SPECIAL MEETING AGENDA 13 OCTOBER 2017
Given this project will cover a number of future years, Net Present Value Analysis (NPV) has been
used to compare the three scenarios and identify the likely total cost of the remediation component
of the project (in 2017 dollars). The table below provides a summary of the total cost of each
scenario in addition to the investment required per ratepayer to fund the project.
Note 1: Represents the total potential costs over the 5 year rehabilitation period.
Note 2: For modelling purposes, the additional contribution by NPA towards rehabilitation (up to $125,000 pa
for 5 years totalling $600,000 plus inflation) has been excluded. The payment of these funds by NPA
would reduce the above costs by the equivalent contribution over the 5-year period for each scenario.
Note 3: For modelling purposes, potential grant funds have been excluded. Any grant funds received would
reduce the above costs.
The detailed cashflows associated with the total project costs for each scenario are provided for
information in Attachment 6. A summary snapshot is outlined below.
Figure 1: Scenario Cashflows
$4,000,000
$3,500,000
$3,000,000
$2,500,000
$2,000,000
$1,500,000
$1,000,000
$500,000
$0
($500,000)
2018 2019 2020 2021 2022 2023 2024 2025 2026 2027
Basecase (Natural Regeneration) Assisted Regeneration Reconstruction
Page 16 of 48
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.