	1059	4	2	2	™
5	1	1	1	37	6	2721	1021	4	1	20	.
4	1	1	1	38	0	423	1026	2448	166	-1	
5	1	1	1	38	1	423	1162	28	30	15	i;
5	1	1	1	38	2	685	1162	11	24	54	A
5	1	1	1	38	3	725	1145	2	26	90	|
5	1	1	1	38	4	1226	1091	17	66	0	{i
5	1	1	1	38	5	1254	1105	69	31	0	_.
5	1	1	1	38	6	1374	1070	74	55	56	a
5	1	1	1	38	7	1643	1080	24	40	63	rt
5	1	1	1	38	8	1863	1056	30	106	30	I
5	1	1	1	38	9	2852	1026	19	17	96	4
4	1	1	1	39	0	725	1078	1838	122	-1	
5	1	1	1	39	1	725	1190	1	10	81	|
5	1	1	1	39	2	1041	1179	2	5	0	d
5	1	1	1	39	3	1234	1144	71	10	25	———
5	1	1	1	39	4	1374	1137	13	8	53	bs
5	1	1	1	39	5	1643	1137	19	9	42	if
5	1	1	1	39	6	1886	1109	10	15	23	=}
5	1	1	1	39	7	2453	1071	18	36	0	ss
5	1	1	1	39	8	2560	1078	3	4	0	.
4	1	1	1	40	0	665	1080	2181	134	-1	
5	1	1	1	40	1	665	1208	12	6	14	a)
5	1	1	1	40	2	725	1208	1	3	40	|
5	1	1	1	40	3	1023	1188	2	7	63	i
5	1	1	1	40	4	1643	1150	1	6	1	‘
5	1	1	1	40	5	2469	1109	1	4	0	o
5	1	1	1	40	6	2841	1080	5	13	56	’
4	1	1	1	41	0	680	1093	2166	167	-1	
5	1	1	1	41	1	725	1230	2	12	31	|
5	1	1	1	41	2	1009	1137	43	123	0	}
5	1	1	1	41	3	1215	1157	36	95	30	||}
5	1	1	1	41	4	1643	1185	21	8	56	it
5	1	1	1	41	5	1866	1163	8	24	34	ve
5	1	1	1	41	6	2382	1132	29	36	22	=
5	1	1	1	41	7	2825	1093	21	28	0	‘j
4	1	1	1	42	0	725	1136	2120	127	-1	
5	1	1	1	42	1	725	1252	1	11	84	|
5	1	1	1	42	2	1643	1198	2	17	0	'
5	1	1	1	42	3	1898	1187	5	6	0	S
5	1	1	1	42	4	2380	1158	30	18	57	[=
5	1	1	1	42	5	2843	1136	2	5	11	;
4	1	1	1	43	0	159	1139	2686	205	-1	
5	1	1	1	43	1	159	1298	24	46	55	<x
5	1	1	1	43	2	976	1257	70	29	25	wn
5	1	1	1	43	3	1232	1214	109	46	58	mr
5	1	1	1	43	4	1394	1236	26	65	49	a
5	1	1	1	43	5	1643	1218	19	26	0	+
5	1	1	1	43	6	1853	1184	41	79	13	tt
5	1	1	1	43	7	1978	1203	46	27	37	y,
5	1	1	1	43	8	2379	1182	4	6	0	:
5	1	1	1	43	9	2483	1166	58	19	30	oe
5	1	1	1	43	10	2824	1139	21	35	16	ty
4	1	1	1	44	0	442	1184	2403	161	-1	
5	1	1	1	44	1	442	1338	12	7	27	2
5	1	1	1	44	2	1360	1289	5	3	57	é
5	1	1	1	44	3	1643	1237	17	42	18	tt
5	1	1	1	44	4	1870	1250	12	3	0	-
5	1	1	1	44	5	2823	1184	22	23	42	if
4	1	1	1	45	0	156	1191	2689	206	-1	
5	1	1	1	45	1	156	1336	33	61	16	g
5	1	1	1	45	2	441	1349	13	33	40	2
5	1	1	1	45	3	998	1283	33	86	42	}
5	1	1	1	45	4	1278	1269	48	49	21	2
5	1	1	1	45	5	1357	1314	4	2	0	5
5	1	1	1	45	6	1405	1297	4	1	41	_-
5	1	1	1	45	7	1464	1308	36	2	34	=
5	1	1	1	45	8	1643	1282	22	13	56	t
5	1	1	1	45	9	1840	1292	4	10	8	:
5	1	1	1	45	10	2020	1271	7	6	0
                                                                                                                                    if      4  .              i!
                    :                                             = I                     ‘                       |                                  -        ss
                  33                                               ;                     |          |                                tere.                    i
 <                oe              a                -                    |                it        5 Ai                            4  i        F              is
                  en                                               —. %  -               rs                   a    a                   \     «                 :                -
                 ai              =                            I   Ie                zr   +t                   =                       2            “           ‘                $
 g               23               ;                                  >               roa                       a                     ve         .             |                 :
 <                                                                an           —         |         yi                              rib                        i                 4
                 Lu               |                                                      ‘ft          -         tr    =                   =                   ri
 -                                                                 >                     tt         :          ic                        a                    ti                S
 i                                 |                         Emi                         |         ee                             :                            |
 5                            |                              | e                         it          ;     a)    J                         ed                  |
                 4                                                    =a                 is            :         :                  =       -                 :f
 Li              :                                           ®   4     .           |     ti          7     ,                                                  [                 3
                 3s                                                            :         re        ’          3                          P|                   .                 3
 E               a                                           '      fen                                                                                       1}                2
  FE             #4                                              ;                       Hi                                         ~~                        1                 j
 =               = 3            El                              -                        rt            ;         =!                  ‘                         j                &
 =               ae                                                                      i                  A                      ‘                          i                 >
 =               He               «                          |   a     ~            i    i}           i     {      \y              ~2                          ,                5
                  “—                                                   ad      a         fe         :        A                       ~                        as                7
                                 4                                a       r    ay        HH                    -                    i:                        ii                i
 O                            -                                              a                         a                                  ff                  i
 a                                                                                                       ’                         .  ida      1              bay               5
Ps                                                                                                                                       ie    a              ih                i
 i
  =a
 uu
  oO

