2017-10-13 Special Meeting
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
SPECIAL MEETING AGENDA 13 OCTOBER 2017
3.5. Apiary Licences
There are approximately a dozen apiary licences in the area. These provide licence holders with
the right to enter and conduct bee keeping activities on the site. The apiary licences are not
intended to be affected by this project and will be maintained.
4. The Proposal “in principle”
After months of negotiations and consideration of different scenarios, the parties have reached "in
principle" agreement on the following:
4.1. Surrender of the PLA
HQP will surrender its PLA to the State within 5 years of the signing of the formal agreement.
HQP will receive compensation of $3.5M payable at the signing of the agreement for its
surrender of the PLA.
HQP will finalise its harvesting and removal of all pine located on the PLA area within that 5-
year period.
HQP has also agreed to forgo any rights it has in relation to the hardwood forests within its
PLA upon the signing of a formal agreement i.e. all existing hardwood areas in the PLA will
be protected from any logging.
HQP also has agreed to finalise its harvesting of its pine plantation using the "Guidelines For
The Management Of Conservation Handback Plantations, 2010” to ensure that the
opportunities for natural regeneration are maximised. This will be subject to their operational
requirements such as Workplace Health and Safety. A copy of this document has been
provided in the Councillors Room by way of background.
To facilitate the matters above, HQP will enter into a legally binding variation to their current
PLA agreement with DAF. Their current PLA agreement covers all of their PLA holdings
across the State and a legal agreement between DAF and HQP will vary that current
commercial agreement.
4.2. Funding Acquisition Costs
E&HP, Council and NPA will jointly fund the $3.5M cost of HQP surrendering their PLA in
equal shares i.e. the E&HP will fund one-third, Council will fund one-third and NPA will fund
one-third.
To minimise the risk to Council, E&HP will pay the full amount of $3.5M up front and the
remaining two-thirds will be paid into an interest bearing account held by E&HP (probably to
be held by QTC).
E&HP cannot draw down that two-thirds of the funding until two events occur:
(i) the State Forest Land (non PLA land) is substantially Gazetted into National Park (more
than 90% of that land is expected to be gazetted into National Park within the next year
or so with the balance being gazetted after 5 years); and
(ii) Council is made trustee of a Conservation Park for the PLA land (expected to occur
shortly after 5 years when HQP surrender their PLA). Further details on the tenure
pathways are set out below.
Interest on the funds held will be allocated by the State towards Koala protection projects in
Noosa Shire and the State is required to consult with the Council on potential projects.
Details on the funding contribution and timing of payments by NPA for their contribution are
set out below.
Page 7 of 48
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.