Council archive · source document
Development Application - Part 1 - Cover Letter - IDAS Form 1 (plus 2 x Form 1 page 2) and 6 Checklist 4 · OPW11/0098
I (^^L4- F 140
Place barcode here SCRC CORRESPONDENCE
THIS IS THE NEXT PART OF A S00 4 7750
MULTIPLE PART RECORD
C\Documents and Seningsteje DesktopNulti Part Record Cover Sheet NEXT PART )3).doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 42 pages
Page 2
TGM Group Ballarat Melbourne I Geelong I Ballina
1315 Sturt Street
Ballarat Vic 3350 pEi^
PO Box 563W
Ballarat West Vic 3350
T 03 5330 8888
TGM
F 03 5333 3815
;, 'hl I I 175 ri;r; ,I'1
Our Reference: 4400-02
17th March 2011
Attention: Mr. Mark Lewis
Senior Engineering Officer
Sunshine Coast Regional Council
Locked Bag 72
Sunshine Coast Mail Centre
Queensland 4560
Mark. Lewis(a)-sunshinecoast.gld.. ov.au
Dear Mark
RE: Proposed Bunnings Warehouse -
AREA A Filling & Drainage Works
External Pavement & Landscaping Works
- 178 Eumundi Road, Noosaville Queensland 4566
Accompanying the formal Operation Works application documents for Area A
(immediately North of the Bunnings Warehouse site) and the external pavement and
drainage infrastructure works are payments of the Regulatory Fees for each of the
applications.
We advise that significant fees for the development have already been paid
($15,840.00) in accordance with Application No. OPW1 1/0023 for the internal works of
the Bunnings Warehouse. Unlike the Bunnings Warehouse development site both these
projects do not involve a 'change of use and the attached fees are based on the area of
works associated with each of the applications;
• Area A works - 4,080m2 Fee $3,878.00
• External pavement & landscape works - 18,110m2 Fee $7,920.00
We trust that the fee payments outlined above and attached to the applications are a
correct interpretation of the intent of Council Regulatory Fees & Charges policy.
We trust this meets with your approval and look forward to continuing to work together
with you on this project. If you have any queries or wish to further discuss the proposal
please don't hesitate to contact me on (03) 5330 8888 or 0408 031421.
Yours faithfully
TGM GROUP PTY LTD
Ballarat Office
Per:
r of), MI
www.tgmgroup.com
Page 3
Ar e a A
ENE Integrated Development Assessment System form
Application details-IDAS form i
(Sustainable PlanningAct 2008 version i.o effective 18 December 2009)
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all necessary
information and documentation will result in your application not being a properly made application.
For all development applications, you must:
• complete this form (Application details-IDASform i)
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable Planning Act200Ror the Sustainable Planning
Regulation 2009.
This form can also be completed online using Smart eDA at www.smarteda.qld.gov.au
Applicant details (note: the applicant is the person responsible for making the application and need not be the owner of
the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is correct. Any
development permit or preliminary approval that may be issued as a consequence of this application will be issued to the
applicant.)
Name/s (individual or company name in full) TGM G ro g P^ L+
For companies, contact name DarreiA I t-i4
_k j
Postal address f o B O )c S 63 Ltl
gall a 'u4
Contact phone number 03 5350 'Mg
Mobile number (non-mandatory)
Fax number (non-mandatory) o3 5333185
e-mail address (non-mandatory)
Page 4
i. What is the nature of development proposed? (tick all applicable box/es)
material change of use of premises
building work
vi operational work
reconfiguring a lot
2. What type of approval is being sought?
development permit preliminary approval both-provide details below
q q q
F ;4) of ihoJ4I 40 Coa..,.v. etce Lnl o: ks
3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?
I
Yes-complete table A and then go to question 5
q
Table A-name of each local government area in which the mobile and temporary ERA is proposed to operate
4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)
Table B-street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises
street address/lot on the plan
q street address/lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon)
Street address Lot on plan description Local government area
(e.g. Logan, Cairns)
Unit Street Street name and official suburb/ Post- Lot no. Plan type
no. no. locality name code and plan no.
64ewa p^^,,ey
Noosa
/DAS form 1
Version i. o i8 December 2009
Page 5
Table C-premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g. channel
dredging in Moreton Bay)
Coordinates Zone Datum Local government
(note: place each set of coordinates in a separate row) reference area (if applicable)
Easting Northing Latitude Longitude
GDA94
WGS84
other
5. Total area of the premises on which the development is proposed (indicate hectares or m2)
©'4•I R O
6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)
v a c a,& ' L uv
7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)
Pl a ce col cii at4a Cro5;o.A p t44,k c-q 4 64' .
8. Is owner's consent required for this application? (refer to notes at the end of this form for more information)
No
Yes-complete either table D, table E or table F as applicable
Table D
Name of owner/s of the land
I/We, the above-mentioned owner/s of the land, consent to the making of this application.
Signature of owner/s of the land
Date
/DAIS form r
Version i. o r8 December 2009
Page 6
Table E
Name of owner/s of the land
q The owner's written consent is attached or will be provided separately to the assessment manager
Table F
Name of owner/s of the land
q By making this application, I, the applicant, declare that the owner has given written consent to the making of the
application.
9. Does the application Involve a state resource? (e.g. the application involves state land, or taking quarry materials.
Refer to the notes at the end of this form for more information)
o' No q
Yes-complete table G
Table G-state owned resources (provide details for each state resource in a separate table)
Nature of state-owned resource
Nature of evidence required (tick the
applicable box and attach a copy of the Evidence of an allocation of, or an entitlement to, the resource
q
evidence to this form)
Evidence the chief executive of the department administering the
q
resource is satisfied the development is consistent with an allocation
of, or an entitlement to, the resource
q Evidence the chief executive of the department administering the
resource is satisfied the development application may proceed in the
absence of an allocation of, or an entitlement to, the resource
io. Identify if any of the following apply to the premises (tick applicable box/es)
adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)-complete table H
q
q on strategic port land under the Transport Infrastructure Act 1994-complete table I
q in a tidal water area-complete table 1
Table H Name of water body, watercourse or aquifer
Applicar;, •r.,,/s-1DA5form r
Version r. o r8 December 2009
Page 7
Table I I Lot on plan description for strategic port land I Port authority for the lot
Table J Name of local government for the tidal area (if applicable) Port authority for the tidal area (if applicable)
ii. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water, etc.)
d No
I Yes-ensure the type, location and dimension of each easement is included in the plans submitted
12. Does the proposal include new building work or operational work on the premises? (including any services)
Z Yes-ensure the nature, location and dimension of proposed works are included in plans submitted
El No
13. Is the payment of a portable long service leave levy applicable to this application? (refer to notes at the end of this
form for more information)
El No-go to question 15 q Yes
14. Has the portable long service leave levy been paid? (refer to notes at the end of this form for more information)
No
q Yes-complete table K and submit with this application the yellow local government/ private certifier's copy of the
receipted QLeave form
Table K Amount paid Date paid QLeave Project Number (6 digit number starting with A, B,
E,LorP)
15. Has the local government agreed to apply a superseded planning scheme to this application under section 96 of
the Sustainable PlanningAct 2009?
d No
0 Yes-please provide details below
Name of local government Date of written notice given Reference number of written notice given
by local government by local government (if applicable)
-IDAS form i
version r. o r8 December 2009
Page 8
16. List below all of the forms and supporting information that accompany this application (include all IDAS forms,
checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this question
does not apply for applications made on-line using Smart eDA)
Description of attachment or title of attachment Method of lodgement to
assessment manager
C F proposed Fil). +v A , ea A 4a'J Co
17. Applicant's declaration
By making this application, I declare that all information in this application is true and correct (note: it is unlawful to
provide false or misleading information).