Section 51

GENERAL COMMITTEE MEETING AGENDA                                                18 OCTOBER 2021


11   NOOSA HOLIDAY PARK FEES AND CHARGES

Author             Property Advisor – Commercial Property, Robyn Mercer
                   Corporate Services Department

Index              ECM /Subject /8.03; 8.06; 8.18 Noosa Holiday Parks Admin

Attachments        Nil


EXECUTIVE SUMMARY
The report seeks adoption of proposed General Cost Recovery Fees and Commercial Charges for
the Noosa Holiday Parks for the period from July 2022 to January 2023. The fees and charges are
reviewed every six (6) months as required to maintain a consistent annual forward booking period.

RECOMMENDATION
That Council note the report by the Property Advisor – Commercial Property to the General
Committee Meeting dated 18 October 2021 and:
A.      Set fees and charges for the Noosa Holiday Parks to align with the cessation of the end of
        the January 2023 Queensland school holidays; and
B.      Adopt the Proposed General Cost Recovery Fees and Commercial Charges schedule for
        Noosa Holiday Parks for the period ending Monday 23 January 2023 as detailed in the tables
        contained within the report.


REPORT
Current fees and charges for the Noosa Holiday Parks apply until 11 July 2022. Council maintains
an ‘advance’ fees and charges schedule for the parks to allow for forward booking of sites by
customers.

Twice yearly, Council reviews and amends the fees, including benchmarking and suitability
assessment of the fee and charge categories.

The purpose of this report is to propose the adoption of fees and charges for the Noosa Holiday
Parks for a further six (6) months to the end of the December 2022 – January 2023 school holiday
period, as indicated in Tables 1-4.
Table 1. Boreen Point Campground
                                 12 July 2022 to 23 January 2023
                                     OFF PEAK                                PEAK
                           Current    Proposed Change         Current      Proposed     Change
 Powered Sites              $40.00       $42.00     5.0%       $45.00       $47.00       4.4%
 Unpowered Sites            $34.00       $36.00     5.9%       $39.00       $41.00       5.1%


Table 2. Noosa North Shore Campground
                                  12 July 2022 to 23 January 2023
                                       OFF PEAK                               PEAK
                              Current    Proposed Change        Current      Proposed    Change
 Powered Sites – Bush          $48.00      $49.00      2.1%       $55.00       $56.00     1.8%
 Powered Sites – Beach         $51.00      $52.00      2.0%       $58.00       $59.00     1.7%
 Unpowered Sites               $36.00      $37.00      2.8%       $43.00       $44.00     2.3%


                                                                                      Page 51 of 67

Section 52

GENERAL COMMITTEE MEETING AGENDA                                                    18 OCTOBER 2021


Table 3. Noosa River Holiday Park
                                 12 July 2022 to 23 January 2023
                      OFF PEAK                       PEAK                           SHOULDER
              Current Proposed Change Current Proposed Change             Current    Proposed Change
 Powered
              $53.00     $54.00   1.9%      $68.00     $69.00      1.5%    $60.00      $61.00     1.7%
 Sites
 Unpowered
              $45.00     $46.00   2.2%      $58.00     $59.00      1.7%    $51.00      $52.00     2.0%
 Sites
 Unpowered
 Waterfront   $49.00     $50.00   2.0%      $64.00     $65.00      1.6%    $56.00      $57.00     1.8%
 Sites
 Powered
 Motorhome    $47.00     $48.00   2.1%      $63.00     $64.00      1.6%    $54.00      $55.00     1.9%
 Bay


Table 4. Other Noosa Holiday Park Fees and Charges
                                  12 July 2022 to 23 January 2023
                                                                      Current   Proposed        Change
Extra Persons Nightly – Over 5 Years – Boreen Point & Northshore      $11.50     $11.50          0.0%
Extra Persons Nightly – Over 5 Years – Noosa River                    $13.50     $13.50          0.0%
Unpowered short term budget site – Noosa River                        $32.00     $32.00          0.0%
Extra Vehicles Nightly – if space allows                               $5.50     $5.50           0.0%
Public Use of Amenities – Per Day                                      $4.00     $4.00           0.0%
Group Fee (20 +) – per booking                                        $12.50     $12.50          0.0%
Late Checkout                                                         $16.50     $16.50          0.0%
Washing Machine Charges                                                $5.00     $5.00           0.0%
Dryer Charges                                                          $2.00     $4.00          100.0%
Electricity – Daily Access Charge per day                              $1.20     $1.20           0.0%
Electricity – Usage rate per kWh                                       $0.45     $0.45           0.0%
Administration Fee (Cancellations & Amendments)                       $30.00     $30.00          0.0%

