Skip to the record
Search everything, all in one place.

Council archive · source document

MCU15/0016 Approved Decision Notice

of 1

Text shows just the words. Original shows the document exactly as it was published.

Officer:	Jack Lewis
Direct Telephone:	07 5329 6236
Our Reference:	JLEWIS:MCU15/0016
Your Reference:	01542

21 July 2015

Mr I Kippen & Ms LM Kippen
C/- Martoo Consulting Pty Ltd
PO Box 1684
NOOSA HEADS  QLD  4567

[email protected]

Dear Sir/Madam

Decision Notice
Sustainable Planning Act 2009

I refer to your application and advise that on 20 July 2015, Council decided to approve the application in full subject to conditions.

Details of the decision are as follows:
APPLICATION DETAILS

Application No:	MCU15/0016
Street Address:	73 Rene St NOOSAVILLE  QLD  4566
Real Property Description:	Lot 1 SP 244573
Planning Scheme:	The Noosa Plan (16 September 2013)

DECISION DETAILS

The following type of approval has been issued:
Development Permit for Material Change of Use - Industrial Business Type 2 (Vehicle workshop) and Ancillary Dwelling Unit

RELEVANT PERIOD OF APPROVAL

The relevant period for this development approval is 4 years starting the day that this development approval takes effect.

ASSESSMENT MANAGER CONDITIONS

PLANNING
When Conditions must be Complied With
Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues.
Approved Plans
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed below and as may be amended by the conditions herein.
Plan No.	Rev.	Plan/Document Name	Date
SD.101	P8	Survey & Locality Plan drawn by Ian Gorton Design	Oct 2013
SD.201	P8	Ground Floor Plan drawn by Ian Gorton Design	Oct 2013
SD.202	P8	Upper Floor Plan drawn by Ian Gorton Design	Oct 2013
SD.501	P8	Elevations drawn by Ian Gorton Design	Oct 2013
SD.502	P8	Sketch Renderings drawn by Ian Gorton Design	Oct 2013
15BRT0033-01	B	Proposed Traffic Managements, prepared by TTM Consulting	12-05-2015
Nature and Extent of Approved Use
No external storage or use areas are approved on the site.
Any display and retail sale of goods must remain an ancillary component to the approved use provided that space does not exceed 20% of the total use area.
Building Height
The maximum height of the development must not exceed 8 metres above the finished ground level and the natural ground level.
Building Appearance
The development must be finished with subdued external building colours.
Any fencing to the road frontage must be set back at least 1 metre from the street boundary, and must have a minimum average setback of 2 metres to the street boundary. All land between the fence and the front property boundary must be densely landscaped.
All air conditioning units or other mechanical equipment must be fully enclosed or screened such that they are not visible from the street frontages.
Landscaping
The development site must be landscaped.  The works must be undertaken in accordance with an Operational Works approval and The Noosa Plan’s Planning Scheme Policy 3 Landscaping Plants and Guidelines for that specific area and must include:
The landscaped areas as generally shown on the approved Site Plan, except where amended by conditions contained herein.
Appropriate street trees varieties within the front setback area and the road reserve to soften building bulk.
All plantings in or near existing and proposed storm water infrastructure are to be coordinated with the stormwater drainage plans and must not interfere with the operational function of the storm water devices, either by root interference, shading or other means.
Landscaping plans must show the location of all water quality devices.
All landscape works must be established and maintained in accordance with the approved design for the life of the development, and in a manner that ensures healthy, sustained and vigorous plant growth.  All plant material must be allowed to grow to full form and be refurbished when its life expectancy is reached.
Waste
