SPECIAL MEETING AGENDA 13 OCTOBER 2017
The degree to which we apply different mixes of these different rehabilitation treatments will be
determined when we adopt the Management Plan for the Conservation Parks. There are already
significant fallow areas in the PLA area showing substantial natural regeneration. Some of these
areas are at a one-year, three-year and seven-year fallow timeframe allowing identification of the
natural regeneration that can and has occurred.
To assist with consideration of the issue at this stage, we have modelled three different scenarios
in the financial analysis with each one showing the maximum cost over a five-year period. The
higher the intervention (e.g. reconstruction, the higher the cost). Conversely, the more natural
regeneration, the lower the cost.
9. The Way Forward - Approved Actions
If Council wishes to proceed with this project in principle, the following actions would be need to
be approved by Council:
Authorise the CEO to enter into a Memorandum of Understanding generally in accordance with
the terms of the draft MOU contained in Attachment 2 to the report to achieve the overall
project objectives;
Authorise the CEO to work with the other parties to develop the required transactional
documents and to report back to a future Council meeting with those transactional documents
for Council’s consideration;
Authorise the CEO to remove the confidentiality associated with this report and project once
the project has been publically announced by the Minister for the Environment.
10. Acknowledgments
I would like to acknowledge the following people and organisations who have made this project
possible to date. In relation to our Council staff, it should be noted that this work was undertaken
over and above their normal day to day roles.
Council Environment Officers - Their detailed analysis of the environmental attributes of the
relevant land have been invaluable. They have physically traversed the entire site and
analysed soil types, vegetation etc to determine the probable level of natural regeneration
required for the pine PLA lands. Our Principal Environment Officer has also visited the Bribie
Island former pine plantation areas to view and compare natural regeneration of that site.
Council’s Governance Advisor has provided important governance advice and support on this
project focusing on risk analysis and mitigation as well as liaison with legal advisors.
Council’s Executive Officer has assisted in project co-ordination, particularly in bringing the
project to fruition in recent weeks.
Noosa Parks Association have provided an important role in bringing this project and concept
to the other parties for consideration. They have successfully advocated for this project that
will have a long term benefit to the environment estate in the Noosa Shire.
HQP have evidenced very strong corporate responsibility in line with their adopted corporate
values and their adopted Forest Stewardship Certification program. They have been willing to
engage and consider this project recognising the benefits to the Noosa environment while also
ensuring that the rights of their shareholders were respected.
State Agencies – There has been excellent co-operation and support from senior bureaucrats
in a number of state agencies and in particular, E&HP and NPS&R.
Page 19 of 48
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.