Previous Council Consideration
Ordinary Meeting Minutes, 19 December 2019, Item 4, Page 9
That Council note the report by the Property Manager to the Services & Organisation Committee
Meeting dated 10 December 2019; and
A.   Set fees and charges for the Noosa River Holiday Park to 30 June 2021 as detailed in Table
     1 of this report; and
B.   Note that a 2020/21 capital program budget submission will be made for the metered
     powerhead installation project (incorporated in the Zero Emissions Noosa Project
     Implementation budget submission); and C. Note that subject to approval of the capital budget
     in the 2020/21 budget, a user pays electricity system for electricity consumption at the Noosa
     River Holiday Park will be implemented from 1 July 2021 (detailed as Option 3 in the report);
     with applicable fees and charges considered as part of the 2021/22 budget process.
Ordinary Meeting Minutes, 17 December 2020, Item 2, Page 6
That Council note the report by the Property Advisor – Commercial Property to the Services &
Organisation Committee Meeting dated 8 December 2020 and:
A.   Set fees and charges for the Noosa Holiday Parks to align with the cessation of the end of the
     July 2022 Queensland school holidays; and
B.   Adopt the Proposed General Cost Recovery Fees and Commercial Charges schedule for
     Noosa Holiday Parks for the period ending Monday 11 July 2022 as detailed in the tables
     contained within the report.


                                                                                        Page 52 of 67

Section 53

GENERAL COMMITTEE MEETING AGENDA                                                      18 OCTOBER 2021


Finance
•      Profits from the Noosa Holiday Parks offset general rate increases and also contribute to
       Council meeting its financial sustainability policy requirements.
•      Council business activities (waste management, holiday parks) are required to operate on a
       full cost pricing (FCP) basis to ensure the competitive neutrality principle is complied with.
       Holiday park advance fees have been set considering likely inflation movements in materials
       and services and resulting FCP implications.
Risks & Opportunities
Risks:

•      Failure to apply the competition neutrality principle via full cost pricing is a breach of the Local
       Government Act 2009 and could also potentially result in competitive neutrality complaints to
       the Queensland Competition Authority.
•      Failure to extend the fees and charges period exposes Council to a reduction in forward
       bookings, which effects Council’s financial returns and ability to forward financial plan.
Opportunities:

•      Fees are set to ensure ongoing full cost recovery occurs for the business activity at all Noosa
       Holiday Parks.
•      A marketing and branding project has been completed, with new branding for the Noosa
       Holiday Parks and creation of a new website and mobile platform.
Consultation
External Consultation - Community & Stakeholder
Nil

Internal Consultation
Director Corporate Services
Property Manager
Financial Services Manager


Departments/Sections Consulted:

      Chief Executive Officer      Community Services                       x   Corporate Services
      Executive Support            Director                                 x   Director
                                   Community Development                    x   Financial Services
                                   Community Facilities                         Fleet
                                   Libraries & Galleries                        ICT
                                   Local Laws                                   Procurement
                                   Waste & Environmental Health             x   Property
                                                                                Revenue Services

      Executive Services           Environment & Sustainable Development        Infrastructure Services
      Director                     Director                                     Director
      Community Engagement         Building & Plumbing Services                 Asset Management
      Customer Service             Development Assessment                       Buildings and Facilities
      Governance                   Economic Development                         Civil Operations
      People and Culture           Environmental Services                       Disaster Management
                                   Strategic Land Use Planning                  Infrastructure Planning,
                                                                                Design and Delivery




                                                                                             Page 53 of 67

Section 54

GENERAL COMMITTEE MEETING AGENDA                                                                     18 OCTOBER 2021


12        FINANCIAL PERFORMANCE REPORT – SEPTEMBER 2021

Author                Manager Financial Services (Acting), Pauline Coles
                      Corporate Services Department

Index                 ECM/ Subject/ 22.09 – Monthly Financial Performance Report

Attachments           1.       Statement of Income and Expenditure (Profit & Loss and Capital)
                      2.       Statement of Financial Position
                      3.       Statement of Cash Flows
                      4.       Summary of Materials and Services Expenditure


EXECUTIVE SUMMARY

Year-to-date (YTD) performance against current budget as at 30 September 2021 is positive with
both operating revenues outperforming forecast and operating expenditure slightly under forecast
YTD. Capital revenues and expenditures are in line with forecast.

 YTD Financial Performance Summary
                                        Budget            Actual        Variance      Variance           Status
                                           $m                $m              $m             %
 Operating Revenue                        $44.4            $46.1               $1.7           3.7%      On Track
 Operating Expense                        $25.9            $25.6               $0.3           1.3%      On Track
 Operating Position                       $18.5            $20.5               $2.0      10.7%
 Capital Revenue                            $4.4             $4.4              $0.0           0.0%      On Track
 Capital Expenditure*                       $5.1             $5.0              $0.0           0.5%      On Track
* Reflects constructed assets and intangibles only (excludes contributed)


Financial statements including Statement of Income & Expenditure, Statement of Financial Position
(balance sheet), and Statement of Cash Flows are included as attachments for information for
Council.

Figure 1: Actual Performance Compared to Budget

  $50
                           $44.4       $46.1          YTD Budget ($m)
  $45
                                                      YTD Actual ($m)
  $40
  $35
  $30
                                                                            $25.9     $25.6
  $25
  $20
  $15
  $10
     $5
     $-
                       Operating Revenue                                Operating Expenditure




                                                                                                         Page 54 of 67

Section 55

GENERAL COMMITTEE MEETING AGENDA                                                       18 OCTOBER 2021


Council’s performance against key measures of financial sustainability have been calculated as at
September 2021. These indicators enable the reader to assess Council’s success in managing its
budget, cash and debt as well as undertaking sustainable asset management. The table below
contains a snapshot of a number of key measures, with full detail included in the report.