Notes for completing this form
Question 8:
• Section 263 of the Sustainable PianningAct2009 sets out when the consent of the owner of the land is required for an
application. Section 26o(1)(e) of the Sustainable PlanningAct200g provides that if the owner's consent is required
under section 263, then an application must contain, or be accompanied by, the written consent of the owner, or
include a declaration by the applicant that the owner has given written consent to the making of the application.
• Owner's consent is not required for a mobile and temporary ERA.
Question 9:
• Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation. Schedule
14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is required to be
given, and the evidence required, to support the application.
Question 13:
• The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long
service leave levy is payable.
• The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy are
prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
Question 14:
• The portable long service leave levy need not be paid when the application is made, but the Building and Construction
Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development permit is issued.
• Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or
agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qld.gov.au. For further
information contact QLeave on 18oo 803 481 or www.gleave.qld.gov.au.
iDAS form i
Version i. o r8 December 2009
Page 9
Privacy-the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a purpose
outside of the IDAS process, except where required by legislation (including the Right to lnforrnationAct 2008) or as required
by Parliament. This information may be stored in a departmental database. The information collected will be retained as
required by the Public RecordsAct 2002.
OFFICE USE ONLY
Date received 2 4 MAR 20 Reference numbers
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
To Council. I have been engaged as the private certifier for the building work referred
to in this application
Building
Date of engagement Name BSA Certification license number
classification/s
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Date receipted
QLeave Project Amount paid form sighted by Name of officer who
Description of the work Date paid
Number ($) assessment sighted the form
manager
The Sustainable PlanningAct 2009(SPA) is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.
App iicvti on , rrr.; -iDAS form i
Version i. o 18 December 2008
Page 10
gu^^^^►SS POd54d; ale
EXies-L4a( I,JDr k
i. What is the nature of development proposed? (tick all applicable box/es)
I
material change of use of premises
q
building work
operational work
reconfiguring a lot
2. What type of approval is being sought?
development permit preliminary approval q both-provide details below
q q
peel-oil o"J WO k
3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?
No
Yes-complete table A and then go to question 5
Table A-name of each local government area in which the mobile and temporary ERA is proposed to operate
4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)
Table B-street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises
street address/lot on the plan
q street address/lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon)
Street address Lot on plan description Local government area
(e.g. Logan, Cairns)
Unit Street Street name and official suburb/ Post- Lot no. Plan type
no. locality name code and plan no.
S SP2i1687 I J.JocSa
4^:nilC?4'J•. J- ',-IDASformr
Version r. o 18 December 2009
Page 11
i. What Is the nature of development proposed? (tick all applicable box/es)
0 material change of use of premises
Y
Ubuilding work
operational work
L1 reconfiguring a lot
2. What type of approval is being sought?
z development permit preliminary approval F] both-provide details below
t LA al 61 pro ua! 40 (owe v iev ► Ce works
g. Is the application for a mobile and temporary environmentally relevant activity (ERA)?
4 No
Yes-complete table A and then go to question 5
Table A-name of each local government area in which the mobile and temporary ERA is proposed to operate
4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)
Table B-street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises
street address/lot on the plan
street address/lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon)
Street address Lot on plan description Local government area
(e.g. Logan, Cairns)
Unit Street Street name and official suburb/ Post- Lot no. Plan type
no. no. locality name code and plan no.
iners e4,ot., o
Euw, u.ij,_ Nooses NOOSO
0 0l Gofe wa) Dvei
Noosav ', He
2 IDA5 form i
Version i. o r8 December 2009
Page 12
0 0 0 Integrated Development Assessment System form
Building or operational work assessable against
a planning scheme-IDAS form 6
(SustainablePlanningAct2009 version 1.o effective 18 December 2009)
This form must be completed for development applications for building works or operational work assessable against a
planning scheme.
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all necessary
information and documentation will result in your application not being a properly made application.
For all development applications, you must:
• complete Application details-IDAS form i
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable PlanningAct2oo9or the Sustainable Planning
Regulation 2009.
This form can also be used for development on strategic port land under the Transport Infrastructure Act 1.9.94.
This form can also be completed online using Smart eDA at www.smarteda.qld.gov.au
i. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)
building work-complete table A operational work-complete table B
q
Table A
What is the nature of the building work made assessable in the planning scheme (e.g. building, repairing, altering,
underpinning, moving or demolishing a building)?
What type of approval is being sought? (if you have indicated multiple works in the above question, please use an
attachment to this form to detail each approval request)
development permit F preliminary approval
q
Are there any current approvals associated with this application? (e.g. material change of use)
List of approval reference/s Date approved Date approval lapses
Department of Infrastructure and Planning Qplan FIT-41P FTT
i,
Page 13
Table B
What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)
road works stormwater water infrastructure
q
drainage works y earthworks q sewerage infrastructure
landscaping
LI
other-provide details Area A
What type of approval is being sought? (if you have indicated multiple works in the above question, please use an
attachment to this form to detail each approval request)
q development permit q preliminary approval q both-specify below
Opera .o. ► 4I approvctf
Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
No Yes-specify the number of lots being created
q q
Are there any current approvals associated with this application? (e.g. material change of use)
No Yes-provide details below
q q
List of approval reference/s Date approved Date approval lapses
Dz C^s;o^ Zoo7 /2SC Ic Sul Zcx_'5
2. What is the dollar value of the proposed building work? (inc GST, materials and labour)
3. Confirm that the following mandatory supporting information accompanies this application
Confirmation of Method of
lodgement lodgement
All applications for operational works
site plans drawn to scale which show the following: confirmed
• the location and site area of the land to which the application relates
(relevant land)
• the north point
• the boundaries of the relevant land
• the allotment layout showing existing lots, any proposed lots (including the
dimensions of those lots), existing or proposed road reserves, building
envelopes and existing or proposed open space (note: numbering is required
for all lots)
0 ,1'j d;,:,- -P 9 7 x 3_ ;, ;f y,,, t _ IDASfO/m6
Version 1.018 December 2009
Page 14
• any existing or proposed easements on the relevant land and their function
• any access limitation strips
• all existing and proposed roads and access points on the relevant land
a statement about how the proposed development addresses the local confirmed
government's planning schemes and any other planning documents relevant to
the application
Applications for operational works involving earthworks (filling and excavating)
drawings showing: confirmed
• existing and proposed contours
• areas to be cut and filled
• the location and level of any permanent survey marks or reference stations
used as datum for the works
• the location of any proposed retaining walls on the relevant land and their
height
• the defined flood level (if applicable)
• the defined fill level (if applicable)
Applications for operational works involving roadworks
drawings showing: confirmed
• existing and proposed contours
• the centreline or construction line showing chainages, bearings, offsets if the
construction line is not the centreline of the road and all intersection points
• information for each curve including tangent point chainages and offsets,
curve radii, arc length, tangent length, superelevation (if applicable) and
curve widening (if applicable)
• kerb lines including kerb radii (where not parallel to centreline) and tangent
point changes (where not parallel to centreline)