The developer must provide waste storage and disposal facilities in accordance with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, including an external imperviously paved area correctly sized for all refuse and recycling containers and suitably screened from public places and neighbouring properties. A bin wash area is required with a cold-water tap, hose and drain outlet connected to sewer, via a bucket trap. The drain outlet is to be designed to prevent storm water entry to the sewerage system and this can be achieved with a nib wall 50mm high and up to 700mm x 700mm wide (max 0.5m²). The bin wash area shall be located outside of the approved landscape areas.
The development must allow refuse-loading areas to be located off street.  All vehicles associated with the collection of waste/recyclables, shall enter and leave the site in a forward direction.
Performance Bond
Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Operational Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions.
Water & Sewer Connections
An underground connection to reticulated water and sewerage must be provided to the development site in accordance with the standards and requirements of Northern SEQ Distributor–Retailer Authority (Unitywater).
A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater) must be submitted to Council that certifies an underground connection to reticulated water and sewerage has been provided to the development site.
All waste water should be disposed to sewer in accordance with requirements of Unitywater.
Amenity
The development must not create detrimental impacts on the amenity of the area due to the creation of excessive noise, odour nuisance or other emissions.
ENGINEERING
Site Access and Driveway
A sealed access driveway must be provided from Rene Street to all parking and manoeuvring areas of the development. The works must be undertaken in accordance with an Operational Works approval and must include in particular:
Layout and linemarking in accordance to plan no 15BRT0033-01(Rev B) titled Proposed Traffic Managements, prepared by TTM Consulting	 and dated 13 May 2015
IPWEAQ standard drawing R 051.
Car Parking
Car parking spaces must be provided and marked on the site, and made available and accessible at all times while the use is open for business.  The works must be undertaken in accordance with an Operational Works approval and the approved plans, and must include crossfalls and gradients in accordance with Australian Standard AS2890: Parking Facilities.
All car parking areas and access driveways must be maintained exclusively for vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
Directional signage must be provided to direct customers to the car parking spaces provided on site.
Service Vehicles
Service vehicle parking, maneuvering and standing spaces must be provided on the site.  The works must be undertaken in accordance with an Operational Works approval and the approved plans.
Bicycle Facilities
Bicycle facilities must be provided for the development.  The works must be undertaken in accordance with an Operational Works approval and must include in particular:
a minimum of 9 bicycle parking spaces; and
end of trip facilities including a minimum of 6 lockers, 1 shower and change rooms.
Stormwater Drainage
The site must be provided with a stormwater drainage system connecting to a lawful point of discharge.  The works must be undertaken in accordance with an Operational Works approval and in compliance with Queensland Urban Drainage Manual (QUDM).
Easements
Unless otherwise agreed in writing by the relevant service provider, any public or third party infrastructure located on the subject site must be placed within an easement registered against the title of the property.
All easements must be designed in accordance with the planning scheme and granted at no cost to the Grantee.  Where the Grantee is Council or a service authority, the easement documentation must be in accordance with the Grantee’s standard easement terms.  Draft easement documentation must be submitted to Council for endorsement.
All works must be kept clear of any existing or proposed easements on the subject land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
All earthworks must be undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
Damage to Services and Assets
Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times:
where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or
where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval.

