Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Development Application - Part 2 of 2 - Plans

of 4

Page text read automatically using OCR, there may be inaccuracies

~

~                                                                                                                                                                                                                                            SEDIMENT CONTROL LEGEND:
         ~               I                                                                                               1-00
                                                                                                                                                                                                                                                                                                  ,
                                                                                                                                                                                                                                                                                                                                                        Callaghan & Toth
                                                NOOSA NORTH SHORE                                                                                                                                                                                            PROVIDE 25mm CRUSHED STONE ROCK SAND BAG WEIRS
~-,.                                                                                                                        ~                     .....                                                                                        ~                                                                                                                    Civil, Environmental &
                                                                                                                                                                                                                                                             100mm HIGH TO TABLE DRAINS WITH VEE IN CREST
~! \
-.....


’(           ~I      \
                                                                                                                                ~~~
                                                                                                                                            a".
                                                                                                                                            ~~                                                                                              ~ ERECT
                                                                                                                                                                                                                                                             TO SD5-4 AS NOTED



                                                                                                                                                                                                                                                                    SEDIMENT FENCE TO DETAIL 5D6-8
                                                                                                                                                                                                                                                                                                                                                        ~   I
                                                                                                                                                                                                                                                                                                                                                                    Hydraulic Engineers
                                                                                                                                                                                                                                                                                                                                                                                    PO BOX 2305
                                                                                                                                                                                                                                                                                                                                                                               NOOSA HEADS 4567
                                                                                                                                                                                                                                                                                                                                                                        6/41 Sunshine Beach Rood
~,tl                     \                                                                                                                                                                                                                    IIIIIIII       TOPSOIL & FERTIUSE & PROVIDE TURF STRIPS 1 m WIDE
                                                                                                                                                                                                                                                                                                                                                                    Phone 54749061. Fox 54749041
                                                                                                                                                                                                                                                                                                                                                                          www.colloghonondtoth.com.ou
 ~--.........
                                                                                                                                                                                                                                                             ALONG EDGE OF NEW DRIVEWAY                                                                               datum AHD DERIVED
\.~ 1"                                      .
I\..,"’’’~.\;
I--~""
                  ....
                         ~\                                                                                                                                                                                                                    @            GEOTEXTlLE SAUSAGE INLET FILTER TO STD OWG SO 6-11                                                        Origin (B.M.) RL’
                                                                                                                                                                                                                                                                                                                                                                                        PSM


                   .,)
                   "J,                          "                                                                                                                                                                                                                                                                                      opproved
                                                                                                                                                                                                                                             SEDIMENT FENCE SECTION
              ~~:--=--                                                --
                                                                                                                                                                                                                                             Place on the toe of 011 fill batters
                                                                                                                                                                                                                                                                                                                                       SURVEYED BY
                                                                                                                                                                                                                                                                                                                                        t.WC WATTERSON a: ~TES
..::- ___..1..!. f\.~,l~’--~ ."’!,.
                                                                                                                                                                                                                                             where shown or directed by the Engineer,                                                   PHONE 54 426 121
                                                               -
                                                                         1                                                                                                                                                                   These fences ore not to be used
                                                                                                                                                                                                                                             for concentrated flows with catchments
                               SITE LOCATION N.T.S
                                                                                                                                                                                                                                             greater than 2000 sq. m,                                                                   project

                                     STRAINER WIRE                                                                                                                                                                                                                                                                                      ACCESS DRIVEWAY TO 1, 3 ct 5
                                     TOP & BonOM                                                                                                                                                                                                                                                                                        NOOSA RIVER DRIVE. NOOSA
                                          FILTER FABRIC FIXED TO FENCE                                                                                                                                                                                  PLAN INDEX
                                                                                                                                                                                                                                                                                                                                        NORTH SHORE
                                          AND EMBEDDED INTO                              L T 5
 0.5                                      GROUND MIN. 200mm
                                                                                         Rr47488                     /                                                                                                                                  1213-01     SITE & SEDIMENT & EROSION CONTROL PLAN
                                          PROVIDE OVERFLOW WEIR 0.5 WIDE                                            /
                             ~
                                                                                                                 /
                                                                                                                                                                                                                                                        1213-02     DRIVEWAY DETAIL PLAN
                             .r.!:Q.!!_   WHERE BACKUP FLOW IS                                                  /                                                                                                                                       1213-03     DRNEWAY LONGITUDINAL & CROSS SECTION PLAN                         Client
                                          LIKELY TO OVER TOP WEIR                                            /
                                                                                                           ,/

