s86 Extension Request - 178 Eumundi Noosa Rd, Noosaville
Our ref: PR102995.10 Level 4, HQ South
520 Wickham Street
Council ref: REC14/0005.02 & REC14/0005.03
Fortitude Valley QLD 4006
T +61 7 3539 9500
Date: 18 June 2024
Attn: Development Services
Noosa Council
PO Box 141
Tewantin QLD 4565
Via: Email ([email protected])
Dear Council,
Bunnings Noosaville: 178 Eumundi Noosa Road, Noosaville QLD 4566
Extension application for a development approval (pursuant to section 86 of the Planning Act 2016)
Your Ref: REC14/0005 (REC14/0005.01 / REC14/0005.02 / REC14/0005.03)
We act for Bunnings Properties Pty Ltd regarding an existing development approval issued by Noosa Council
(Council Ref: REC14/0005.01) over the land situated at 178 Eumundi Noosa Road, Noosaville (Lot 101 on
SP279285 [formerly Lot 101 SP241371]).
The development approval is for:
Development Permit to Reconfigure a Lot (1 Lot into 2 Lots)
On behalf of Bunnings Properties Pty Ltd, we lodge this application for a 5-year extension to the currency
period of the approval, seeking a new currency period end date of 25 September 2029.
Background
The development approval was originally issued by Council by way of Negotiated Decision Notice on 25
September 2014. Since the initial approval, several extensions to the currency period have been granted by
Council and via the COVID-19 Applicable Event. Extensions afforded to the approval as summarised as
follows:
Approval Date Approved Details Currency Period Increase Currency Expiry
25 September ROL – 1 lot into 2 –
REC14/0005 48 months 25 September 2018
2014 Original Approval
Extension to Currency
REC14/0005.01 3 October 2018 24 months 25 September 2020
Period
Minor Change to an
Existing Approval; & 30 months
REC14/0005.02
3 November 2020 (including 1st ministerial
REC14/0005.03 Extension to Currency 25 March 2023
extension of 6 months)
Period
1st Ministerial currency period extension – July 2020 Included in extension above
2nd Ministerial currency period extension – September 2021 6 months 25 September 2023
3rd Ministerial currency period extension – April 2022 12 months 25 September 2024
Therefore, the current end date for the approval is 25 September 2024.
RPS Australia East Pty Ltd. Registered in Australia No. 44 140 292 762
rpsgroup.com Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 3 pages
Page 2
Justification
The Development Approval was originally issued for the purpose of creating the following lots:
Lot Area Purpose
Lot 101 (Bunnings site) 22,590m2 Bunning Warehouse Site
Lot 103 (Northern lot) 4,073m2 Trade Supplies Store
(MCU22/0051)
During the currency of this reconfiguring a lot (ROL) approval, Bunnings have obtained approval for a Material
Change of Use (MCU) for a Hardware and trade supplies (MCU22/0051), to be located on approved lot 103
identified within Figure 1 below. This MCU approval was initially issued on 2 November 2023 and was subject
to representations which were not resolved until 21 May 2024.
Enacting the ROL has been on hold pending the outcome of this MCU application. Now that the MCU approval
is in place, this extension is sought in order to provide time for the ROL to be enacted.
This extension to the currency period is sought to allow time to obtain necessary operational works approvals
and undertake the works necessary to enact the ROL. The 5-year extension is also sought to align the ROL
approval with the MCU approval recently obtained over the site, which remains current until 26 October 2029,
one month after the requested currency date for this ROL approval.
Figure 1 ROL Approval Plan Figure 2 2020 Aerial of Subject Site
At the time the application was originally made in April 2014 the planning scheme in force was The Noosa Plan
2006 (superseded planning scheme), under which the subject site was wholly included within the Industry
Zone. The Noosa Plan 2006 was superseded by the current Noosa Plan 2020 (current planning scheme),
which was endorsed by Noosa Council on 16 July 2020 and came into effect on 31 July 2020.
RPS Australia East Pty Ltd. Registered in Australia No. 44 140 292 762
rpsgroup.com Page 2
Page 3
Despite a new planning scheme coming into effect, the zoning for the site is has not significantly changed, with
the land still Included within an industrial zoning (medium impact industry) and the overall intent of this zone
being generally consistent with the planning intent for the site at the time of the original approval.
The key development parameters for the site under the Noosa Plan 2020 are largely reflective of the
requirements of the superseded Noosa Plan 2006. As such the approved subdivision plan is generally
compliant with the performance outcomes and acceptable outcomes of the Reconfiguring a Lot Code under
both planning schemes, including the minimum lot areas, minimum dimensions, and lot layout.
Planning Scheme Zone Minimum Lot Size Min Width / REC14/0005
Dimension Compliance
Noosa Plan 2006 Industry Zone 1,000m2 20m
Noosa Plan 2020 Medium Impact 1,000m2 20m
Industry
The northern portion of the site (Proposed Lot 103) is not affected by Biodiversity, Waterways and Wetlands
Overlay under the Noosa Plan 2020 and site vegetation clearing has been addressed as part of the MCU
approval over the site.
In addition to the above we note that a pre-lodgement meeting was previously held with Council to discuss the
Bunnings site (Council ref: PLM20/0019). As part of the pre-lodgement meeting Council confirmed that “the
minimum lot size and intent of the new scheme is similar to the superseded planning scheme and no significant
concerns are raised”.
Planning Schemes typically have lifespans of at least 10 years, and thus we do not envisage the strategic
intent of the land substantially changing prior to 2030.
Supporting Information
In support of this application, please find attached the following information required under Section 86 of the
Act:
Attachment A: Noosa Application Form for Extension to Currency Period (Planning Act 2016)
Attachment B: Written consent of the owner of the premises (Bunnings Properties Pty Ltd)
Attachment C: Original Negotiated Decision Notice for REC14/0005
Attachment D: QLD Extension application form under section 86 of the Planning Act 2016
Attachment E: Previous Currency Period Extension Approval, dated 5 October 2018
Attachment F: Previous Currency Period Extension Approval, dated 3 November 2020
Application fee
In accordance with Council’s current fee schedule, the relevant application fee of $2,174.00 will be paid upon
receipt of Councils invoice. This figure represents Council’s fee for an Extension to Currency Period application
for a ‘minor matter’ (i.e. not a ‘substantial matter’ or ‘major matter’).
We look forward to continuing working with you on this development. In the meantime, if you have any
queries please contact the writer (contact details below) or Stephen Mason on 0407 968 115.
RPS Australia East Pty Ltd. Registered in Australia No. 44 140 292 762
rpsgroup.com Page 3
Page 4
Yours sincerely,
for RPS Australia East Pty Ltd
Stewart Owen
Senior Planner
[email protected]
+61 7 3539 9534
cc: Jason Eden – Bunnings Properties Pty Ltd
Stephen Mason – RPS AAP Consulting Pty Ltd
RPS Australia East Pty Ltd. Registered in Australia No. 44 140 292 762
rpsgroup.com Page 4