Original source · versioned page text
Appendix 9 - Detailed assessment against the Noosa plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPART 14 – ASSESSMENT CRITERIA FOR DEVELOPMENT FOR A STATED
PURPOSE OR OF A STATED TYPE
Division 20 – Water Sensitive Design Code
Table 14-61
Column 1 Column 2 Column 3
Specific Outcomes Probable solutions Response
(if code assessable)
Maintenance of environmental values
and water quality objectives
O1 Downstream ecosystems, properties S1.1 Development meets the applicable Complies
and infrastructure are not adversely performance outcomes of the State Planning Refer to the stormwater
impacted by either changes to flow, water Policy Appendix 2 SPP Code: Water Quality; management report
quality or ecosystem health caused by
development. S1.2 Design and construction methods for
stormwater quality treatment assets are in
accordance with Healthy Waterways Water By
Design Guidelines;
S1.3 Commitments are made to implement a cost
effective maintenance strategy for the life cycle of
any engineered water quality treatment device;
S1.4 Water quality nutrient load modelling is
undertaken in accordance with Water by Design
Music Modelling Guidelines to demonstrate
compliance with the SPP nutrient reduction
requirements; AND
S1.5 Stormwater outlets that directly discharge to
naturally acidic environments are managed to
prevent eutrophication; AND
S1.6 Suitable methods are incorporated to prevent
the spread of invasive environmental weed
species at stormwater outlets.
Water demand
O2 Urban development reduces the S2.1 Captured water is plumbed to be available for Complies
need for mains water by capturing all external uses including gardening, irrigation, Refer to the stormwater
and utilising run-off from appropriate ponds and outdoor cleaning. management report
areas on site.
S3.1 Planting is in accordance with PSP 3
O3 Urban development reduces the Landscaping Plans and Guidelines.
need for mains water by eliminating
requirement for irrigation via the use the
endemic plant landscaping design. S4.1 A suitable backflow prevention device is
installed to protect the drinking water within the
O4 Backflow devices or similar systems reticulated water supply in accordance with Complies
are installed, where necessary, to ensure AS/NZS 3500:2003 Plumbing and Drainage. This can be conditioned
water reuse facilities have no impact on as part of the approval
the quality of the town mains water.
Shire Business Centre
O5 Within the Shire Business Centre No probable solution N/A
site, as shown on Map SBC run-off
treatment is contained within the
developable areas of the site and
drainage lines are only used for final
polishing of run-off;
O6 Within the Shire Business Centre
site, as shown on Map SBC, on-site
detention measures are contained
within the developable areas of the
site, clear of drainage lines and Open
Space Precincts.
Use of natural treatments and systems
S7.1 No probable solution Complies
Part 14 – Assessment Criteria – Codes (The Noosa Plan) Page 27 of 28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.