Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Development Application - Part 1 - Cover Letter - IDAS Form 1 (plus 2 x Form 1 page 2) and 6 Checklist 4 · OPW11/0098

of 43

Text shows just the words. Original shows the document exactly as it was published.

    10.3 Is all of the proposed operational work for specified works under the Wild Rivers Act 2005?


         No       •   This aspect of the development is prohibited development

    F ]Yes        •   Unless the application is consistent with any property development plan applying to the land, then this
                      aspect of the development is prohibited development
                  •   You must complete Tidal work and coastal management districts-IDAS form 23
                  •   This application requires assessment by the Department of Environment and Resource Management
                      (DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
                      concurrence agency and you must give DERM a copy of the application
                  •   This application may require assessment by the Department of Transport and Main Roads as concurrence
                      agency
                  •   Subject to the relevant declaration for the wild river area, this application requires assessment by the
                      Department of Environment and Resource Management


Section reference:
•     Sustainable Planning Regulation 2009, schedule 3, part i, table 4, item 5
•     Sustainable Planning Regulation 2009, schedule 5, part i, table 4, items 5 and 6
•     Sustainable Planning Regulation 2009, schedule 7, table 2, items 13 and 15
•     Coastal Protection and ManagementAct 1995, section 1o4A




    Part ii-Waterway barrier works

    ii.i Is any of the proposed operational work to be carried out in a wild river area declared under the Wild RiversAct
    2005?


         No
    F
                      Go to question 11.3
    1-1 Yes


    11.2 Is all of the operational work for constructing or raising waterway barrier works?



    temporary
                                                                                        q Yes       q    No

I minor                                                                                 LI Yes      q    No

    rebuilt on a regular basis.
                                                                                        q Yes       q    No


•     If yes to any of the above, end of part ii of this checklist and a permit for that aspect of the operational work is
      not required but it must comply with any applicable self-assessable codes


•     If no to all of the above, then in addition to this checklist, you must also complete Building or raising waterway
      barrier works-IDAS form 27
•     This application requires assessment by the Department of Employment, Economic Development and
      Innovation (DEEDI). If DEEDI is not the assessment manager for the application, the role of the agency will be as
      a concurrence agency and you must give DEEDI a copy of the application



                                                                                               rk check!, ,-IDAS checklist 4
                                                                                               Version s. 018 December 2009

Used in these records

About this file

File size
8.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application - Part 1 - Cover Letter - IDAS Form 1 (plus 2 x Form 1 page 2) and 6 Checklist 4.pdf · 8.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.