Council archive · source document
Appendix B Sheet Piling Layout · MCU18/0013
Attached to the e-mail Detached House - MCU18/0013.
Attached to the e-mail Operational Works Application OPW18/0264.
20
21
N
LINE 22
BOUNDARY
23
24
BOUNDARY LINE 25 SEWER
26 EXISTING
27
28
Wall 4 - 22834
EXISTI NG SEWER
Arakoon Cr
UPPER FLOOR BH1
ROPOSED SEWER
SITE PLAN
FFL 23.65
LOWER FLOOR
US/F 22.95
FFL 20.70
US/F 20.00 Water Tank
Wall 3 - 11175
R
Wall 5 - 11859
WE
SE
FFL 20.70
ING
H/A4 Lift Pit US/F17.3
IST
EX
FFL 19.30
US/F 18.80
369 25
4328
BH2
H/A3
POSED SEWER
26.5
26 BOUNDARY
LINE
22
27
24
07
23
2 - 98
1
27
- 1049
27 .5
Assumed Assumed
Wall
US/F 22.95 US/F 20.00
Wall 6
Acc Wall
1-1
ess
733
1
Roa
d PRELIMINARY
in.
0m
250
Project Name: Project/Job No:
SUNSHINE BEACH
BSQ06-03
Path
26 Arakoon Crescent
way
MAC DONALD Company: Rev. Size.
SHEET PILING
Bligh Tanner A4
& ANCHORING
SYSTEM
A
Scale: Date: Drawn By: Drawing No.
1:200 10.01.2006 DP BSQ06-01
Copyright - MacDonald Sheetpiling Qld. This document is subject to copyright. no portion can be copied or distributed to third parties without prior consent from MacDonald Sheetpiling Qld.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix B Sheet Piling Layout.pdfRelated documentApplication case desk ↗
20180333 - Existing Sheet Piling Layout - MSP.PDFRelated documentApplication case desk ↗
About this file
- File size
- 295 KB (small file)
- File type
No other editions are linked here.