Council archive · source document
Attachment 9- Amended Bushfire Assessment Report MCU12/0208
Very large file (11.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Noosa on Weyba Bushfire Assessment Report 6 Conclusions The proposed Noosa on Weyba development would increase the number of people living and working within an area that contains substantial reserves of bushland that present a hazard to human health and property in the event of a bushfire. As such it is a requirement of SPP 1/03 and the Sunshine Coast Planning Scheme that the Noosa on Weyba development make appropriate provision for bushfire hazard mitigation and management measures. It is the conclusion of this assessment that the Noosa on Weyba proposal, as represented in the Concept Master Plan, makes appropriate provisions for the mitigation and management of bushfire hazards. Specifically the proposed development makes provision for: > the establishment of appropriate building setbacks from areas of hazardous vegetation within and external to the site; > a reticulated water supply with the capacity to service the bushfire and general fire fighting requirements for the proposed development; > upgrading of the external road network to provide enhanced access to the Noosa on Weyba site locality for the deployment of fire management personnel and equipment, and evacuation of residents if required, in response to a bushfire event; > an appropriately designed internal network of formed roadways and fire maintenance trails that will facilitate the safe and efficient deployment of fire management personnel and equipment; > an appropriate system of firebreaks comprised of roadways, maintenance trails and managed vegetation zones to separate hazardous vegetation from potential building sites; and > ongoing maintenance and management of on-site vegetation, property and fire management infrastructure by the Noosa on Weyba Body Corporate. Notwithstanding the above, it will be necessary for relevant consideration to be given to bushfire hazard and management issues during the further development of each stage of the Noosa on Weyba project. Appropriate building standards, as specified in AS3959-2009 Construction of buildings in bushfire prone areas, will also need to be enforced. Northbrook Corporation Pty Ltd Version 2 11 October 2013 Bushfire Assessment Report v2.docx Commercial in Confidence Page 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 9- Amended Bushfire Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 11.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.