 0.3                                                                                                   ,/’                                                                                                                                                                                                                              JOHN & JUUE GlENNON
                                                                                                                                                                                                                                                        STANDARD DRAWINGS
                                                                                                    /
                                          STAR PICKET
                                                                                                   /
                                                                                                   /                                                                                                                                                    5D5-4 ROCK CHECK DAMS


    SEDIMENT FENCE DETAIL
                                                                                            ///                                                                                                                                                         SD6-8 SEDIMENT FENCE
                                                                                                                                                                                                                                                        SD6-14 STABILlSED SITE ACCESS
                                                                                                                                                                                                                                                                                                                                     title

                                                                                          /                                                                                                                                                                                                                                             SfTE & SEDIMENT & EROSION
                                                                                                                                                                                                                                                                                                                                        CONTROL PLAN
         NOTES
Check & repair structures after every storm.
                                                                                 /                 LOT 4
                                                                                                   RP47488                                                                                                                                             ALEXANDER DAVID TOTH
Remove sediment fence only alter
new gross is established.
                                                                             //                                                                                                                                                                             REGISTERED PROFESSIONA                                                 LOT 1 & 3 on CP807560
                                                                                                                                                                                                                                                              ENGINEER OLD No, 6069                                                LOT 2 on RP46057
                                                                    /                                                                                                                                                                                  ................d...
                                                                                                                                                                                                                                                                                  ~
                                                                                                                                                                                                                                                                                    ."..   ..
                                                                                                                                                                                                                                                                                                                                   Parish of LAGUNA
                                                                                                                            LOT 2                                                                                                                                    PHONE 547
                                                                                                                                                                                                                                                                                                                                    unty of MARCH
                                                                                                                            1076m’                                                                                                                                                                                                SUNSHINE COAST COUNCIL
                                                                         .~                                                                                                                                                                                                                                                       Locality .of NOOSA NORTH SHORE
                                                                                                                                                                                                                                                        SEDIMENT & EROSION CONTROL CHECK LIST

                                                                              ’\~       "...
                                                                                                                                                                                                                                   ISSUE

                                                                                                                                                                                                                                  OBJECTIVE I TARGET
                                                                                                                                                                                                                                                              MANAGEMENT COMMITMENT

                                                                                                                                                                                                                                                               Comply with 011 statutory regulations and maintain                           SCALE
                                                                                           .....                                                                                                                                                                            ’




                                                                                                                                                                                                                                                               them during orthworks/construction.
                                                                                                                                                                                                                                                               Comply with the erosion and sediment control plan,                            2.5    5   7.5         10 1.2,5            Yele<s     25
         II                                                                                                                                                                                                                                                                                                                                 scale           SCALE SHOWN IS ORIGlAA. ’DRAWING SCALE
         N                                                                                                                                                                                                 #                      MANAGEMENT STRATEGY          Site foreman to identify and check direction of storm water
                                                                                                                                                                                                                                                                                                                                      1:500(A3)         00 NOT SCAlE FROM THS DRAWING
                                                                                                                                                                                                                                                                                                                                                            US{ ONLY IltIIENSlONS PRCMOED
                                                                                                                                                                                                                                                               land flows os shown on pion, Provide barriers and other
                                                                                                                                                                                                     g
         "                                                                                                                                                                                      J.......
                                                                                                                                                                                                                                                               measures shown on the plan to intercept storm water flows
                                                                                                                                                                                                                                                               at the end of table drains. and intercept sediments
                                                                                                                                                                                                                                                                                                                                        REVISIONS
                                                                                                                                                                                                                                                               before reaching gullies,
                                                                                                                                                                                              Q5
                                                                                         4’00                                                                                                                                                                                                                                    ’liliiii    revision details                                    dole
                                                                                               ~                                                                                                                                                                                                                                  ...        .

                                                                                                                                                                                                                                 TASKS I ACTIONS              Ereel sedimentation barriers as shown
                                                                                                   ~~                                                                                                                                                         before
                                                                                                                                                                                                                                                                                                    on the plans

                                                                                                                                                                                                                                                                       commencing earthworks or drainage improvements.
                                                                                                                                                                                                                                                              Place rock weirs in table drains as soon os the drains



                                                                                                                                             11
                                                                                                                                            ij                                                                                   PERFORMANCE INDICATORS
                                                                                                                                                                                                                                                              ore cut.


