PART 14 – ASSESSMENT CRITERIA FOR DEVELOPMENT FOR A STATED
                PURPOSE OR OF A STATED TYPE
                                       Division 16 – Existing Services
Table 14-54 Existing Services

            Column 1                                      Column 2                                    Column 3
        Specific Outcomes                            Probable solutions                               Response
                                                    (if code assessable)
 14.124 Effects of works
 Setbacks and easements
 O1 Development near a sewer,             S1.1 The footing of any structure or             Complies
 water main, stormwater drain,            building is located clear of the zone of         The site has existing connections
 overland flow path or associated         influence but no                                 to all necessary urban services,
 structure does not—                      closer than 1.5m (measured horizontally)         including Council’s reticulated
 a) adversely affect the function of      from infrastructure including sewers, water      water supply and sewerage
     the service;                         mains and stormwater structures;                 disposal systems, stormwater
 b) place an additional load on the                                                        infrastructure, bitumen sealed
     service; and                         S1.2 No building or structure overhangs          roads, electricity and
 c) unduly increase future                the zone of influence;                           telecommunications. It is not
     maintenance costs.                                                                    encumbered by any easements.
                                          S1.3 Finished surface levels maintain a          The proposal would be sufficiently
                                          minimum of 600mm of cover, but no                clear of existing infrastructure.
                                          greater than 3m of cover to the                  Infrastructure contributions would
                                          underground infrastructure;                      be provided in accordance with
                                                                                           the Charges Resolution (No. 3)
                                          S1.4 If the existing surface level is altered,   2018.
                                          surface level services including manholes
                                          and inspection points are altered to match
                                          the new surface level.

                                          S1.5 Alterations are constructed in
                                          accordance with Section 4 of PSP5 –
                                          Engineering Design Standards – Roads,
                                          Drainage and Earthworks and applicable
                                          water and sewerage design standards;
                                          OR
                                          S1.6 Existing services are relocated and
                                          the design and construction of the
                                          relocated services is in accordance with
                                          Section 4 of PSP5 –Engineering Design
                                          Standards – Roads, Drainage and
                                          Earthworks and applicable water and
                                          sewerage design standards.
 O2 Maintenance access is provided        S2.1 For trunk infrastructure a registered       N/A
 to all sewers, water mains, stormwater   easement in favour of Council is created
 drains, overland flow paths and          over all underground infrastructure located
 associated structures.                   in private property;

                                          S2.2 The width of the easement is the
                                          greater of 3m or the width of the zone of
                                          influence;

                                          S2.3 The easement is centred over the
                                          centreline of the infrastructure.




Part 14 – Assessment Criteria – Codes (The Noosa Plan)                                                              Page 16 of 28
Log in to download the original file

Appendix 9 - Detailed assessment against the Noosa plan.pdf · 1.1 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.