 YTD Measures of Financial Sustainability
                                     Target       Current      Actual YTD
                                                  Budget
 Operating Surplus Ratio            0-10%         -0.6%          44.5%          On Track
 Net Financial Liabilities Ratio    <60%          -8.0%         -101.8%         On Track
 Cash Cover Ratio                  3 months    7.3 months     12.5 months       On Track
 Asset Sustainability Ratio         > 90%        121.9%          10.1%          On Track


RECOMMENDATION
That Council note the report by the Acting Manager Financial Services to the General Committee
Meeting dated 18 October 2021 outlining September 2021 year to date financial performance against
budget, including changes to the financial performance report with the inclusion of key financial
sustainability indicators.


REPORT
Operating Revenue (YTD Benchmark 25.0%)
Council has received 43% ($46.1 million) of its operating revenue budget ($107.2 million).
Commentary on each revenue category is provided below.

 Category              Summary                          Comments
 Rates and Levies      $37.4 million (50%) of the       •   Waste utility charges $324k above YTD budget
                       annual budget of $74.6 million       (52% or $6.7 million of $12.9 million budget
                       has been earned                      earned)
                                                        •   General rate (net of discount) $139k below YTD
                                                            budget (50% or $28.5 million of $57.2 million
                                                            budget earned)
 Fees and              $3.0 million (41%) of the $7.2   •   Development assessment fees $405k above
 Charges               million annual budget has            YTD budget (44% or $822k of $1.8 million
                       been earned                          budget earned)
                                                        •   Plumbing application fees $169k above YTD
                                                            budget (44% or $452k of $1.0 million budget
                                                            earned)
                                                        •   Building application fees $70k above YTD
                                                            budget (32% or $252k of $791k budget earned)
 Sale of Goods         $3.0 million (29%) of the        •   Waste management sale of recoverable
 and Services          $10.2 million budget has been        materials $276k above YTD budget (30% or
                       received                             $1.4 million of $4.6 million budget earned).
                                                        •   Holiday Park sales $167k above YTD budget
                                                            (32% or $908k of $2.8 million budget earned) –
                                                            offset by higher operating costs
                                                        •   Community Facilities (NAC, NLC and The J)
                                                            $136k above YTD budget (24% or $620k of $2.6
                                                            million budget earned) – offset by higher
                                                            operating costs




                                                                                             Page 55 of 67

Section 56

GENERAL COMMITTEE MEETING AGENDA                                                                         18 OCTOBER 2021


 Category               Summary                                Comments
 Interest               $193k (29%) of the $670k               •     Interest revenues on cash invested will need
 Received               annual budget has been                       ongoing monitoring given low interest rates and
                        earned                                       impacts on term deposit / cash fund rate return
 Other Revenue          $642k (21%) of the $3.1                •     Other revenue is in line                       with   budget
                        million budget has been                      expectations at this stage
                        earned
 Operating              $1.6 million (28%) of the $5.8         •     Operating grants are in line with budget
 Grants,                million budget has been                      expectations at this stage.
 Subsidies              received                               •     50% ($1.2 million) of the financial assistance
                                                                     grant was again prepaid in June 2021 and may
                                                                     impact on Council’s 2021/22 final operating
                                                                     position if the prepayment approach is
                                                                     discontinued by the Australian government.
 Unitywater             On track                               •     Unitywater distributions are fixed each year so
 Distributions                                                       little budget variance risk

Figure 2: Operating Revenue Position by Type (Excluding Rates)

  $3.5
                 $3.0                        $3.0                         YTD Budget ($m)
  $3.0
                                                                          YTD Actual ($m)
         $2.2                         $2.4
  $2.5

  $2.0
                                                                                              $1.6
                                                                                   $1.5
  $1.5

  $1.0
                                                    $0.4 $0.4                                        $0.3 $0.3
  $0.5                                                               $0.2 $0.2
                         $0.2 $0.2

  $0.0
             Charges




                                                                         Other
                                                     Income




                                                                                     Grants
                                       Goods &




                                                                                                       Unitywater
                                       Services
                                       Sales of




                                                      Rental
                           Interest
             Fees &




                                                                                                        Share of




Operating Expenditure (YTD Benchmark 25.0%)
Actual operating expenditure is currently 24% ($25.6 million) of full year budget ($107.9 million).
Detailed commentary for each expenditure category is provided below.

 Category               Summary                                Comments
 Employee Costs         $8.2 million (22%) of the              •     Under expenditure for permanent staff salaries
                        annual budget of $37.7 million               and wages ($753k) partially offset by additional
                        has been expended                            spend on casual staff and external labour hire
                                                                     ($322k).
 Materials and          $12.1 million (25%) of the             •     Waste Management $143k below YTD budget
 Services               $49.3 million annual budget                  (22.6% or $2.5 million of $11.1 million budget
                        has been expended.                           spent)
                                                               •     Holiday Parks $148k above YTD budget (34.0%
                                                                     or $488k of $1.4 million budget spent) – offset
                                                                     by additional revenue
 Finance Costs          On track                               Nil
 Depreciation           On track                               Nil
 Other Expenses         On track                               Nil

                                                                                                                    Page 56 of 67

Section 57

GENERAL COMMITTEE MEETING AGENDA                                                                                                 18 OCTOBER 2021