• edge of pavement where kerb is not constructed
• position and extent of channelisation
• location and details of all traffic signs, guideposts, guardrail and other street
furniture
• pavement markings including details on raised pavement markers
• catchpit, manhole and pipeline locations
• drainage details (if applicable)
• cross road drainage culverts (if applicable)
• concrete footpaths and cycle paths
• location and details for access points, ramps and invert crossings
• changes in surfacing material
-,P-IDA5 form 6
Version i. o i8 December 20OR
Page 15
Applications for operational works involving stormwater drainage
drawings showing: confirmed
• existing and proposed contours
• drainage locations, diameters and class of pipe, open drains and easements
• manhole location, chainage and offset or co-ordinates and inlet and outlet
invert levels
• inlet pit locations, chainage and offset or co-ordinates and invert and kerb
levels
Applications for operational works involving water reticulation
drawings showing: Elconfirmed
• kerb lines or edge of pavement where kerb is not constructed
• location and levels of other utility services where affected by water
reticulation works
• pipe diameter, type of pipe and pipe alignment
• water main alignments
• water supply pump station details (if applicable)
• minor reservoir details (if applicable)
• conduits
• location of valves and fire hydrants
• location of house connections (if applicable)
• location of bench marks and reference pegs
Applications for operational works involving sewerage reticulation
drawings showing:
q confirmed
• location of all existing and proposed services
• location of all existing and proposed sewer lines and manhole locations
• location of all house connection branches
• kerb lines or edge of pavement where kerb is not constructed
• chainages
• design sewer invert levels
• design top of manhole levels
• type of manhole and manhole cover
• pipe diameter, type of pipe and pipe alignment
• location of house connections (if applicable)
• sewer pump station details (if applicable)
Applications for operational works involving street lighting
drawings showing:
confirmed t I'
• location of all light poles and service conduits
• location of all other cross road conduits
• type of wattage and lighting
• any traffic calming devices
• additional plans for roundabouts and major roads (if applicable)
• details of any variations to normal alignment
• details of lighting levels
/OAS form 6
Version i.o 18 December 200g
Page 16
Applications for operational works involving public utility services
drawings showing:
131confirmed
• any existing light poles and power poles
• any existing underground services
• details of proposed services
• alternation to existing services
Applications for operational works involving landscaping works
drawings showing:
confirmed
• the location of proposed plant species
• a plant schedule indicating common and botanical names, pot sizes and
numbers of plants
• planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and garden
edge
• the location and type of any existing trees to be retained
• construction details of planter boxes, retaining walls and fences
• the proposed maintenance period
• irrigation system details
Notes for completing this form:
• This form can also be used for development applications for building works or operational works assessable against
the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is mentioned, take it to
mean the land use plan for the airport land.
Privacy-please refer to your assessment manager for further details on the use of information recorded in this
form.
OFFICE USE ONLY
Date received Reference numbers
The SustainablePlanningAct2009is administered by the Department of Infrastructure and Planning. This form and all other
required application materials should be sent to your assessment manager and any referral agencies.
FrrN!'ji7Jl '0e :7Jd id' I"`( 7tijG' (;( a Y.!?S.'<: ^^annrn^ _. -iDAS form 6
Version i. o 18 December 2009
Page 17
A re cl A
• • • Integrated Development Assessment System checklist
Operational work-IDAS checklist 4
(Sustainable PlanningAct 2009. version i.o 18 December 2009)
This checklist only applies when the development application seeks approval for operational works.
You should complete all questions unless the checklist indicates otherwise.
All planning and development applications require applicants to complete the following:
• Applicant details-/DAS form i
• any forms or mandatory supporting information identified as forming part of your application.
If you are unsure of any answers to questions, phone or visit your local government, or go to the Department of
Infrastructure and Planning's website, www.dip.qld.gov.au.
The checklist and relevant sections do not need to be completed for applications relating only to building work requiring
assessment against the BuildingAct 1975.
This checklist can also be completed online using Smart eDA at www.smarteda.qld.gov.au
Part i-General questions
1.i Is the proposed operational work assessable under the planning scheme?
No
Yes • You must complete Building or operational work assessable against a planning scheme-/DASform 6
• Continue on to question 1.3
1.2 Is the proposed operational work assessable under any state planning regulatory provisions?
No • Go to question i.9
Yes • Go to question i.4
1.3. Is any part of the premises located in part of a future state-controlled road or within ioo metres of a state-
controlled road?
No • It is recommended that you complete part 2 (starting from question 2.1) of this checklist
yes • It is recommended that you complete part 2 (starting from question 2.2) of this checklist
-9-
Department of Infrastructure and Planning
Page 18
'ir
i.4 Does State Planning Policy 2/02: Planning and Managing Development Involving Acid Sulfate Soils apply to the
development?
No
Yes • It is recommended that you complete part 3 of this checklist
1.5 Is there any proposed operational work for filling or excavation?
No • It is recommended that you complete part 4 (starting from question 4.5) of this checklist
q
• It is recommended that you complete part 4 (starting from question 4.1) of this checklist
ff-yes
i.6 Is any of the proposed operational work listed in schedule 12 of the Sustainable Planning Regulation 2009 and
does it exceed the specified threshold?
No
Yes • This application requires assessment by the Department of Transport and Main Roads as a concurrence
q
agency
Section reference:
• Sustainable Planning Regulation 2009, schedule 7, table 3, item 14
1.7 Is any of the proposed operational work listed in schedule 13 of the Sustainable Planning Regulation 2009 and
does it exceed the specified threshold?
No
Yes • This application requires assessment by the Department of Transport and Main Roads as a concurrence
q
agency
Section reference:
• Sustainable Planning Regulation 2009, schedule 7, table 3, item 15
i.8 Is any part of the premises in an interim koala habitat protection area identified under the South East
Queensland Koala state planning regulatory provisions (SEQ Koala SPRP)?
El Yes It is recommended that you complete part 5 of this checklist
Opera riona! work C! Pckl% r-IDAS checklist4
Version i. o 18 December 2009
Page 19
1.9 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also
assessable?
No
q
Yes • It is recommended that you complete of part 6 of this checklist
i.io Does the Vegetation ManagementAct 1999 apply to any of the proposed operational work for the clearing of native
vegetation?
No
R Yes • It is recommended that you complete part 7 of this checklist
1.11 Is any of the proposed operational work for any thing constructed or installed that allows, under the WaterAct2000,
for taking or interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and
other than under the WaterAct2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
No • It is recommended that you complete part 8 (starting from question 8.9) of this checklist
EJ Yes • it is recommended that you complete part 8 (starting from question 8.1) of this checklist
1.12 Is any of the proposed operational work tidal work, other than excluded work defined under the Sustainable
Planning Regulation 2009?
q Yes • It is recommended that you complete part 9 of this checklist
1.13 Is any of the operational work proposed to be carried out within a coastal management district
No
q
Yes • It is recommended that you complete part io of this checklist
1.14 Is any of the proposed operational work for constructing or raising waterway barrier works under the fisheries
Act 1994?
LI Yes • It is recommended that you complete part ii of this checklist
-z K,,r-/DASchecklist 4
Version 1. o 18 December 2009
Page 20
1.15 Is any of the proposed operational work to be carried out completely or partly within a declared fish habitat area
under the Fisheries Act 1994?
E]Yes I • It is recommended that you complete part 12 of this checklist
1.16 Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries
Act 1994?
Yes • It is recommended that you complete part 13 of this checklist
q
1.17 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild Rivers Act
2005?
El Yes . It is recommended that you complete part 14 of this checklist
1.18 Is any part of the premises located in part of a future state-controlled road or within ioo metres of a state-
controlled road?
