                  RE: Bushfire Management Plan – 215 David Low Way, Peregian Beach



                                                                                    Compliance
     Mitigation
                                          Requirements                               achieved?
      Measure
                                                                                      (Yes/No)
                                                                                 YES (based on a
                          Any planted trees should be of species which
                                                                                   review of the
                           grow to over 2m, to maintain separation
                                                                             proposed Landscape
                           between lower canopy and the ground.
                                                                                  Concept Plan)
                                                                              Alternate Solution.
                                                                                 The OPA will be
                                                                               comprised of a 3m
                          West of the balance area - 5m wide.                 trail running along
                                                                                 the boundary of
 APZ – Outer                                                                  adjacent land to be
 Protection Area                                                             dedicated to council.
 (OPA)                                                                         As a minimum, the
                                                                               3m trail should be
                          should have understorey managed (mowed) to
                                                                             slashed on an annual
                           treat all shrubs and grasses on an annual basis
                                                                               basis in advance of
                           in advance of the commencement of the fire
                                                                              the commencement
                           season (i.e. September).
                                                                                of the fire season
                                                                                (i.e. September).


It is considered that the proposed development layout is generally compliant with the relevant
requirements of the approved Bushfire Management Plan (i.e. DFS Group 2015). A slight
relaxation of the Inner Protection Area (IPA) width adjacent to proposed dwelling No. 10 is
required, and a 3m wide fire trail on adjoining land to be dedicated to Council will form the
Outer Protection Area (OPA), with the overall width of the APZ maintained at a minimum of
15m (with the exception of proposed dwelling No. 10 as discussed above). These minor
deviations from the requirements of the BMP are not considered to put future residents of the
development at elevated risk during a bushfire emergency, provided all other aspects of the
BMP are complied with (including a BAL assessment).

Please do not hesitate to contact me if you require any further clarification.

Yours faithfully,
JWA Pty Ltd




Adam McArthur
Group Operations Manager/Principal Ecologist




Ref: AM/Q15012/Lw3                             JWA Pty Ltd                                 3
Log in to download the original file

Appendices 6 SMP, 7 Bushfire & 8 Noise impact - Email 3 of 4 - MCU16_0153 & REC16_0041.pdf · 13.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.