Figure 3: Operating Expenditure Position by Type

$14.0
                                      $12.3 $12.1                                            YTD Budget ($m)
$12.0
                                                                                             YTD Actual ($m)
$10.0
            $8.4               $8.2
 $8.0

 $6.0
                                                                                                    $4.9                  $4.9

 $4.0

 $2.0
                                                               $0.3                   $0.3                                         $0.1           $0.1
 $0.0
                                                                      Finance Costs
                                          Materials




                                                                                                           Depreciation
                   Employees




                                                                                                                                          Other
Tourism and Economic Development Investment
Council resolved to report on a monthly basis investment details for tourism and economic
development. Expenditure as at 30 September 2021 is outlined below, which includes the first
instalment payment to Tourism Noosa under the funding agreement.
 Expenditure                                          Annual     YTD                              YTD
                                                      Budget   Budget                           Actual
                                                         $m       $m                               $m
 Payment to Tourism Noosa                              $2.52     $1.26                           $1.26
 Economic Development                                  $0.95     $0.16                           $0.12
 Total                                                 $3.47     $1.42                           $1.38


Capital Revenue
YTD capital revenue of $4.4 million received comprises cash contributions from developers ($1.0
million) and capital grants ($3.4 million). Note that the timing of capital grant receipts are generally
dependent on the timing of grant conditions and also capital delivery performance, and that the timing
of the receipt of developer contributions (both cash and contributed) is unpredictable.




                                                                                                                                     Page 57 of 67

Section 58

GENERAL COMMITTEE MEETING AGENDA                                                                  18 OCTOBER 2021


Figure 4: Capital Revenue by Type

  $4.0
                                              $3.4               $3.4
  $3.5
                                                                        YTD Budget ($m)
  $3.0
                                                                        YTD Actual ($m)
  $2.5
  $2.0
  $1.5
                $1.0                   $1.0
  $1.0
  $0.5
                                                                             $-                   $-
  $0.0
                       Contributions




                                                     Subsidies




                                                                                   Contributed
                                                      Grants /




                                                                                     Assets
                          Cash




Capital Program
Actual capital expenditure (excluding commitments) is $5.0 million (YTD budget $5.1 million).
Detailed discussion of progress in the delivery of the capital works program is provided through a
separate quarterly report by the Asset Planning Manager.

Figure 5: Capital Program Delivery Performance

 $4.5
                $4.1                   $4.1
 $4.0
                                                     YTD Budget ($m)
 $3.5                                                YTD Actual ($m)
 $3.0

 $2.5

 $2.0

 $1.5

 $1.0                                                                       $0.6                 $0.6
 $0.5                                         $0.4               $0.3

 $0.0
                Capital works                 Other capital                Loan redemption




Cash Management and Investment Performance
Total cash on hand at the end of September was $91 million. Included in this balance are funds held
in trust and for restricted purposes (e.g. unexpended levy and grant funds), prepaid grants including
the financial assistance grant and other capital works grants, July rates payments received, and
unspent monies committed for funding capital projects which are underway and carrying over from
2020/21 into the 2021/22 financial year.

The following pie charts present the mix of cash held at September 2021 by agency (graph on the
left) and by credit risk rating (graph on the right). All funds have been invested in accordance with

                                                                                                        Page 58 of 67

Section 59

GENERAL COMMITTEE MEETING AGENDA                                                                           18 OCTOBER 2021


the Investment Policy and in consideration of the principles of ethical investment, preservation of
capital, return on investment and counterparty thresholds

Figure 6: Closing Cash Held by Agency and Credit Rating


                            CBA                                                            A1 +
                            5%                                                        (Commercial Banks)
                                                                                            5%




                                                                                                  A1 +
                                    QTC                                                          (QTC)
                                    95%                                                           95%




The following chart monitors the year-to-date trend on total cash and the agencies invested. Cash
balances are at the peak of the cycle following the bi-annual issue of rates and levies in July and
payments received to September.

Figure 7: 12 Month Trend of Cash Invested by Agency
 120,000,000



 100,000,000



  80,000,000



  60,000,000



  40,000,000



  20,000,000



          -
              Oct-20   Nov-20   Dec-20   Jan-21   Feb-21   Mar-21   Apr-21   May-21   Jun-21   Jul-21   Aug-21     Sep-21


               Bendigo TD         Westpac TD        NAB TD          Suncorp TD        CBA TD        QTC          CBA Operating




Measures of Financial Sustainability
The following table incorporates a set of financial sustainability indicators to further assist in
managing Council financial performance. There are no current emerging risks regarding
performance noting the early stage of the financial year.

                                                                                                                    Page 59 of 67

Section 60

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                                                  18 OCTOBER 2021



Category                                                                                                                                                                          Comments
Operating Surplus Ratio                                                                                                                                                           •   Intent: Identifies the extent to
                                     90% 82.6%                                                                                                                                        which revenues cover operational
                                     80%                                                                                                                                              expenses, to ensure community
                                     70%                                                                                                                                              equity is not degraded
                                                       60.9%
                                     60%                                                                                                                                          •   Target: 0 – 10%
                                     50%                          44.5%
                                                                                                                                                                                  •   Result: 44.5%
                                     40%
                                                                                                                                                                                  •   Comment: The high ratio reflects
                                     30%
                                                                                                                                                                                      the levying of rates in July, which
                                     20%
                                                                                                                                                                                      will degrade as expenditure
                                     10%
                                                                                                                                                                                      occurs on operations through to
                                      0%
                                                                                                                                                                                      the next rate run in January 2022
                                     -10%
                                                Jul        Aug        Sep       Oct       Nov        Dec        Jan        Feb        Mar        Apr        May        Jun
                                                                                                                                                                                      and end of the financial year at 30
                                                                                                                                                                                      June 2022
                                                                 Actual                                Budget                                      Target


