Skip to the record
Search everything, all in one place.

Council archive · source document

Operational Woks Application OPW18-0071, DA Form 1, 1 of 2 · OPW18/0071

of 16

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (12.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Department of Infrastructure, Local Government and Planning

 

Section 2 — Further development details
7) Does the proposed development application involve any of the following?

  

   
    
      
 

Material change of use LJ Yes — complete division 1 if assessable against a local planning instrument
Reconfiguring a lot LJ Yes — complete division 2

Operational work L] Yes — complete division 3

Building work L Yes — complete DA Form 2 — Building work details

   

 

  

Division 1 — Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a local
planning instrument.

8.1) Describe the proposed material change of use

Provide the planning scheme definition
(include each definition in a new row)

        
   

   

   

Gross floor
area (m?)
(if applicable)

Number of dwelling
units (if applicable)

Provide a general description of the
proposed use

  

 

 

 

 

 

 

 

8.2) Does the proposed use involve the use of existing buildings on the premises?

(Yes
LINo

 

 

Division 2 — Reconfiguring a lot
Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.

9.1) What is the total number of existing lots making up the premises?

   

9.2) What is the nature of the lot reconfiguration? (tick all applicable boxes)
LJ Subdivision (complete 10) LJ Dividing land into parts by agreement (complete 11))

L Boundary realignment (complete 12)) C Creating or changing an easement giving access to a lot from
a construction road (complete 13))

    

 

 
   
 
  
 
  

   

10) Subdivision
10.1) For this development, how many lots are being created and what is the intended use of those lots:

Residential Commercial Industrial Other, please specify:

   
 

Intended use of lots created

   

 

 

 

  
  

Number of lots created
10.2) Will the subdivision be staged?
C1 Yes — provide additional details below
LI No

How many stages will the works include?

What stage(s) will this development application
apply to?

 

 

 

11) Dividing land into parts by agreement — how many parts are being created and what is the intended use of the

ferent
Intended use of parts created Residential Commercial Industrial Other, please specify:

 

 

 

 

 

 

 

 

 

Number of parts created

 

Page 4
DA Form 1 — Development Application details
Version 1.0—3 July 2017

Used in these records

About this file

File size
12.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Operational Woks Application OPW18-0071, DA Form 1, 1 of 2 .pdf · 12.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.