Council archive · source document
TL52 DA and Car parking credits · MCU22/0053
TPiy 52 Letter R. J. Quinn 24.12.84 2 10. it. 12. 13. 14. Connection to Council's sewerage system. Connection to Council's water supply facility at the applicant's expense. . Stormwater, including that from roofed and paved areas to be disposed of by underground means to Council's existing disposal facilities. No earthworks or filling shall be carried out on the site until the issue of a building permit. Comply with the reasonable requirements of the Regional Fire Safety Officer. The approval given herein does not absolve the applicant from the responsibility of submitting for approval, working drawings complying with the Building Act 1975 as amended and the Standard Building Bylaws. Such drawings shall be substantially in accordance with the Town Planning Consent approval and related drawings and approval pursuant to the Building Act shall be Obtained prior to any building works being carried out on the site. This consent approval does not imply that building approval will be granted. The approval herein is for Town Planning Layout only and does not imply that Council consent will be granted to an application under the Group Titles Act or Building Unit Titles Act. In accordance with Clause 3 (2) of Part II of Council Bylaws, Chapter XLIV (Town Planning), Council's approval is valid for a period of two (2) years at the expiration of which period the Council may take action to revoke its approval if in the opinion of the Council, substantial progress has not been made in erecting the building or other structure the subject of the consent permit; or the land, the subject of the consent permit, is not being used substantially in accordance with the purposes for which consent was granted. An identification survey of the subject site is to be carried out by an authorised surveyor and is to be submitted to Council at the time of the foundation inspection by the Council's Building Surveyor or immediately thereafter. Such survey shall set out the boundaries of the site and the position of the building(s) on the site. To ensure compliance with any and all conditions of this approval, Council will require that you enter into a Bank Bond to guarantee performance. The value of such bond would be determined and would need to be lodged prior to issue of a building permit and any costs incidental thereto will be the applicant's responsibility.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
TL52 DA and Car parking credits.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.