~ SEDIMENT CONTROL LEGEND:
~ I 1-00
,
Callaghan & Toth
NOOSA NORTH SHORE PROVIDE 25mm CRUSHED STONE ROCK SAND BAG WEIRS
~-,. ~ ..... ~ Civil, Environmental &
100mm HIGH TO TABLE DRAINS WITH VEE IN CREST
~! \
-.....
’( ~I \
~~~
a".
~~ ~ ERECT
TO SD5-4 AS NOTED
SEDIMENT FENCE TO DETAIL 5D6-8
~ I
Hydraulic Engineers
PO BOX 2305
NOOSA HEADS 4567
6/41 Sunshine Beach Rood
~,tl \ IIIIIIII TOPSOIL & FERTIUSE & PROVIDE TURF STRIPS 1 m WIDE
Phone 54749061. Fox 54749041
www.colloghonondtoth.com.ou
~--.........
ALONG EDGE OF NEW DRIVEWAY datum AHD DERIVED
\.~ 1" .
I\..,"’’’~.\;
I--~""
....
~\ @ GEOTEXTlLE SAUSAGE INLET FILTER TO STD OWG SO 6-11 Origin (B.M.) RL’
PSM
.,)
"J, " opproved
SEDIMENT FENCE SECTION
~~:--=-- --
Place on the toe of 011 fill batters
SURVEYED BY
t.WC WATTERSON a: ~TES
..::- ___..1..!. f\.~,l~’--~ ."’!,.
where shown or directed by the Engineer, PHONE 54 426 121
-
1 These fences ore not to be used
for concentrated flows with catchments
SITE LOCATION N.T.S
greater than 2000 sq. m, project
STRAINER WIRE ACCESS DRIVEWAY TO 1, 3 ct 5
TOP & BonOM NOOSA RIVER DRIVE. NOOSA
FILTER FABRIC FIXED TO FENCE PLAN INDEX
NORTH SHORE
AND EMBEDDED INTO L T 5
0.5 GROUND MIN. 200mm
Rr47488 / 1213-01 SITE & SEDIMENT & EROSION CONTROL PLAN
PROVIDE OVERFLOW WEIR 0.5 WIDE /
~
/
1213-02 DRIVEWAY DETAIL PLAN
.r.!:Q.!!_ WHERE BACKUP FLOW IS / 1213-03 DRNEWAY LONGITUDINAL & CROSS SECTION PLAN Client
LIKELY TO OVER TOP WEIR /
,/
0.3 ,/’ JOHN & JUUE GlENNON
STANDARD DRAWINGS
/
STAR PICKET
/
/ 5D5-4 ROCK CHECK DAMS
SEDIMENT FENCE DETAIL
/// SD6-8 SEDIMENT FENCE
SD6-14 STABILlSED SITE ACCESS
title
/ SfTE & SEDIMENT & EROSION
CONTROL PLAN
NOTES
Check & repair structures after every storm.
/ LOT 4
RP47488 ALEXANDER DAVID TOTH
Remove sediment fence only alter
new gross is established.
// REGISTERED PROFESSIONA LOT 1 & 3 on CP807560
ENGINEER OLD No, 6069 LOT 2 on RP46057
/ ................d...
~
.".. ..
Parish of LAGUNA
LOT 2 PHONE 547
unty of MARCH
1076m’ SUNSHINE COAST COUNCIL
.~ Locality .of NOOSA NORTH SHORE
SEDIMENT & EROSION CONTROL CHECK LIST
’\~ "...
ISSUE
OBJECTIVE I TARGET
MANAGEMENT COMMITMENT
Comply with 011 statutory regulations and maintain SCALE
..... ’
them during orthworks/construction.
Comply with the erosion and sediment control plan, 2.5 5 7.5 10 1.2,5 Yele<s 25
II scale SCALE SHOWN IS ORIGlAA. ’DRAWING SCALE
N # MANAGEMENT STRATEGY Site foreman to identify and check direction of storm water
1:500(A3) 00 NOT SCAlE FROM THS DRAWING
US{ ONLY IltIIENSlONS PRCMOED
land flows os shown on pion, Provide barriers and other
g
" J.......
measures shown on the plan to intercept storm water flows
at the end of table drains. and intercept sediments
REVISIONS
before reaching gullies,
Q5
4’00 ’liliiii revision details dole
~ ... .