Cash Expense Cover                                                                                                                                                                •   Intent: Indicates how long council
                                     14.0                                                                                                                   12.8
                                                                                                                                                                                      can continue paying its day-to-
                                                                                          12.5       12.2                                                              12.5
                                                                                                                                                                                      day expenses from cash at bank
 Months (Cash to Cover Operations)




                                                                                                                11.6
                                     12.0                                                                                  10.9
                                                10.7
                                                           10.1                                                                       10.1       10.4                                 without needing additional cash
                                                                                9.7
                                     10.0                             9.1                                                                                                             flows
                                      8.0
                                                                                                                                                                                  •   Target: > 3 months
                                                                                                                                                                                  •   Result: 12.5 months
                                      6.0
                                                                                                                                                                                  •   Comment: Whilst current cash
                                      4.0                                                                                                                                             cover remains above target,
                                      2.0                                                                                                                                             business as usual expenditure
                                                                                                                                                                                      through to 30 June 2022 will
                                       -
                                                Oct
                                                       -
                                                           Nov
                                                                  -
                                                                      Dec
                                                                            -
                                                                                Jan
                                                                                      -
                                                                                          Feb
                                                                                                 -
                                                                                                     Mar
                                                                                                            -
                                                                                                                Apr
                                                                                                                       -
                                                                                                                           May
                                                                                                                                  -
                                                                                                                                      Jun
                                                                                                                                             -
                                                                                                                                                 Jul
                                                                                                                                                        -
                                                                                                                                                            Aug
                                                                                                                                                                   -
                                                                                                                                                                       Sep
                                                                                                                                                                              -
                                                                                                                                                                                      degrade Council’s cash holdings,
                                                                                                                                                                                      albeit not below the target range
                                                           Actual                                                                Minimum (>0 months)                                  of 3 – 6 months.
                                                           Target (3 months)                                                     Maximum (6 months)

Asset Sustainability Ratio                                                                                                                                                        •   Intent: Measures the extent to
                                     140%                                                                                                                                             which assets are being replaced
                                                                                                                                                                   121.9%             as their condition degrades to
                                     120%
                                                                                                                                                                                      ensure service potential is
                                     100%                                                                                                                                             maintained
                                      80%
                                                                                                                                                                        90%
                                                                                                                                                                                  •   Target: 90% of depreciation
                                                                                                                                                                                      budget spent on renewals
                                      60%                                                                                                                                             annually
                                      40%                                                                                                                                         •   Result: In line with budget
                                      20%
                                                                                                                                                                                  •   Comment:        The     ratio  will
                                                           6.5% 10.1%                                                                                                                 progressively     increase    each
                                                0.9%
                                           0%                                                                                                                                         month     as     expenditure    on
                                                 Jul       Aug        Sep       Oct       Nov        Dec        Jan        Feb        Mar        Apr        May        Jun
                                                                                                                                                                                      renewals occurs as part of the
                                                 Actual Renewal Spend (%)                                  Target (%)                    Renewals Budget (%)                          capital works program.




                                                                                                                                                                                                         Page 60 of 67

Section 61

GENERAL COMMITTEE MEETING AGENDA                                                                                                                               18 OCTOBER 2021


 Category                                                                                                                                     Comments
 Net Financial Liabilities Ratio                                                                                                              •   Intent: Outlines the level that net
                                                                                                                                                  Council debt can be serviced by
                                     80%
                                                              60%                                                                                 operating revenues. A ratio below
                                     60%
                                                                                                                                                  zero implies that liabilities are less
                                     40%                                                                                                          than cash (and other current
                                     20%                                                                                                          assets) and there is adequate
                                           0%
                                                                                                                                                  borrowing capacity available if
                                                             Target                        Budget                       YTD Actual                needed.
                        -20%
                                                                                            -8%                                               •   Target: less than 60%
                        -40%
                                                                                                                                              •   Result: -102%
                        -60%
                                                                                                                                              •   Comment: Council has low debt
                        -80%
                                                                                                                                                  levels and strong cash holdings.
   -100%                                                                                                                                          Cash received from the July rates
                                                                                                                          -102%                   revenue also inflates the YTD
   -120%
                                                                                                                                                  actual position
 Investment Return                                                                                                                            •   Intent: Ensure appropriate return
                                                                                                                                                  on investment yield for cash at
                                                                                                                                                  bank.
                                                                                                                                              •   Target: 0.25% above current
                                                                                                                                                  Bloomberg commonwealth 10
                                                                                                                                                  year bond rate yield (0.01%)
                                                                                                                                              •   Result: 0.74%
                                                                                                                                              •   Comment: Regardless of the
                                                                                                                                                  current levels of low long term
                                                                                                                                                  bond and interest rates (due to
                                                                                                                                                  current economic conditions),
                                                                                                                                                  Council’s investment return still
                                                                                                                                                  remains above target
 Rates in Arrears                                                                                                                             •   Intent: Ensuring that the amount
                                                                                                                                                  of    unpaid    rates      remains
                                            12.0%
   Percentage of Annual Rates in Arrears