• It is recommended that you complete part 15 of this checklist
Part 2-State-controlled roads
2.1 Is the proposed operational work for filling or excavating listed in the Sustainable Planning Regulation 200.9
schedule ii and does it exceed the threshold or combined threshold?
No • End of part 2 of this checklist
I Yes • This application requires assessment by the Department of Transport and Main Roads as concurrence
q
agency
• End of part 2 of this checklist
-,, ,: n r, ; ua --/OAS checklist 4
Version 1.018 December 2009
Page 21
2.2 Is any of the proposed operational work associated with access to a state-controlled road?
Yes • This application requires assessment by the Department of Transport and Main Roads as concurrence
q
agency
2.3 Is any of the proposed operational work for filling or excavation?
No
Yes • This application requires assessment by the Department of Transport and Main Roads as concurrence
agency
2.4 Does any of the proposed operational work involve the redirection or intensification of site stormwater from the
land through a pipe with a cross-sectional area greater than 625 square centimetres that directs stormwater to a
state-controlled road?
• This application requires assessment by the Department of Transport and Main Roads as concurrence
agency
Section reference:
• Sustainable P/anningRegulation200R, schedule 7, table 3, item i(b) and 2
Part 3-Acid sulfate soils
3.1 Is the natural ground level of any point where work is being carried out less than 20 metres Australian Height
Datum (AHD)?
No • End of part 3 of this checklist
Yes
q
3.2 Does the proposed operational work involve the following?
excavating more than iooo cubic metres of soil or sediment at or below five Yes No
q
metres AHD
using more than iooo cubic metres or more of material with an average Yes q No
depth of 0.5 metres on land, soil or sediment at or below five metres AHD
• If yes to any of the above, then this application requires assessment by the Department of Environment and
Resource Management as an advice agency
work che^. k Vii 'r -/DAS checklist 4
Version i. o 18 December 2009
Page 22
Section reference:
• Sustainable Planning Regulation 2009, schedule 7, table 3, item 3
• State planning policy 2/02: Planning and managing development involving acid sulfate soils, section 3.6
Part 4-Easements and substations
4.1 Is the filling or excavation associated with reconfiguring a lot?
No
Yes Go to question 4.5
q
4.2 Is any part of the premises subject to an easement in favour of a distribution entity or transmission entity under
the Electricity Act 1994 ?
No • Go to question 4.5
Yes
4.3 Is any of the proposed operational work to be located wholly or partly in the easement?
No
LI Yes • This application requires assessment by the entity responsible for the easement as an advice agency
4.4 Is any of the operational work to be located wholly or partly within io metres of a substation site under the
Electricity Act 1994 ?
No
Yes • This application requires assessment by the entity responsible for the substation as an advice agency
4.5 Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number i issued
under the Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline?
No • End of part 4 of this checklist
0 Yes • This application requires assessment by the pipeline licence holders as an advice agency
4.6 Is any of the proposed operational work for filling, excavation, compaction, drilling, boring or piping and not
associated with reconfiguring a lot?
No • End of part 4 of this checklist
LI Yes • This application requires assessment by the pipeline licence holder as an advice agency
JDAS checklist4
Version 1. o 18 December 2009
Page 23
4.7 Is any of the operational work proposed to be located wholly or partly in the easement?
No
Yes • This application requires assessment by the pipeline licence holder as an advice agency
q
Section reference:
• Sustainable PlanningRegulation 2009, schedule 7, table 3, item 9(a), 9(b) and 17
Part 5-Koala conservation
5.i Do any of the exceptions stated in section i.4 of the SEQ Koala SPRP apply?
• End of part 5 of this checklist
Yes
5.2 Will the activity result in the following?
clearing of native vegetation over an area greater than 2500 square metres
q Yes No
excavation or filling of an area greater than 5000 square metres Yes No
loss of mature koala habitat trees.
q Yes q No
an increased number of lots
q Yes q No
• If yes to any of the above, then this application requires assessment by the Department of Environment and
Resource Management as a concurrence agency
Section reference:
• Sustainable Planning Regulation 2009, schedule 7, table 2, item 38
• Sustainable PlanningRegulation 2009, schedule 7, table 3, item 36
• South East Queensland Koala State planning regulatory provisions
Part 6-Reconfiguring a lot
6.1 Is any part of the premises in a wild river area declared under the Wild Rivers Act 2005?
No • You must complete Building or Operational work assessable against a planning scheme-/DAS form 6
• End of part 6 of this checklist
Yes
(ke1a',,;oo,J N's t-/DAS checklist 4
Version z. o i8 December 2009
Page 24
6.2 Is the proposed operational work for residential, commercial or industrial purposes outside a designated urban
area, as defined by the Wild Rivers Act 2005?
• You must complete Building or Operational work assessable against a planning scheme-/DASform 6
• This application must be assessed by the relevant local government if the premises are completely or
partly within a single local government area
Yes • You must complete Building or Operational work assessable against a planning scheme-/DAS form 6
q
• This application must be assessed by the relevant local government
Section reference:
• Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 2
• Sustainable Planning Regulation 2009, schedule 3, parti, table 4, item 9
• Wild Rivers Code (Note: the code does not currently contain applicable provisions for residential, industrial or
commercial development inside a designated urban area)
Part 7-Vegetation clearing
7.1 Is the proposed clearing assessable (i.e. not an exception) under schedule 3, part 1, table 4 item i of the
Sustainable Planning Act 2009?
• End of part 7 of this checklist
Yes
q
7.2 Is the proposed vegetation clearing a relevant purpose under the Vegetation Management Act 1999, section 22A
for one or more of the following?
a project declared to be a significant project under the State Development Yes No
q
and Public Works Organisation Act 1971, section 26
necessary to control non-native plants or declared pest
q Yes No
to ensure public safety Yes No
for establishing a necessary fence, firebreak, road or vehicle track, or for
q Yes q No
constructing necessary built infrastructure, if there is no suitable alternative
site for the fence, firebreak, road, track or infrastructure
a natural and ordinary consequence of other assessable development for Yes No
q
which a development approval as defined under the Planning Act was given,
or a development application as defined under the Planning Act was made,
before 16 May 2003
for fodder harvesting
q Yes q No
for thinning Yes No
for clearing of encroachment Yes No
>v-irk checklisr-/DASc/hecklsty
Version 1.018 December 2009
Page 25
uuu
for an extractive industry Yes No
q
for clearing regrowth on leases issued under the LandAct 1994 for Yes No
q
agriculture or grazing purposes
for clearing regrowth on freehold land, or indigenous land, in a wild river Yes q No
high preservation area
for a special indigenous purpose under the Cape York Peninsula Heritage Yes No
q
Act 2007
• If no to all of the above, then the clearing is not a relevant purpose and this aspect of the development is
prohibited development
• End of part 7 of this checklist
7.3 Is the proposed clearing associated with a material change of use or reconfiguring a lot for which referral is
required in relation to clearing vegetation?
No
0 Yes • End of part 7 of this checklist
7.4 Is any of the proposed clearing in an area declared as an area of high nature conservation value (other than a wild
river high preservation area) or an area vulnerable to land degradation under the Vegetation ManagementAct
1999?
No • You must complete Clearing native vegetation-WAS form ii
q
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
• Go to question 7.6
Yes
7.5 Is any of the proposed clearing for fodder harvesting, extractive industry, clearing regrowth on leases for
agriculture or grazing purposes under the LandAct 1994 or a natural and ordinary consequence of other
assessable development defined under the Sustainable PlanningAct2009, or a development application as
defined under the Planning Act was made, before 16 May 2003?