TASKS I ACTIONS Ereel sedimentation barriers as shown
~~ before
on the plans
commencing earthworks or drainage improvements.
Place rock weirs in table drains as soon os the drains
11
ij PERFORMANCE INDICATORS
ore cut.
Site foreman to check that sediment fence and rock weirs
ore tropping the flows after rain. Ensure no bypass occurs, FILES
SEDIMENT & EROSION
CONTROL
Sedimentation Controls shall comply with
the requirements of,
< \J7
’.".....
FREOUENCY I DEADLINE Site foreman sholl monitor performance and repair
damage
after every storm until gross is established, Sediment sholl
be removed before it reaches overflow level.
COMPUTER DIRECTORY
X:\JOBS\CT\..
"MANUAL FOR EROSION AND SEDIMENT RESPONSIBLE PERSON The Principal Contractors foreman shall be FOR APPROVAL
CONTROL, MAROOCHY SHIRE COUNCIL" responsible for inspections,
(MESC,2007) which can be accessed on the SERVICE LOCATIONS
Councils external internet site.
Work.s Standards refer to,
"Contract Standards for Erosion and
egex
NOTE: ENERGEX LOCATIONS ARE APPROXIMATE ONLY FROM
It is the responsibility of the Foreman to
contact the relevant service authorities to
ascertain the exact location of services prior
to construction.
Ihe Is tra
.. AUSTRALIA
NOTE: TELSTRA LOCATIONS ARE APPROXIMATE ONLY FROM
TELSTRA PlANS. LOCATIONS ARE TO BE CONFIRMEO
REPORTING I REVIEW
CORRECTIVE ACTIONS
Site Foremon to advise workers: if they notice
barrier requiring repair, report it to foreman.
Site foreman is to repair any damaged barriers
any
Sheet 1
drawing number
1213-01
of 3 sheets
ENERGEX PLANS. LOCATIONS ARE TO BE CONFIRM EO PRIOR TO START OF CONSTRUCTION. PHONE DBYO
doily. Replacements ore to be purchased os required, .
Sediment Control on Construction Sites," PRIOR TO START OF CONSTRUCTION. PHONE DBYD SERVICE LOCATIONS ON 1100 FOR DETAILS.
SERVICE LOCATIONS ON 1100 FOR DETAILS.
dote 19th MARCH 2012
[OCR of page images]
7 IMENT CONTROL LEGEND: ( Callaghan & Toth )
XN ag ‘
NOOSA NORTH SHORE % : @ PROVIDE 25mm CRUSHED STONE ROCK SAND BAG WEIRS ., | Civil, Environmental &
. 100mm HIGH TO TABLE DRAINS WITH VEE IN CREST : i
"hp * TO SD5~4 AS NOTED i | Hydraulic Engineers
“ X 2305
Pi - . hi NOOSA HEADS 4567
mm_—s ERECT SEDIMENT FENCE TO DETAIL SD6-8 M Vv 6/41 Sunshine Beach Rood
ad, Phone 54749081, Fox 54749041
SHHHH+H TOPSOIL. & FERTILISE & PROVIDE TURF STRIPS 1m WIDE se. caloghonanyttoth.comou
ALONG EDGE OF NEW DRIVEWAY designed [ADT] datum AHD DERIVED
drawn MM PSM *
Origin (BM.
8 GEOTEXTILE SAUSAGE INLET FILTER TO STD DNG SD 6-11 checked fA | Origin (BM) _RL*
‘approved
SEDIMENT FENCE SECTION TSORVEYED
Place on the toe of all fill batters MAX WATTERSON & ASSOCIATES
where shown or directed by the Engineer, PHONE 54 426 121
These fences are not to be used ———
for concentrated flows with catchments vtifacl
greater than 2000 sq. m. pro}
ACCESS DRIVEWAY TO 1, 3 & 5
SIT! ATION_N.T.