                                                                                                                                      10.2%       sustainable    and    does     not
                                            10.0%                                          9.5%                                                   negatively impact cash flows
                                                                                                  7.4%                                        •   Target: 5% industry benchmark
                                                8.0%   7.1%
                                                              6.0% 5.8% 5.7%                              6.2%                                •   Result: 10.2%
                                                                                                                 5.7%
                                                6.0%                              5.0%                                  5.2%
                                                                                                                               4.6%           •   Comment: Rates arrears are at
                                                4.0%
                                                                                                                                                  the high point in the cycle with
                                                                                                                                                  payments due in September.
                                                2.0%                                                                                              Reminder notices will be issued in
                                                                                                                                                  October, and will stablise through
                                                0.0%
                                                                                                                                                  to January as arrears are
                                                       Oct     Nov    Dec   Jan    Feb     Mar      Apr   May    Jun     Jul   Aug    Sep
                                                                                                                                                  collected      and        payment
                                                                                  Actual             Target                                       arrangements implemented.


Previous Council Consideration
Nil.

Finance
As above.

Risks & Opportunities
Council’s risk register includes a number of risks that could impact on ongoing financial sustainability.
Effective budget management and reporting is an important risk mitigation tool.


                                                                                                                                                                      Page 61 of 67

Section 62

GENERAL COMMITTEE MEETING AGENDA                                                       18 OCTOBER 2021


Consultation
External Consultation - Community & Stakeholder
Nil.

Internal Consultation
All areas of Council are consulted as part of the regular monitoring of budget performance.

Departments/Sections Consulted:

 X     Chief Executive Officer   X   Community Services                      X   Corporate Services
       Executive Officer             Director                                X   Director
       Executive Support             Community Development                   X   Financial Services
                                     Community Facilities                        ICT
                                     Libraries & Galleries                       Procurement & Fleet
                                     Local Laws                                  Property
                                     Waste & Environmental Health                Revenue Services

 X     Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
       Director                      Director                                    Director
       Community Engagement          Building & Plumbing Services                Asset Management
       Customer Service              Development Assessment                      Buildings and Facilities
       Governance                    Economic Development                        Civil Operations
       People and Culture            Environmental Services                      Disaster Management
                                     Strategic Land Use Planning                 Infrastructure Planning,
                                                                                 Design and Delivery




                                                                                              Page 62 of 67

Section 63

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021


 Attachment 1




                                       Page 63 of 67

GENERAL COMMITTEE MEETING AGENDA                                                                    18 OCTOBER 2021

   Attachment 1

      Profit and Loss Statement
      Revenue
         Recurrent Revenue
         Rates, levies and charges                          74,591         37,197         37,403           206        50%
         Fees and charges                                   7,185          2.225           2,958           733        41%
         Interest received                                    670             192            193              1       29%
         Sale of Goods and major services                   10,224         2,366          2,967            601        29%
         Sale of contract and recoverable works               23                -              0              0        0%
         Rental & lease income                               1,885           406            437              vu       23%
         Other income                                        1,224           221            205             (16)      17%
         Grants, subsidies, contributions and donations      5,797          1,515          1,610            96        28%
         Unitywater Distributions                           5,650            325            325               -       6%
                                                           107,248        44,447         46,098           1,651       43%
      Expenses
         Recurrent Expenses
         Employee benefits                                  37,701         8,377          8,240             137       22%
        Materials and services                             49,03           12,303         12,103           200        25%
         Finance costs                                       1,114           287            292              (5)      26%
        Depreciation                                        19,589          4,897          4,899             (1)      25%
        Other expenses                                        233             87             64               3      _27%
                                                           107,941        25,932          25,598           334        24%
    OperatingResult                                          682)          18,81          20,500           984
      Summary of Capital Expenditure and Funding
      Capital Funding
        Capital cash contributions and infrastructure charges 1,397         1,049          1,049              0       75%
        Contributed assets                                   1,500              -              -              -        0%
         Capital grants and subsidies                      24,984          3,373           3,373              -       13%
         Cash / revenue                                    24,954            645            664             20         3%
         New loan borrowings                                2,360               -              -              -        0%
        Other capital revenue                                    -              -              -              -        0%
    TotalCapitalFunding                               A806                                  OBE
      Capital Expenditure
         Contributed assets                                  1,500              -              -              -        0%
         Capital works - constructed assets                 47,579          4,051          4,052              1        9%
         Capital works - other capital                       4,818           368            sO             (27)        7%
         Loan redemption                                     1,297           648            648               -       50%
        Other capital expenses                                   -              -            45             45         0%
    Total CapitalExpenditure                               85H              S06T          508

