Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Attachment 9- Amended Bushfire Assessment Report MCU12/0208

of 77

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Noosa on Weyba
Bushfire Assessment Report




6                    Conclusions
The proposed Noosa on Weyba development would increase the number of people living and working within
an area that contains substantial reserves of bushland that present a hazard to human health and property in
the event of a bushfire. As such it is a requirement of SPP 1/03 and the Sunshine Coast Planning Scheme
that the Noosa on Weyba development make appropriate provision for bushfire hazard mitigation and
management measures.
It is the conclusion of this assessment that the Noosa on Weyba proposal, as represented in the Concept
Master Plan, makes appropriate provisions for the mitigation and management of bushfire hazards.
Specifically the proposed development makes provision for:
> the establishment of appropriate building setbacks from areas of hazardous vegetation within and
  external to the site;
> a reticulated water supply with the capacity to service the bushfire and general fire fighting requirements
  for the proposed development;
> upgrading of the external road network to provide enhanced access to the Noosa on Weyba site locality
  for the deployment of fire management personnel and equipment, and evacuation of residents if required,
  in response to a bushfire event;
> an appropriately designed internal network of formed roadways and fire maintenance trails that will
  facilitate the safe and efficient deployment of fire management personnel and equipment;
> an appropriate system of firebreaks comprised of roadways, maintenance trails and managed vegetation
  zones to separate hazardous vegetation from potential building sites; and
> ongoing maintenance and management of on-site vegetation, property and fire management
  infrastructure by the Noosa on Weyba Body Corporate.
Notwithstanding the above, it will be necessary for relevant consideration to be given to bushfire hazard and
management issues during the further development of each stage of the Noosa on Weyba project.
Appropriate building standards, as specified in AS3959-2009 Construction of buildings in bushfire prone
areas, will also need to be enforced.




Northbrook Corporation Pty Ltd                   Version 2                                     11 October 2013
Bushfire Assessment Report v2.docx         Commercial in Confidence                                   Page 23

Used in these records

About this file

File size
11.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 9- Amended Bushfire Assessment Report MCU12_0208.pdf · 11.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.