                                                                                                                                                                                                                                                              Site foreman to check that sediment fence and rock weirs
                                                                                                                                                                                                                                                              ore  tropping the flows after rain. Ensure no bypass occurs,              FILES
SEDIMENT & EROSION
CONTROL
Sedimentation Controls shall comply with
the requirements of,
                                                                                                                                <  \J7
                                                                                                                                 ’.".....
                                                                                                                                                                                                                                 FREOUENCY I DEADLINE         Site foreman sholl monitor performance and repair
                                                                                                                                                                                                                                                                                                                        damage
                                                                                                                                                                                                                                                              after every storm until gross is established, Sediment sholl
                                                                                                                                                                                                                                                              be removed before it reaches overflow level.
                                                                                                                                                                                                                                                                                                                                        COMPUTER DIRECTORY
                                                                                                                                                                                                                                                                                                                                 X:\JOBS\CT\..


"MANUAL FOR EROSION AND SEDIMENT                                                                                                                                                                                                 RESPONSIBLE PERSON           The Principal Contractors foreman shall be                                           FOR APPROVAL
CONTROL, MAROOCHY SHIRE COUNCIL"                                                                                                                                                                                                                              responsible for inspections,
(MESC,2007) which can be accessed on the                                                                                   SERVICE LOCATIONS
Councils external internet site.


Work.s Standards refer to,

"Contract Standards for Erosion and
                                                                              egex
                                                                    NOTE: ENERGEX LOCATIONS ARE APPROXIMATE ONLY FROM
                                                                                                                           It is the responsibility of the Foreman to
                                                                                                                           contact the relevant service authorities to
                                                                                                                           ascertain the exact location of services prior
                                                                                                                           to construction.
                                                                                                                                                                                           Ihe Is tra
                                                                                                                                                                                           .. AUSTRALIA
                                                                                                                                                                            NOTE: TELSTRA LOCATIONS ARE APPROXIMATE ONLY FROM
                                                                                                                                                                                  TELSTRA PlANS. LOCATIONS ARE TO BE CONFIRMEO
                                                                                                                                                                                                                                 REPORTING I REVIEW



                                                                                                                                                                                                                                 CORRECTIVE ACTIONS
                                                                                                                                                                                                                                                              Site Foremon to advise workers: if they notice
                                                                                                                                                                                                                                                              barrier requiring   repair, report it to foreman.

                                                                                                                                                                                                                                                              Site foreman is to repair any damaged barriers
                                                                                                                                                                                                                                                                                                                  any
                                                                                                                                                                                                                                                                                                                                                    Sheet       1

                                                                                                                                                                                                                                                                                                                                                    drawing number

                                                                                                                                                                                                                                                                                                                                                   1213-01
                                                                                                                                                                                                                                                                                                                                                                     of    3   sheets




                                                                          ENERGEX PLANS. LOCATIONS ARE TO BE CONFIRM EO                                                           PRIOR TO START OF CONSTRUCTION. PHONE DBYO
                                                                                                                                                                                                                                                              doily. Replacements ore to be purchased os required,                                                                 .
 Sediment Control on Construction Sites,"                                 PRIOR TO START OF CONSTRUCTION. PHONE DBYD                                                              SERVICE LOCATIONS ON 1100 FOR DETAILS.
                                                                          SERVICE LOCATIONS ON 1100 FOR DETAILS.
                                                                                                                                                                                                                                                                                                                                                     dote       19th MARCH 2012


[OCR of page images]
 

 

 

7 IMENT CONTROL LEGEND: ( Callaghan & Toth )

    

 

 

 

 

 

 

 

 

XN ag ‘
NOOSA NORTH SHORE % : @ PROVIDE 25mm CRUSHED STONE ROCK SAND BAG WEIRS ., | Civil, Environmental &
. 100mm HIGH TO TABLE DRAINS WITH VEE IN CREST : i
"hp * TO SD5~4 AS NOTED i | Hydraulic Engineers
“ X 2305
Pi - . hi NOOSA HEADS 4567
mm_—s ERECT SEDIMENT FENCE TO DETAIL SD6-8 M Vv 6/41 Sunshine Beach Rood
ad, Phone 54749081, Fox 54749041
SHHHH+H TOPSOIL. & FERTILISE & PROVIDE TURF STRIPS 1m WIDE se. caloghonanyttoth.comou
ALONG EDGE OF NEW DRIVEWAY designed [ADT] datum AHD DERIVED
drawn MM PSM *
Origin (BM.
8 GEOTEXTILE SAUSAGE INLET FILTER TO STD DNG SD 6-11 checked fA | Origin (BM) _RL*
‘approved
SEDIMENT FENCE SECTION TSORVEYED
Place on the toe of all fill batters MAX WATTERSON & ASSOCIATES

where shown or directed by the Engineer, PHONE 54 426 121

These fences are not to be used ———
for concentrated flows with catchments vtifacl
greater than 2000 sq. m. pro}

ACCESS DRIVEWAY TO 1, 3 & 5

SIT! ATION_N.T.