• You must complete Clearing native-!DASform 11
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
q Yes • The clearing is not a relevant purpose and this aspect of the development is prohibited development
t ,-IDAS checklist 4
Version r. o x8 December 200Q
Page 26
7.6 Is any of the proposed clearing in the high preservation area of a declared wild river area?
No • You must complete Clearing native vegetation-/DASform ii
q
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
• Go to question 7.8
Yes
7.7 Is any of the proposed clearing for the following purposes?
a project declared to be a significant project under the State Development
q Yes q No
and Public Works Organisation Act 1972, section 26
for fodder harvesting, thinning or an extractive industry Yes No
for a special indigenous purpose under the Cape York Peninsula Heritage
q Yes No
Act 2007
for clearing regrowth on leases issued under the LandAct 1994 for q Yes No
agriculture or grazing purposes and in a high preservation area outside of a
registered area of agriculture as defined under the Vegetation Management
Act 1999
for clearing regrowth on freehold land or indigenous land, in a wild river Yes 1-1 No
area and in a high preservation area outside of a registered area of
agriculture as defined under the Vegetation ManagementAct 1999
• Unless the application is consistent with any approved development plan applying to the land, this aspect of
the development is prohibited
• If no to all of the above, you must complete Clearing native veffetation-10AS form ii
• This application requires assessment by the Department of Environment and Resource Management (DERM). If DERM is not
the assessment manager for the application, the role of the agency will be as a concurrence agency and you must give
DERM a copy of the application
• Subject to the declaration for the relevant wild river area, the application requires assessment for the purposes of the Wild
Rivers Act 2005
• If yes to any of the above, then the clearing is not a relevant purpose and this aspect of the development is
prohibited development
7.8 Is any of the proposed clearing in a koala conservation area or koala sustainability area, other than in an SEQ
urban footprint area?
No • End of part 7 of this checklist
q
Yes
q
_' Pcr-/DASchecklist 4
Version r. o 18 December 2009
Page 27
uuu
7.9 Is any of the proposed clearing associated with reconfiguring a lot for which a referral is required in relation to
the proposed clearing in a koala conservation area or koala sustainability area?
No
q
Yes I • End of part 7 of this checklist
q
7.10 Is any of the proposed clearing over an area greater than 2500 square metres?
No
q
F]Yes • This application requires assessment by the Department of Environment and Resource Management as a
concurrence agency
Section reference:
• Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 1
• Sustainable Planning Regulation 2009, schedule 5, part 3, table 4, item i
• Sustainable Planning Regulation 2009, schedule 7, table 2, item 5 and 37
• Vegetation ManagementAct 1999, section 22A
• Wild Rivers Act 2005, section 31F
• Wild Rivers Code
Lrt 8-Taking or interfering with water
8.1 Is any of the proposed clearing for the following purposes?
a water resource plan under the WaterAct 2000
q Yes U No
a wild river declaration under the Wild Rivers Act 2005 Yes No
a regulation under the Sustainable PlanningAct 2009 or the WaterAct 2000 Yes No
• If no to all of the above, this application requires assessment by the Department of Environment and Resource
Management (DERM). If DERM is not the assessment manager for the application, the role of the agency will be
as a concurrence agency and you must give DERM a copy of the application
8.2 Is any of the proposed operational work to be carried out in a wild river area under the Wild Rivers Act 2005?
No
q Yes • If any part of the proposal relates to operational work that interferes with water in a high preservation area
or a nominated waterway (other than for a dam or weir), then this aspect of the development is prohibited
development
• All other proposals are subject to the declaration for the relevant wild river area and assessment may be
required for the purposes of the Wild Rivers Act 2005
S. t-/DAS checklist 4
Version 1.018 December 2009
Page 28
8.3 Is the work fora water pump?
F] Yes • You must complete Watercourse pump-/DASform 13
• This application requires assessment by the Department of Environment and Resource Management as a
concurrence agency
8.4 Is the work for water storage?
No
q
Yes • You must complete Water storage-IDAS form 14
q
• This application requires assessment by the Department of Environment and Resource Management as a
concurrence agency
8.5 Is the work for gravity diversion from a watercourse?
No
Yes • You must complete Gravity diversion from a watercourse-IDA5 form 15
• This application requires assessment by the Department of Environment and Resource Management as a
concurrence agency
8.6 Is the work for a watercourse diversion?
D No
Yes • You must complete Watercourse dlvetsion-IDA5 form 17
• This application requires assessment by the Department of Environment and Resource Management as a
concurrence agency
8.7 Is the work for other work for taking or interfering with water?
No
Dyes • You must complete Other work in awatercourse-iDASform21
• This application requires assessment by the Department of Environment and Resource Management as a
concurrence agency
Cce-:? »a; wLI rk checklist-/DASchecklist 4
Version 2. o 18 December 2009
Page 29
8.8 Is any of the proposed operational work for any thing constructed or installed that allows, under the WaterAct
2000, for taking or interfering with artesian water (other than using a water truck to pump water)?
Yes • You must complete Taking artesian orsub-artesian water-/DASform 12
q
• This application requires assessment by the Department of Environment and Resource Management as a
concurrence agency
8.9 Is any of the proposed operational work for any thing constructed or installed that allows, under the WaterAct
2000, for taking overland flow water (other than using a water truck to pump water)?
No • Go to question 8.12
q Yes
8.io Are the operations mentioned as assessable development in the following?
a water resource plan under the WaterAct 2000 Yes No
a regulation under Sustainable Planning-Act 2009 or the WaterAct2000.
q Yes q No
• If yes to any of the above, you must complete Taking overland flow-WAS form ig
• This application requires assessment by the Department of Environment and Resource Management (DERM). If
DERM is not the assessment manager for the application, the role of the agency will be as a concurrence agency
and you must give DERM a copy of the application
8.11 Is any of the proposed operational work mentioned as assessable in a wild river declaration and to be carried
out in the relevant wild river area declared under the Wild Rivers Act 2005?
No
q
Yes • You must complete Taking overland flow-/DASform l9
q
• If any part of the proposal relates to operational work in a high preservation area other than works stated
in a wild river declaration for the area to be an assessable development for which a development
application may be made then this aspect of the development is prohibited development
• All other proposals are subject to the declaration for the relevant wild river area and assessment may be
required for the purposes of the Wild Rivers Act 2005
• Subject to the declaration for the relevant wild river area, assessment may also be required for the
purposes of the Wild Rivers Act 2005
,.-,p(,, Ai -/DAS checklist 4
Version i. o s8 December 20OR
Page 30
8.12 Is any of the proposed operational work for any thing constructed or installed that allows, under the WaterAct
2000, for taking or interfering with subartesian water (other than using a water truck to pump water)?
No • Go to question 8.14
Yes
8.13 Are the operations mentioned as assessable development in the following?
a water resource plan under the WaterAct2000 Yes No
a regulation under the Sustainable PlanningAct2009or the WaterAct2000 Yes No
• If yes you must complete Taking artesian orsub-artesian water-/DASform 12
This application requires assessment by the Department of Environment and Resource Management (DERM). If
DERM is not the assessment manager for the application, the role of the agency will be as a concurrence agency
and you must give DERM a copy of the application
8.14 Does any of the proposed operational work for any thing constructed or installed that allows, under the WaterAct
2000, for interfering with overland flow water (other than using a water truck to pump water)?
No • Go to question 8.19
q
Yes
8.15 Is the proposed operational work to be carried out in a floodplain management area of a wild river area
declared under the Wild Rivers Act 2005?
