Council archive · source document
Operational Woks Application OPW18-0071, DA Form 1, 1 of 2 · OPW18/0071
Very large file (12.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Department of Infrastructure, Local Government and Planning
Section 2 — Further development details
7) Does the proposed development application involve any of the following?
Material change of use LJ Yes — complete division 1 if assessable against a local planning instrument
Reconfiguring a lot LJ Yes — complete division 2
Operational work L] Yes — complete division 3
Building work L Yes — complete DA Form 2 — Building work details
Division 1 — Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a local
planning instrument.
8.1) Describe the proposed material change of use
Provide the planning scheme definition
(include each definition in a new row)
Gross floor
area (m?)
(if applicable)
Number of dwelling
units (if applicable)
Provide a general description of the
proposed use
8.2) Does the proposed use involve the use of existing buildings on the premises?
(Yes
LINo
Division 2 — Reconfiguring a lot
Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.
9.1) What is the total number of existing lots making up the premises?
9.2) What is the nature of the lot reconfiguration? (tick all applicable boxes)
LJ Subdivision (complete 10) LJ Dividing land into parts by agreement (complete 11))
L Boundary realignment (complete 12)) C Creating or changing an easement giving access to a lot from
a construction road (complete 13))
10) Subdivision
10.1) For this development, how many lots are being created and what is the intended use of those lots:
Residential Commercial Industrial Other, please specify:
Intended use of lots created
Number of lots created
10.2) Will the subdivision be staged?
C1 Yes — provide additional details below
LI No
How many stages will the works include?
What stage(s) will this development application
apply to?
11) Dividing land into parts by agreement — how many parts are being created and what is the intended use of the
ferent
Intended use of parts created Residential Commercial Industrial Other, please specify:
Number of parts created
Page 4
DA Form 1 — Development Application details
Version 1.0—3 July 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Operational Woks Application OPW18-0071, DA Form 1, 1 of 2 .pdfRelated documentApplication case desk ↗
About this file
- File size
- 12.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.