STRAINER WIRE
> RO & sono piiet mabex Nor, ee NE, MOOG
FILTER FABRIC FIXED TO FENCE PLAN INDEX ORE
0.5 GROUND IN 00mm 1213-01 * SITE & SEDIMENT & EROSION CONTROL PLAN Nepean
he |
PROVIDE OVERFLOW WEIR 0.5 WIDE 1213-02 * DRIVEWAY DETAIL PLAN
—/ 1213-03 * DRIVEWAY LONGITUDINAL & CROSS SECTION PLAN Client
JOHN & JULIE GLENNON
STANDARD_DRAWINGS
o2] FLOW WHERE BACKUP FLOW IS
P i LIKELY TO OVER TOP WEIR
0.3
le——-——- STAR PICKET
+ SD5=4 ROCK CHECK DAMS ———
SD6~8 SEDIMENT FENCE ttle
SD6~14 STABILISED SITE ACCESS SITE & SEDIMENT & EROSION
SEDIMENT FENCE DETAIL ene
NOTES Lo LOT 4 : H
heck & repoir structures aft storm, / 2P47 488 $ ALEXANDER DAVID TOT!
one eee fee oy ae F RPT ASHOUSE TOY REGISTERED PROFESSIONAL“
new grass is established, f 4 v ENGINEER QLD No. 6069.
‘ EDIMENT.
\ ISSUE MANAGEMENT COMMITMENT
\ OBJECTIVE / TARGET Comply with all statutory regulations and maintain
them during earthworks/construction.
Comply with the erosion and sediment control plan. 0.25 5 7:5 10 125 Meters 25
LSS
Scale SCALE. SHOWN IS ORIGINAL DRAWING SCALE
1:500(A3) 90.NOT SCALE FROM THIS DRAWING
USE ONLY DIMENSIONS PROVIDED
MANAGEMENT STRATEGY Site foreman to identify and check direction of storm water
lond flows as shown on plan, Provide borriers and other
Measures shown on the plan to intercept storm water flows
at the end of table drains, and intercept sediments
before reaching gullies,
TASKS / ACTIONS Erect sedimentation barriers as shown on the plans
before commencing earthworks or drainage improvements.
Place rock weirs in table drains as soon as the drains
are cut.
PERFORMANCE INDICATORS Site foreman to check that sediment fence ond rock weirs
are trapping the flows after rain. Ensure no bypass occurs. FILES
COMPUTER DIRECTORY
CONTROL FREQUENCY / DEADLINE Site foreman shall monitor performance and repoir damage K\JOBS\CT\,..
Pe eee after every storm until grass is. established. Sediment shall '
Sedimentation Controls shall comply with } be removed before it reaches overflow level.
the requirements of,
RESPONSIBLE PERSON The Principal Contractors foreman shall be FOR AP P ROVAL
SEDIMENT & EROSION
"MANUAL FOR EROSION AND SEDIMENT recpousitle for insrtotions
CONTROL, MAROOCHY SHIRE COUNCIL" SERVICE LOCATIONS e ‘
(MESC, 2007) which oan be accessed on the el t REPORTING / REVIEW Site Foreman to advise workers: if they notice ony Sheet _1_of _3_ sheets
Councils external internet site. It is the responsibility of the Foreman to “es barrier requiring repair, report it to foreman. drawing number
eneraqex contact the relevant service authorities to
Works Standards refer to, Lore: ENERGEK LocaTione: ane pa oney From | oScertain the exact location of services prior |NOTE: TELSTRA LOCATIONS ARE APPROXIMATE ONLY FROM 1 COpprCTVE ACTIONS Site foreman is to repair any damaged borriers 1213 01
"Contract Standards for Erosion and ENERGEX PLANS. LOCATIONS ARE 10 BE CONFIRMED | {0 construction. PRIOR TO START OF CONSTRUCTION. PHONE DBYD daily. Replacements ore to be purchased os required.
i ion Sites." PRIOR TO START OF CONSTRUCTION, PHONE DBYD SERVICE LOCATIONS ON 1100 FOR DETAILS.
Sediment Control on Construction Sites. SERVICE. LOCATIONS ON 1100 FOR DETALS Ke. date 19th MARCH 2012 of
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Development Application - Part 2 of 2 - Plans.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.