• Go to question 8.17
LI Yes
8.16 Is the proposed operational work related to:
specified works for the area 11 Yes No
work stated in the relevant wild river declaration to be assessable LI Yes No
development for which an application may be lodged.
• If yes to any of the above you must complete Interfering with overland flow-WAS form 20
• Subject to the declaration for the relevant wild river area, this application requires assessment by the
Department of Environment and Resource Management as concurrence agency
• If no to both of the above, then this aspect of the development is prohibited development
jti-,n,J; . hecklist-IDA5 checklist 4
Version i. o 18 December 2009
Page 31
8.17 Are the operations mentioned as assessable development in the following?
a water resource plan under the WaterAct2000
q Yes FJ No
a regulation under the Sustainable PlanningAct2o09and WaterAct2000
q Yes R No
• If yes to any of the above, you must complete Interfering with overlandflow-/DASform20
• This application requires assessment by the Department of Environment and Resource Management (DERM). If
DERM is not the assessment manager for the application, the role of the agency will be as a concurrence agency
and you must give DERM a copy of the application
8.18 Is the interfering with overland flow water proposed in an area declared under the WaterAct2000 to be a
drainage and embankment area (other than a wild river floodplain management area) and declared to be assessable
under that Act?
No
1^
Yes • In addition to this checklist, you must also complete Interfering with overtandflow-IDAS form 20
q
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
8.19 Is the proposed operational work for the following?
for the construction of a referable dam as defined under the Water Supply Yes No
(Safety and Reliability) Act 2008
to increase the storage capacity of a referable dam by more than 1o percent.
q Yes No
• If yes to any of the above you must complete Referable dam-WASform i6
• This application requires assessment by the Department of Environment and Resource Management (DERM). If
DERM is not the assessment manager for the application, the role of the agency will be as a concurrence agency
and you must give DERM a copy of the application
Section reference:
• Sustainable Planning-Regulation 2009, schedule 3, part 1, table 4, items 3 and 4
• Sustainable Planning Regulation 2009, schedule 5, part 1, table 4, items 3 and 4
• Sustainable Planning Regulation 2009, schedule 7, table 2, item 9, io and 11
• Water Act 2000, section 966A and 966B (note: no current wild river declaration identifies taking or interfering
with subartesian water as assessable)
• Wild Rivers Act 2005, section 43A
• Wild Rivers Code (note: the code does not currently contain applicable provision for taking or interfering with
artesian water)
• Relevant wild river declarations
.-/DAIS checklist 4
Version i. o r8 December 200.9
Page 32
Part 9-Tidal work
9.1 Is any of the proposed tidal work prescribed tidal work?
• Go to question 9.io
2r-NO
Yes
9.2 Is any of the proposed prescribed tidal work to be carried out in a wild river area declared under the Wild Rivers
Act 2005?
No
q
Yes • Go to question 9.6
q
9.3 Is the work proposed in a canal?
No
Yes • Go to question 9.5
9.4 Is any of the proposed tidal work for a marina with more than 6 vessel berths?
No • You must complete Prescribed tidal work-(DASform 28
q
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the rote of the agency will be as a
concurrence agency and you must give DERM a copy of the application
• This application requires assessment by the Department of Transport and Main Roads as concurrence
agency
n Yes • You must complete Prescribed tidal work-/DASform 28
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
• This application requires assessment by the Department of Transport and Main Roads as concurrence
agency
• This application requires assessment by the Department of Community Safety as advice agency
-IDAS checklist 4
Version i. o i8 December 2009
Page 33
9.5 Is any of the proposed tidal work for a marina with more than 6 vessel berths?
• You must complete Prescribed tidal work-/DASform 28
• This application requires assessment by the Department of Transport and Main Roads as concurrence
agency
Yes • You must complete Prescribed tidal work-/DASform 28
q
• This application requires assessment by the Department of Transport and Main Roads as concurrence
agency
• This application requires assessment by the Department of Community Safety as advice agency
9.6 Is all of the proposed prescribed tidal work for specified works under the Wild Rivers Act 2005?
No • This aspect of the development is prohibited development
q
Yes
9.7 Is the work proposed in a canal?
1:1 No 1
Yes • Go to question 9.9
q
9.8 Is any of the proposed tidal work for a marina with more than 6 vessel berths?
No • Unless the application is consistent with any property development plan applying to the land, then this
q
aspect of the development is prohibited development
• You must complete Prescribed tidal work-WAS form 28
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
• This application requires assessment by the Department of Transport and Main Roads as concurrence
agency for the purposes of the Wild Rivers Act 2005
Yes • Unless the application is consistent with any property development plan applying to the land, then this
q
aspect of the development is prohibited development
• You must complete Prescribed tidal work-/DASform 28
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
• This application requires assessment by the Department of Transport and Main Roads as concurrence
agency
• This application requires assessment by the Department of Community Safety as advice agency
• Subject to the relevant declaration for the wild river area, this application requires assessment by the
Department of Environment and Resource Management
,, A --1DAScheckiist4
Version r. o r8 December 200.9
Page 34
qqq
9.9 Is any of the proposed tidal work for a marina with more than 6 vessel berths?
No • Unless the application is consistent with any property development plan applying to the land, then this
aspect of the development is prohibited development
• You must complete Prescribed tidal work-IDA5 form 28
• This application requires assessment by the Department of Transport and Main Roads as a concurrence
agency for the purposes of the Wild Rivers Act 2005
• Subject to the relevant declaration for the wild river area, this application requires assessment by the
Department of Environment and Resource Management
Yes • Unless the application is consistent with any property development plan applying to the land, then this
aspect of the development is prohibited development
• You must complete Prescribed tidal work-IDAS form 28
• This application requires assessment by the Department of Transport and Main Roads as a concurrence
agency
• This application requires assessment by the Department of Community Safety as advice agency
• Subject to the relevant declaration for the wild river area, this application requires assessment by the
Department of Environment and Resource Management
9.io Is any of the proposed tidal work to be carried out in a wild river area declared under the Wild Rivers Act 20057
• Go to question 9.13
Yes
q
9.11 Is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
No • This aspect of the development is prohibited development
• Go to question 9.14
Yes
q
9.12 Is any of the proposed tidal work for a marina with more than 6 vessel berths?
• Unless the application is consistent with any property development plan applying to the land, the
assessment manager must refuse to receive it. This aspect of the development is prohibited development
• You must complete Tidal work and coastal management districts-IDA5 form 23
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
• This application requires assessment by the Department of Transport and Main Roads as a concurrence
agency
• Subject to the relevant declaration for the wild river area, this application requires assessment by the
Department of Environment and Resource Management
Prk check: r-/DAS checklist 4
Version r. o 18 December loop
Page 35
n Yes • Unless the application is consistent with any property development plan applying to the land, the
assessment manager must refuse to receive it. This aspect of the development is prohibited development
• You must complete Tidal work and coastal management districts-ZOAS form 23
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
• This application requires assessment by the Department of Transport and Main Roads as concurrence
agency
• This application requires assessment by the Department of Community Safety as advice agency
• Subject to the relevant declaration for the wild river area, this application requires assessment by the
Department of Environment and Resource Management
9.13 Is any of the proposed tidal work for a marina with more than 6 vessel berths?
No • You must complete Tidal work and coastal management districts-ZOA5 form 23
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
• This application requires assessment by the Department of Transport and Main Roads as concurrence
agency
Yes • You must complete Tidal work and coastal management districts-/DAS form 23
q
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
• This application requires assessment by the Department of Transport and Main Roads as a concurrence
agency
• This application requires assessment by the Department of Community Safety as advice agency
9.14 Is any of the proposed tidal work to be carried out in one or more of the following tidal areas?
one only local government tidal area q Yes No
starting in one local government tidal area and extending into another local
government tidal area (but in no strategic port tidal area)
q Yes q No
in two or more local government tidal areas but not starting in either local Yes No
q
government tidal area
one only strategic port tidal area Yes No
q
a tidal area that is not a strategic port tidal area or a local government tidal Yes No
area.
