GENERAL COMMITTEE MEETING AGENDA 18 OCTOBER 2021
HYDROLOGY
Stormwater Drainage
22. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works approval
and must include in particular:
a. a Site Based Stormwater Management Plan which addresses the following:
i. existing overland flows and proposed overland flows;
ii. maintenance of overland flows within the subject site; and
iii. the drainage system for all roofed areas, hardstand, grassed areas and pool
surrounds.
Erosion and Sediment Control
23. In conjunction with the application for Operational Works approval, provide an erosion and
sediment control plan, prepared in accordance with Best Practice Erosion and Sediment
Control (IECA, 2008) and which achieves the construction phase stormwater design objectives
of the State Planning Policy 2017.
WASTE DISPOSAL
24. The developer must provide waste storage and disposal facilities in accordance with Planning
Scheme Policy 9 - Waste Management. The facilities must include an impervious area, within
the site, correctly sized for all refuse and recycling containers and suitably screened from public
places and neighbouring properties. A bin wash area is required with a cold-water tap, hose
and drain outlet connected to sewer, via a bucket trap. The drain outlet must be designed to
prevent storm water entry to the sewerage system.
25. Refuse containers must be provided in accordance with the requirements of the Environmental
Protection (Interim Waste) Regulation 1996 and (Waste Management) Regulation 2000, for
the storage and collection of refuse.
ENGINEERING
External Works
26. Margit Crescent must be upgraded for the length of its frontage to the subject site. The works,
which must be undertaken in accordance with an Operational Works approval, are:
a. construction of a pedestrian footpath in accordance with the conditions of this Decision
Notice
b. removal of all existing property access (driveway/crossovers) and reinstatement of the
kerb, footpath and verge area to match the balance of the site frontage, including the
provision of topsoil and turf where the existing verge is grassed.
Site Access and Driveways
27. A sealed access driveway must be provided from Margit Crescent to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance with an
Operational Works approval and must include in particular:
a. a driveway crossover in accordance with Council standard drawings RS-051 and
addendums
Car Parking
28. Car parking must be provided generally in accordance with the approved plans. The works
must be undertaken in accordance with an Operational Works approval and must include in
particular:
Page 16 of 67
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.