Table 5-2 Noosa Plan Natural Hazards Overlay Code compliance assessment
Specific Outcomes Probable Solutions Noosa on Weyba Response
13.33 Effects of use and works
New Uses
O4 The proposed use does not S4.1 The use is sited on land that is not Complies: For the reasons
compromise the safety of people or in a Medium or High Bushfire Hazard specified in Section 4, the
38
property from bushfire. Area ; or proposed use does not
compromise the safety of people
S4.2 The use is sited on land that is or property from bushfire.
determined as low bushfire risk by a site
39
specific bushfire hazard assessment.
Protection of Infrastructure and
Community Uses
O5 Community Uses and S5.1 Community Uses and Infrastructure Not Applicable: The Noosa on
Infrastructure Uses, including that Uses are not located in a High or Medium Weyba project does not involve
identified below, are able to function Bushfire Hazard Area identified on any Community Uses or
effectively during and immediately Overlay Maps OM1.4 to OM9.4; Infrastructure Uses.
after bushfire events— OR
a) Emergency service facilities; S5.2 Building work will not involve more
2
b) Hospitals; than an additional 20m of gross floor
c) Education Type 4 uses, including area to an existing building;
stores for valuable records or items OR
of historic or cultural significance; and S5.3 Where located in a High or Medium
d) Service and utility uses, including Bushfire Hazard Area identified on
electricity substations, major Overlay Maps OM1.4 to OM9.4, uses are
electrical depots and water treatment designed to function effectively during
40
plants. and immediately after bushfire events .
Hazardous materials
O6 Public safety and the environment S6.1 Hazardous materials are not Not Applicable: The Noosa on
are not adversely affected by the manufactured and stored on the site. Weyba project does not involve
detrimental impacts of bushfire on any hazardous materials
hazardous materials manufactured or manufacture or bulk storage.
stored in bulk.
13.34 Siting, design and construction
O7 Uses and works including S7.1 Uses and works including building Complies: As detailed in Section
building works are sited, designed works are sited— 4 herein the Noosa on Weyba
and constructed to— project complies with S7.1 and
2
a) minimise the number of people a) on lots greater than 2,500m ; thereby achieves O7.
and property subject to bushfire risk; i) in locations of lowest hazard within the
and lot (Figure 13.5 provides guidance); and
b) maximise the protection of people ii) to achieve setbacks from hazardous
and property during the passage of a vegetation of 1.5 times the predominant
fire front. mature canopy tree height or 10m
whichever is the greater; and
iii) 10m from any retained vegetation
strips or small areas of vegetation; and
iv) so that the elements of the
development least susceptible to fire are
sited closest to the bushfire hazard;
2
b) on lots 2,500m or less - to maximise
37
setbacks from hazardous vegetation
13.35 Water supply for fire fighting
O8 An adequate and accessible S8.1 For premises not in a water service Complies. The Noosa on Weyba
water supply is provided for fire area— each lot has an accessible dam, development would be serviced
fighting purposes. swimming pool or water tank accessible by a reticulated water supply.
by the fire brigade that contains at least
5,000 litres of water.
Northbrook Corporation Pty Ltd Version 2 11 October 2013
Bushfire Assessment Report v2.docx Commercial in Confidence Page 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 9- Amended Bushfire Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 11.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.