REFERRAL AGENCIES

Not Applicable.

ADVISORY NOTES

The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions:
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations under the ACH Act.
Equitable Access and Facilities
The plans for the proposed building work have NOT been assessed for compliance with the requirements of the National Construction Code - Building Code of Australia (Volume 1) as they relate to people with disabilities. Your attention is also directed to the fact that in addition to the requirements of the National Construction Code as they relate to people with disabilities, one or more of the following may impact on the proposed building work:
the Disability Discrimination Act 1992 (Commonwealth);
the Anti-Discrimination Act 1991 (Queensland); and
the Disability (Access to Premises – Buildings) Standards.
Development Compliance Inspection
Prior to the commencement of the use, please contact Council's DA Planning Section to arrange a Development Compliance Inspection.
Infrastructure Charges
This Development Permit will trigger an “Infrastructure Charge Notice” to be issued in accordance with Council’s “Adopted Infrastructure Charges Resolution” under the State Planning Regulatory Provision (Adopted Charges) and the Sustainable Planning Act 2009.
Building and Construction Industry (Portable Long Service Leave) Levy
The QLeave levy must be paid prior to the issue of a development permit where it is required. Council will not be able to issue a Decision Notice for Operational Works without receipt of details that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212 6855.
Co-ordination of Operational Works Assessment
Additional application fees apply to Operational Work applications where the different aspects of the works are lodged separately. Significant savings in application fees will result if all works are lodged in a single application.
A preliminary Construction Management Plan must be submitted with the Operational Works application and must address the following:
traffic management during all aspects of the construction phase including:
Traffic Management Control Plan in accordance with the Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction
maintenance of safe pedestrian access for the areas affected by the works during and after daily construction has ceased
proposed fencing to the site during the construction phase of the development
maintenance and protection of water quality and existing drainage lines through the construction site, through the implementation of appropriate erosion and sediment control measures
works programme identifying key components of the works and their respective durations.
establishment of a communication protocol with the general public, adjoining owners, emergency services and local businesses to advise of agreed construction times, impacts on traffic, services and other relevant issues
identification of complaint management procedures including:
contact details for the on-site manager
dispute resolution procedures.
It is acknowledged that the preliminary Construction Management Plan will be a draft document requiring finalisation upon appointment of the Principal Contractor employed to construct the works and a final document will be required to be submitted prior to the Pre-Start Meeting for the project.
Community Title Scheme - Private Infrastructure
All private infrastructures for the development must be designed to meet the planning scheme requirements unless otherwise agreed by the relevant authority.
Acoustic Advice & Design
It is highly recommended that the developer seek the advice and design input of a qualified acoustic consultant at the plan development stage to ensure the development does not cause a noise nuisance under the Environmental Protection Act 1994 or this Decision Notice.  Attention should be given to the following (but not limited to):
building design and construction.
design, selection and installation of fixed plant and equipment.
the location of air conditioning and heating units, refrigeration plant, pumps, mechanical exhausts and plant rooms etc.
the use of acoustic enclosures/screens around noisy plant and  equipment.
operating times.
Environmental Protection
The development should be undertaken in a manner that causes no unlawful environmental nuisance under the Environmental Protection Act 1994 by the creation of excessive noise, lighting, waste, atmospheric pollutants (including dust or odours) or other releases to the environment.
In accordance with the Environmental Protection Act 1994, all sand, silt, mud, paint, cement, concrete, builder’s waste or other prescribed contaminants should not to be released to or be placed where it could reasonably be expected to move into a roadside gutter, storm water drain or a watercourse.  On the spot fines apply for such offences.

PROPERTY NOTES

Not Applicable.

PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME

Not Applicable.

FURTHER DEVELOPMENT PERMITS REQUIRED

Development Permit for Operational Work
Development Permit for Building Work

SELF ASSESSABLE CODES

Advertising Devices Code

SUBMISSIONS

No properly made submissions were received about this application.

REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME

Not Applicable.

RIGHTS OF APPEAL

You are entitled to appeal against this decision.  A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached.

During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval.  If Council agrees or agrees in part with the representations, a “negotiated decision notice” will be issued.  Only one “negotiated decision notice” may be given.  Taking this step will defer your appeal period, which will commence again from the start the day after you receive a “negotiated decision notice”.

OTHER DETAILS

If you wish to obtain more information about Council’s decision, electronic copies are available on line at www.noosa.qld.gov.au, or at Council Offices.

Yours faithfully

Jack Lewis
DEVELOPMENT PLANNER

Enc:	Infrastructure Charges Notice
Approved Plans/Documents
Appeal Rights

cc	Unitywater

	Appeal Rights SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009

The following is an extract from the Sustainable Planning Act 2009  (Chapter 7).
MATERIAL CHANGE OF USE, RECONFIGURING A LOT & OPERATIONAL WORKS

Division 8 	Appeals to court relating to development applications and approvals

461 	Appeals by applicants
(1) 	An applicant for a development application may appeal to the court against any of the following—
(a) 	the refusal, or the refusal in part, of the development application;
(b) 	any condition of a development approval, another matter stated in a development approval and the identification or inclusion of a code under section 242;
(c) 	the decision to give a preliminary approval when a development permit was applied for;
(d) 	the length of a period mentioned in section 341;
(e) 	a deemed refusal of the development application.
(2) 	An appeal under subsection (1)(a), (b), (c) or (d) must be started within 20 business days (the applicant’s appeal period) after—
(a) 	if a decision notice or negotiated decision notice is given—the day the decision notice or negotiated decision notice is given to the applicant; or
(b) 	otherwise—the day a decision notice was required to be given to the applicant.
(3) 	An appeal under subsection (1)(e) may be started at any time after the last day a decision on the matter should have been made.