                                                                                                           Page 63 of 67

Section 64

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021


 Attachment 2




                                       Page 64 of 67

GENERAL COMMITTEE MEETING AGENDA                                                                  18 OCTOBER 2021

   Attachment 2

      Current Assets
           Cash and cash equivalents                                    49,747                90,954                  68,895
           Trade and other receivables                                   10,137                10,775                  7,467
           Inventories                                                     181                    149                    144
           Contract Assets                                                    -                   487                    487
           Other current assets                                          2,912                  4661                   4,955
                                                                        62,978                107,026                 81,948
           Non Current Assets held for sale                                   -                      -                     -
     Total Current Assets                                               62,978                107,026                 81,948
      Non Current Assets
           Trade and other receivables                                  49,593                 49,468                 49,468
           Other non current Assets                                           -                      -                     -
           Investments                                                  88,040                 92,434                 92,434
           Investment property                                            3,000                 2,900                  2,900
           Property, plant and equipment                              1,009,996              952,140                 952,579
           Right of Use Assets                                             161                    89                      89
           Intangible assets                                              8,128                 7,987                  8,115
     Total Non Current Assets                                         1,158,917              1,105,017             1,105,585
     Total Assets                                                     1,221,895              1,212,043             1,187,532
      Current Liabilities
           Trade and other payables                                       7,151                13,302                 10,468
           Contract Liabilities                                               -                 4377                   4,377
          Borrowings                                                       848                    461                    955
           Lease Liablities                                                   -                   25                      25
          Provisions                                                      7,582                 2497                   4,947
          Other                                                          4.780                  2,555                  2,898
     Total Current Liabilities                                          20,361                 23,216                 23,669
      Non Current Liabilities
          Borrowings                                                    21,989                20,258                  20,258
           Lease Liabilities                                               110                    66                      66
          Provisions                                                     15,307                16,555                 16,555
     Total Non Current Liabilities                                      37,406                36,879                  36,879
     Total Liabilities                                                  57,767                60,095                  60,549
      Net Community Assets                                           1,164,128              1,151,948              1,126,984
      Community Equity
           Asset Revaluation Surplus                                    121,483               108,561                108,473
           Retained Surplus / (Defeciency)                                    -                      -                     -
           Shire Capital                                              1,042,645              1,008,596              1,004,202
           Current Year Net Earnings                                          -               34,791                  14,309
     Total Community Equity                                          1,164,128              1,151,948              1,126,984

                                                                                                         Page 64 of 67

Section 65

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021


 Attachment 3




                                       Page 65 of 67

GENERAL COMMITTEE MEETING AGENDA                                                                18 OCTOBER 2021

   Attachment 3

    Cash flows from operating activities
         Cash Flows from Operating Activities
         Receipts from Customers                                            92,622            42,513             93,975
         Payments to Suppliers and Employees                               (87,376)           (22,606)           (84,528)
                                                                              5,246            19,907             9,447
         Receipts:
         Investment and Interest Revenue Received                             3,270              193              3,401
         Rental Income                                                        1,874              437               1,365
         Non Capital Grants and Contributions                                 5,765             1,610             6,085
         Income Tax Equivalent Received                                       1,200              325               1,450
         Income from Equity Investments                                       1,850                 -              1,600
         Payments:
         Borrowing Costs                                                          -                 -             (2,499)
         Interest Expense                                                      (516)              (44)             (131)
        Net Cash Inflowi(Outflow) from Operating Activities ==              18,6900           22.428            20,719
    Cash Flows from Investing Activities
         Receipts:
         Proceeds of Sale of Property, Plant and Equipment                        -               103               217
         Grants, Subsidies, Contributions and Donations                     26,381              4,422             13,679
         Payments:
         Payments of Property, Plant and Equipment                          (51,568)           (4,286)           (22,721)
         Payments for Intangible Assets                                       (829)              (106)            (1,385)
         Net Movement in Loans and Advances                                       -               125               125
        Net Cash Inflow/(Outflow) from Investing Activities ==             (26,017)              288            (10,085),
    Cash Flows from Financing Activities
         Receipts:
        Proceeds from Borrowings                                              2,360                 -             2,500
         Payments:
         Repayment of Borrowings                                              (736)              (626)            (1,263)
        Net Cash Inflow/(Outflow) from Financing Activities =                4,628              (626)             8,287
        Net Increase/(Decrease) in Cash and Cash Equivalents held =         (5,704)           22,060             14,871
        Cash and Cash Equivalents at the beginning of the reporting period  55,451            68,894             57,023
        ‘Cash and Cash Equivalents at the end of the reporting period. §=   49,747,           90,954             68,884

                                                                                                       Page 65 of 67

Section 66

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021




 Attachment 4




                                       Page 66 of 67

GENERAL COMMITTEE MEETING AGENDA                                                                    18 OCTOBER 2021

   Attachment 4

         Materials and services
        Advertising and Marketing                             227              47            43               5        19%
        Administration Supplies and Consumables               751             177            172              5        23%
        Audit Expenditure                                     174              11             12             (1)       7%
         Communications and IT                               684             240             242            (2)        35%
         Commission Paid                                     1,079           272            340             (68)       32%
         Consultancy Services                                1,166           216            209               7        18%
         Contract Services                                 23,482           4,904          4,708            195        20%
         Contributions, Donations, Sponsorship and Prizes    3,471          1,596           1,568           28         45%
        Electricity                                          1,729           431            406             25         24%
        Intemal Fleet Costs and External Plant Hire          1,668           334             422            (88)       25%
         Grants Paid to Community Organisations              1,934            743            728             16        38%
        Insurance                                            690             641            627              14        91%
         Legal Expenses                                      1,272           292            363             (71)       29%
         Operating Leases and Rentals                         292             73             73              (0)       25%
        Software and Maintenance                            2,166             612           628             (17)       29%
         Subscriptions and Registrations                      291             170            172            (3)        59%
         Waste Levy Payments                                 1,460           365             375            (10)       26%
         Water and Sewerage Charges                          1,084           260            204             56         19%
        All Other Materials and Services                    5.684            919            809             109        14%
                                                           49,303          12,303          12,103          200         25%

                                                                                                           Page 66 of 67

Section 67

GENERAL COMMITTEE MEETING AGENDA   18 OCTOBER 2021


7      CLOSED SESSION

Nil.




                                       Page 67 of 67

GENERAL COMMITTEE MEETING AGENDA                             18 OCTOBER 2021

7    CLOSED SESSION

Nil.

                                                                 Page 67 of 67

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.