• The answers you provide above may affect who the assessment manager is for the application
Section reference:
• Sustainable Planning Regulation 2009, schedule 5, part 1, table 4, items 6 and 7
• Sustainable Planning Regulation 2009, schedule 7, table 2, item 13,15 and 18
:, r -fDAS checklist 4
Version i. o 18 December 2009
Page 36
• Coastal Protection Management Act 1995, section lo4A
Part io-Coastal management
io.1 Is the proposed operational work for the following?
interfering with quarry material on state coastal land above high-water mark
q Yes No
disposing of dredge spoil or other solid waste material in tidal water
q Yes No
draining or allowing drainage or flow water or other matter across state
costal land above high-water mark
0 Yes q No
constructing or installing works in a watercourse where the works are not Yes No
q
assessable under Sustainable PlanningAct2009, schedule 3, part i, table 4,
items 3 or 4
reclaiming land under tidal water LI Yes No
constructing an artificial waterway, other than a canal, associated with
q Yes F] No
reconfiguring a lot
constructing an artificial waterway that is a canal, associated with
q Yes q No
reconfiguring a lot
constructing an artificial waterway not associated with reconfiguring a lot on
q Yes q No
land, other than state coastal land, above high-water if the maximum
surface area of water on the waterway is at least 5000 square metres
constructing a bank or bund wall to establish a ponded pasture on land,
q Yes q No
other than state coastal land, above high-water mark
removing or interfering with coastal dunes on land, other than state coastal Yes No
F]
land, that is in an erosion prone area and above high-water mark.
• If you answered no to all of the above, then end of part io of this checklist
10.2 Is any of the proposed work to be carried out in a wild river area under the Wild Rivers Act 2005?
• You must complete Tidal work and coastal management districts-WAS form 23
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
• This application may require assessment by the Department of Transport and Main Roads as concurrence
agency
• End of part io of this checklist
Yes
q
irk cn, ;; r -IDAS checklist 4
Version i. o 18 December200.
Page 37
10.3 Is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
No • This aspect of the development is prohibited development
F ]Yes • Unless the application is consistent with any property development plan applying to the land, then this
aspect of the development is prohibited development
• You must complete Tidal work and coastal management districts-IDAS form 23
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
• This application may require assessment by the Department of Transport and Main Roads as concurrence
agency
• Subject to the relevant declaration for the wild river area, this application requires assessment by the
Department of Environment and Resource Management
Section reference:
• Sustainable Planning Regulation 2009, schedule 3, part i, table 4, item 5
• Sustainable Planning Regulation 2009, schedule 5, part i, table 4, items 5 and 6
• Sustainable Planning Regulation 2009, schedule 7, table 2, items 13 and 15
• Coastal Protection and ManagementAct 1995, section 1o4A
Part ii-Waterway barrier works
ii.i Is any of the proposed operational work to be carried out in a wild river area declared under the Wild RiversAct
2005?
No
F
Go to question 11.3
1-1 Yes
11.2 Is all of the operational work for constructing or raising waterway barrier works?
temporary
q Yes q No
I minor LI Yes q No
rebuilt on a regular basis.
q Yes q No
• If yes to any of the above, end of part ii of this checklist and a permit for that aspect of the operational work is
not required but it must comply with any applicable self-assessable codes
• If no to all of the above, then in addition to this checklist, you must also complete Building or raising waterway
barrier works-IDAS form 27
• This application requires assessment by the Department of Employment, Economic Development and
Innovation (DEEDI). If DEEDI is not the assessment manager for the application, the role of the agency will be as
a concurrence agency and you must give DEEDI a copy of the application
rk check!, ,-IDAS checklist 4
Version s. 018 December 2009
Page 38
11.3 Is any of the proposed operational work to be carried out in a wild river high preservation area?
No • Unless the application is consistent with any property development plan applying to the land, then this
q
aspect of the development is prohibited development
• You must complete Waterway barrier works-IDAS form 27
• This application requires assessment by the Department of Employment, Economic Development and
Innovation (DEEDI). If DEEDI is not the assessment manager for the application, the role of the agency will
be as a concurrence agency and you must give DEEDI a copy of the application
• Subject to the declaration for the relevant wild river area, assessment may also be required for the
purposes of the WildRiversAct2005
Yes • This aspect of the development is prohibited development
Section reference:
• Sustainable Planning Regulation 2009, schedule 3, part i, table 4, item 6
• Sustainable Planning Regulation 2009, schedule 3, part 2, table 4, item 2
• Sustainable Planning Regulation 2009, schedule 5, part i, table 4, item 8
• Sustainable Planning Regulation 2009, schedule 7, table 2, items 29
• FisheriesAct1994, section 76D
• Fisheries Regulation 1995, section 706
Part 12-Declared fish habitat area
12.1 Is the operational work reasonably necessary for?
the maintenance of existing structures, including for example the following
q Yes No
structures, if the structures were constructed in compliance with all the
requirements under any Act:
• boat ramps, boardwalks, drains, fences, jetties, roads, safety signs,
swimming enclosures and weirs
• existing powerlines or associated powerline infrastructure
educational or research purposes relating to the fish habitat area
q Yes No
monitoring the impact of development on the declared fish habitat area Yes No
the construction or placement of structures, including for example, safety Yes No
signs, swimming enclosures and aids to navigation, if:
• the impact on the area is minor and
• the structures are constructed in compliance with all the requirements,
under any Act
public benefit works, including, for example, the construction of runnels for
mosquito control, the removal of Lyngbya and seed collection for site
0 Yes Dir No
rehabilitation, if the impact on the area is minor
• If yes to any of the above, end of part 12 of this checklist and a permit for that aspect of the operational work is
not required but it must comply with any applicable self-assessable codes
rrk check r-IDAS checklist 4
Version 1. o 18 December 2009
Page 39
12.2 Is that proposed operational work to be carried out in a wild river area declared under the Wild Rivers Act 2005?
No • You must complete Marine plants and declared fish habitat areas-/OAS form 26
• This application requires assessment by the Department of Employment, Economic Development and
Innovation (DEEDI). If DEEDI is not the assessment manager for the application, the role of the agency will
be as a concurrence agency and you must give DEEDI a copy of the application
Yes
12.3 Is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
No
9
Yes • Unless the application is consistent with any property development plan applying to the land, then this
q
aspect of the development is prohibited development
• You must complete Marine plants and declared fish habitat areas-/DAS form 26
• This application requires assessment by the Department of Employment, Economic Development and
Innovation (DEEDI). If DEEDI is not the assessment manager for the application, the role of the agency will
be as a concurrence agency and you must give DEEDI a copy of the application
• Subject to the declaration for the relevant wild river area, assessment may also be required for the