462 	Appeals by submitters—general
(1) 	A submitter for a development application may appeal to the court only against—
(a) 	the part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or
(b) 	the part of the approval relating to the assessment manager’s decision under section 327.
(2) 	To the extent an appeal may be made under subsection (1), the appeal may be against 1 or more of the following—
(a) 	the giving of a development approval;
(b) 	any provision of the approval including—
(i) 	a condition of, or lack of condition for, the approval; or
(ii) 	the length of a period mentioned in section 341 for the approval.
(3) 	However, a submitter may not appeal if the submitter—
(a) 	withdraws the submission before the application is decided; or
(b) 	has given the assessment manager a notice under section 339(1)(b)(ii).
(4) 	The appeal must be started within 20 business days (the submitter’s appeal period) after the decision notice or negotiated decision notice is given to the submitter.

463 	Additional and extended appeal rights for submitters for particular development applications
(1) 	This section applies to a development application to which chapter 9, part 7 applies.
(2) 	A submitter of a properly made submission for the application may appeal to the court about a referral agency’s response made by a prescribed concurrence agency for the application.
(3) 	However, the submitter may only appeal against a referral agency’s response to the extent it relates to—
(a) 	if the prescribed concurrence agency is the chief executive (environment)—development for an aquacultural ERA; or
(b) 	if the prescribed concurrence agency is the chief executive (fisheries)—development that is—
(i) 	a material change of use of premises for aquaculture; or
(ii) 	operational work that is the removal, damage or destruction of a marine plant.
(4) 	Despite section 462(1), the submitter may appeal against the following matters for the application even if the matters relate to code assessment—
(a) 	a decision about a matter mentioned in section 462(2) if it is a decision of the chief executive (fisheries);
(b) 	a referral agency’s response mentioned in subsection (2).

464 	Appeals by advice agency submitters
(1) 	Subsection (2) applies if an advice agency, in its response for an application, told the assessment manager to treat the response as a properly made submission.
(2) 	The advice agency may, within the limits of its jurisdiction, appeal to the court about—
(a) 	any part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or
(b) 	any part of the approval relating to the assessment manager’s decision under section 327.
(3) 	The appeal must be started within 20 business days after the day the decision notice or negotiated decision notice is given to the advice agency as a submitter.
(4) 	However, if the advice agency has given the assessment manager a notice under section 339(1)(b)(ii), the advice agency may not appeal the decision.

465 	Appeals about decisions relating to extensions for approvals
(1) 	For a development approval given for a development application, a person to whom a notice is given under section 389, other than a notice for a decision under section 386(2), may appeal to the court against the decision in the notice.
(2) 	The appeal must be started within 20 business days after the day the notice of the decision is given to the person.
(3) 	Also, a person who has made a request under section 383 may appeal to the court against a deemed refusal of the request.
(4)	An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made.

466 	Appeals about decisions relating to permissible changes
(1) 	For a development approval given for a development application, the following persons may appeal to the court against a decision on a request to make a permissible change to the approval—
(a) 	if the responsible entity for making the change is the assessment manager for the application—
(i) 	the person who made the request; or
(ii) 	an entity that gave a notice under section 373 or a pre-request response notice about the request;
(b) 	if the responsible entity for making the change is a concurrence agency for the application—the person who made the request.
(2) 	The appeal must be started within 20 business days after the day the person is given notice of the decision on the request under section 376.
(3) 	Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal of the request.
(4)	An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made.

467 	Appeals about changing or cancelling conditions imposed by assessment manager or concurrence agency
(1) 	A person to whom a notice under section 378(9)(b) giving a decision to change or cancel a condition of a development approval has been given may appeal to the court against the decision in the notice.
(2) 	The appeal must be started within 20 business days after the day the notice of the decision is given to the person.

[word/footer1.xml]
Page 9 of 10

[word/footer2.xml]
PO Box 141		P. (07) 5329 6500	[email protected]	
	TEWANTIN  QLD  4565	F. (07) 5329 6501	www.noosa.qld.gov.au
				Page 1 of 10

[word/header1.xml]
MCU15/0016

[Attachment: image4.png (image text)]
 
 
 

 
 
 

a
mm

  

NOOSA
COUNCIL

Used in these records

About this file

File size
105 KB (small file)
File type
DOCX

No other editions are linked here.

Original file

Log in to download the original file

MCU15_0016 Approved Decision Notice.docx · 105 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.