 

STRAINER WIRE
> RO & sono piiet mabex Nor, ee NE, MOOG
FILTER FABRIC FIXED TO FENCE PLAN INDEX ORE
0.5 GROUND IN 00mm 1213-01 * SITE & SEDIMENT & EROSION CONTROL PLAN Nepean
he |
PROVIDE OVERFLOW WEIR 0.5 WIDE 1213-02 * DRIVEWAY DETAIL PLAN

—/ 1213-03 * DRIVEWAY LONGITUDINAL & CROSS SECTION PLAN Client

JOHN & JULIE GLENNON

STANDARD_DRAWINGS

o2] FLOW WHERE BACKUP FLOW IS
P i LIKELY TO OVER TOP WEIR

 

0.3

 

le——-——- STAR PICKET

 

+ SD5=4 ROCK CHECK DAMS ———
SD6~8 SEDIMENT FENCE ttle
SD6~14 STABILISED SITE ACCESS SITE & SEDIMENT & EROSION
SEDIMENT FENCE DETAIL ene

 

 
  

         

NOTES Lo LOT 4 : H
heck & repoir structures aft storm, / 2P47 488 $ ALEXANDER DAVID TOT!
one eee fee oy ae F RPT ASHOUSE TOY REGISTERED PROFESSIONAL“
new grass is established, f 4 v ENGINEER QLD No. 6069.

     

 

 

 

‘ EDIMENT.
\ ISSUE MANAGEMENT COMMITMENT
\ OBJECTIVE / TARGET Comply with all statutory regulations and maintain

  
   

   
   

them during earthworks/construction.

Comply with the erosion and sediment control plan. 0.25 5 7:5 10 125 Meters 25
LSS

 

Scale SCALE. SHOWN IS ORIGINAL DRAWING SCALE
1:500(A3)  90.NOT SCALE FROM THIS DRAWING
USE ONLY DIMENSIONS PROVIDED

   

 

MANAGEMENT STRATEGY Site foreman to identify and check direction of storm water
lond flows as shown on plan, Provide borriers and other
Measures shown on the plan to intercept storm water flows
at the end of table drains, and intercept sediments

before reaching gullies,

    
 

 

TASKS / ACTIONS Erect sedimentation barriers as shown on the plans
before commencing earthworks or drainage improvements.
Place rock weirs in table drains as soon as the drains
are cut.

 

PERFORMANCE INDICATORS Site foreman to check that sediment fence ond rock weirs
are trapping the flows after rain. Ensure no bypass occurs. FILES

COMPUTER DIRECTORY
CONTROL FREQUENCY / DEADLINE Site foreman shall monitor performance and repoir damage K\JOBS\CT\,..
Pe eee after every storm until grass is. established. Sediment shall '

Sedimentation Controls shall comply with } be removed before it reaches overflow level.
the requirements of,
RESPONSIBLE PERSON The Principal Contractors foreman shall be FOR AP P ROVAL

 

 

 

 

SEDIMENT & EROSION

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

"MANUAL FOR EROSION AND SEDIMENT recpousitle for insrtotions
CONTROL, MAROOCHY SHIRE COUNCIL" SERVICE LOCATIONS e ‘
(MESC, 2007) which oan be accessed on the el t REPORTING / REVIEW Site Foreman to advise workers: if they notice ony Sheet _1_of _3_ sheets
Councils external internet site. It is the responsibility of the Foreman to “es barrier requiring repair, report it to foreman. drawing number
eneraqex contact the relevant service authorities to
Works Standards refer to, Lore: ENERGEK LocaTione: ane pa oney From | oScertain the exact location of services prior |NOTE: TELSTRA LOCATIONS ARE APPROXIMATE ONLY FROM 1 COpprCTVE ACTIONS Site foreman is to repair any damaged borriers 1213 01
"Contract Standards for Erosion and  ENERGEX PLANS. LOCATIONS ARE 10 BE CONFIRMED | {0 construction. PRIOR TO START OF CONSTRUCTION. PHONE DBYD daily. Replacements ore to be purchased os required.
i ion Sites." PRIOR TO START OF CONSTRUCTION, PHONE DBYD SERVICE LOCATIONS ON 1100 FOR DETAILS.
Sediment Control on Construction Sites. SERVICE. LOCATIONS ON 1100 FOR DETALS Ke. date 19th MARCH 2012 of

 

 

 

 

Log in to download the original (Development Application - Part 2 of 2 - Plans.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.