purposes of the Wild Rivers Act 2005
• End of part 12 of this checklist
12.4 Is any of the proposed operational work to be carried out in a wild river high preservation area?
No • Unless the application is consistent with any property development plan applying to the land, the
assessment manager must refuse to receive it
• You must complete Marine plants and declared fish habitat areas-/DAS form 26
• This application requires assessment by the Department of Employment, Economic Development and
Innovation (DEEDI). If DEEDI is not the assessment manager for the application, the role of the agency will
be as a concurrence agency and you must give DEEDI a copy of the application
• Subject to the declaration for the relevant wild river area, assessment may also be required for the
purposes of the Wild Rivers Act 2005
Yes • This aspect of the development is prohibited development
Section reference:
• Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 7
• Sustainable Planning Regulation 2009, schedule 3, part 2, table 4, item 3
• Sustainable Planning Regulation2009, schedule 5, part 1, table 4, item 9
• Sustainable Planning Regulation 2009, schedule 7, table 2, items 26
• Fisher/esAct1994, section 76DC
• Fisheries Regulation 1995, section 706
-, 1'1-,k --1DA5check/ist4
Version 1. o r8 December 2009
Page 40
Part 13-Removal, destruction or damage of a marine plant
13.1 Is the proposed operational work reasonably necessary for?
the removal, destruction or damage of dead marine wood on unallocated Yes No
state land, other than in a wild river area, for trade or commerce
the maintenance of existing structures, including, for example, the following LI Yes No
structures, if the structures were constructed in compliance with all the
requirements, under any Act:
• boat ramps, boardwalks, drains, fences, jetties, roads, safety signs,
swimming enclosures and weirs
• existing drainage structures
• existing powerlines or associated powerline infrastructure
for educational or research purposes or for the monitoring the impact of
development on marine plants
q Yes No
for the construction or placement of structures, (e.g. swimming enclosures, No
q Yes
safety signs, aids to navigation, fences, pontoons, public boat ramps and
pipelines) if:
• the extent of the removal, destruction or damage is minor and
• the structures were constructed in compliance with all the requirements,
under any Act
for the construction of runnels for mosquito control, removal of Lyngbya,
q Yes LI No
seed collection for site rehabilitation or the collection of marine plants for
fishing bait, or handicraft
• If yes to any of the above, end of part 13 of this checklist and a permit for that aspect of the operational work is
not required but it must comply with any applicable self-assessable codes
13.2 Is that proposed operational work to be carried out in a wild river area declared under the Wild Rivers Act 20057
No • You must complete Marine plants and declared fish habitat areas-/OASform 26
q
• This application requires assessment by the Department of Employment, Economic Development and
Innovation (DEEDI). If DEEDI is not the assessment manager for the application, the role of the agency will
be as a concurrence agency and you must give DEEDI a copy of the application
• End of part 13 of this checklist
Yes
13.3 Is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
• Unless the application is consistent with any property development plan applying to the land, then this
aspect of the development is prohibited development
• You must complete Marine plants and declared fish habitat areas-IDAS form 26
,rk c he:_ :: r-IDAS check/ist 4
Version i. o 18 December 2009
Page 41
• This application requires assessment by the Department of Employment, Economic Development and
Innovation (DEEDI). If DEEDI is not the assessment manager for the application, the role of the agency will
be as a concurrence agency and you must give DEEDI a copy of the application
• Subject to the declaration for the relevant wild river area, assessment may also be required for the
purposes of the Wild Rivers Act 2005
• End of part 13 of this checklist
13.4 Is all of the proposed operational work necessary and unavoidable part of installing or maintaining works or
infrastructure required to support other development for which a development permit is not required or, if a
development permit is required, the permit is held or has been applied for?
No • This aspect of the development is prohibited development
q
E]Yes • Unless the application is consistent with any property development plan applying to the land, then this
aspect of the development is prohibited development
• You must corn p lete Marine plants and declared fish habitat areas-IDAS form 26
• This application requires assessment by the Department of Employment, Economic Development and
Innovation (DEEDI). If DEEDI is not the assessment manager for the application, the role of the agency will
be as a concurrence agency and you must give DEEDI a copy of the application
• Subject to the declaration for the relevant wild river area, assessment may also be required for the
purposes of the Wild Rivers Act2oo5
Section reference:
• Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 8
• Sustainable Planning Regulation 2009, schedule 3, part 2, table 4, item 4
• Sustainable Planning Regulation 2009, schedule 7, table 2, items 30
• FisheriesAct2994, section 76DB
• Fisheries Regulation 1995, section 706
Part 14-Wild river area
14.1 Is the proposed operational work for the following and also declared under the wild river declaration for the
area to be assessable?
agricultural activities as defined under the Wild Rivers Act 2005
q Yes q No
animal husbandry activities as defined under the Wild Rivers Act 2005 LI Yes No
q
• If no to all of the above, then end of part 14 of this checklist
14.2 Is any part of the premises in the wild river high preservation area?
No
q
q Yes • This aspect of development is prohibited development
• End of part 14 of this checklist
work checklisr-IDAS checklist 4
Version 1. o 18 December 2009
Page 42
14.3 Is the proposed use in relation to the production of a high risk species as defined under the Wild RiverAct
I 2005?
No • Unless the application is consistent with any property development plan applying to the land, then this
aspect of the development is prohibited development
• You must complete Agricultural activities in a wild river area -IDAS form 29 if agricultural activities to occur
• You must complete Animal husbandry activities in a wild river area-IDASform3o if the development
involves animal husbandry
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
• Subject to the declaration for the relevant wild river area, assessment may also be required for the
purposes of the Wild Rivers Act 2005
Yes • This aspect of the development is prohibited development
Section reference:
• Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 9
• Sustainable Planning Regulation 2009, schedule 7, table 2, items 42
• Wild Rivers Act 2005, sections 42
Part 15-State-controlled roads
15.1 Is the proposed use associated with a material change of use under a planning scheme or reconfiguring a lot
that increases the total number of lots or the total number of lots adjacent to state-controlled roads?
FJYes • End of checklist
15.2 Is any of the proposed operational work associated with access to a state-controlled road?
No
Yes • This application requires assessment by the Department of Transport and Main Roads as concurrence
agency
15.3 Is any of the proposed operation work for filling or excavation?
No
Yes • This application requires assessment by the Department of Transport and Main Roads as concurrence
agency
Version i. o 18 December 2009
Page 43
15.4 Does any of the proposed operational work involve the redirection or intensification of site stormwater from the
land through a pipe with a cross-sectional area greater than 625 square centimetres that directs stormwater to a
state-controlled road?
No
Yes • This application requires assessment by the Department of Transport and Main Roads as concurrence
agency
Section reference:
• Sustainable PlanningRegulation2oo9, schedule 7, table 2, item 3
Notes for completing this form:
• Applicant details-IDASform land Development application assessment-IDAS checklist i must be completed
for all development applications to be considered
• The Sustainable PlanningAct2009 is administered by the Department of Infrastructure and Planning
Privacy-please refer to your assessment manager for further details on the use of information recorded in
this form
Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that the information contained on this form and
provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the
information without first making your own enquiries regarding the interpretation and application of the applicable
legislation to your circumstances.
To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or
other consequence which may arise from your reliance on this process and the information contained on this form.
OFFICE USE ONLY
Date received Reference numbers
The Sustainable Planning Act2009is administered by the Department of Infrastructure and Planning.
i, ,k r r -IDAS checklist 4
Version Y. o 18 December 2009
Used in these records
Development Application - Part 1 - Cover Letter - IDAS Form 1 (plus 2 x Form 1 page 2) and 6 Checklist 4Related documentApplication case desk ↗
About this file
- File size
- 8.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.