24-0285 Civil Issue C

of 11

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 9, section 1. The text section number identifies this passage in the reader.

     LEGEND:
                                                    CONSTRUCTION ENTRY/EXIT
      ENTRY
       EXIT



        SB                                          SEDIMENT BARRIER OR GEOSOCK                                             N




                                                                                                                                                                   /
                      3.5                           FINISHED CONTOURS
                                                    ROAD PAVEMENT                                                                                                                 /




                                                                                                                                                                            0
                                                                                                                                                                            41.
                                                                                                                                                               /
                                                                                                                                                                                           /
                  /                 /               SEDIMENT FENCE
              /                 /           /                                                                                                                                                               /




                                                                                                                                                                                               5
                                                                                                                                                           /
                                                    TOPSOIL BUND / STOCKPILE




                                                                                                                                                                                               40.
    /




          /                 /           /                                                                                                                                                                                  /

                                                                                                                                                                                                                                           /




                                                                                                                                                       /
                                                                                                                                                                                                                                                        /
                                                    DIRECTION OF FLOW MINOR/MAJOR




                                                                                                                                                                                                                                          0
                                                                                                                                                                                                                                                            /




                                                                                                                                                                                                                                      40.
                                                                                                                                                           41.5
                                                                                                                                                                                                                                                                      /
                                                                                                                                                                                                                                                                          /




                                                                                                                                                   /
                                                                                                                                                                                                                                                                                  /
    EROSION AND SEDIMENT CONTROL NOTES:                                                                                                                                                                                                                                               /
                                                                                                                                                                                                                                                                                                /
    THE SITE IS TO BE MANAGED AND STAGED TO KEEP THE EROSION RISK POTENTIAL AS LOW AS PRACTICAL AT ALL TIMES. IT IS THE




                                                                                                                                               /
    CONTRACTORS RESPONSIBILITY TO ENSURE THAT THE GENERAL ENVIRONMENTAL DUTY, AS DEFINED IN THE ACT, IS OBSERVED FOR THE                                                                                                                                                                            /
                                                                                                                                                                                                                                                                                                                   /
    DURATION OF THE WORKS.
                                                                                                                                                                                                                                                                                                                       /
    GENERAL REQUIREMENTS:




                                                                                                                                           /
                                                                                                                                                                                                                                                                                                                                  /
    ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSTALLED IN ACCORDANCE WITH I.E. AUST. SOIL EROSION AND SEDIMENT CONTROL
    MANUAL, NSC MANUAL FOR EROSION AND SEDIMENT CONTROL, IECA BEST PRACTICE EROSION AND SEDIMENT CONTROL AS DETAILED ON THIS
                                                                                                                                                                                                                                                                                                                                               /
    PLAN, OR AS REQUIRED FOR COMPLIANCE WITH THE REQUIREMENTS OF THE ENVIRONMENTAL MANAGEMENT PLAN.




                                                                                                                                       /
      1. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING EROSION AND SEDIMENT CONTROL DEVICES ARE INSPECTED AND MAINTAINED AS
                                                                                                                                                                                                                                                                                                                                                             /
          FOLLOWS:
           A.      DAILY CONSTRUCTION                                                                                                                                                                                                                                                                                                                                      /




                                                                                                                                   /
             (I) DAILY DURING DRY WEATHER
             (II) PRIOR TO PREDICTED STORM EVENTS                                                                                                                                                                                                                                                                                                                                        /
             (III) TWICE DAILY DURING PROLONGED RAIN
                                                                                                                                                                                                                                                                                                                                                                                                             /
             (IV) DURING AND AFTER MAJOR STORM EVENTS
          B.       DURING DEFECTS LIABILITY PERIOD                                                                                                                                                                                                                                                                                                                                                                         /
             (I) WEEKLY DURING DRY WEATHER
             (II) PRIOR TO PREDICTED STORM EVENTS




                                                                                                                                               41.5
             (III) TWICE WEEKLY DURING PROLONGED RAIN                                                                                                                                                                                                                                                                                                                                                                                               /
             (IV) DURING AND AFTER MAJOR STORM EVENTS                                                                                                                                                                                                                                                                                                                                  SB                                                                             /




                                                                                                                                                                                                                                                                                                                                                                                                                 37.5
      2. EROSION AND SEDIMENT CONTROL DEVICES ON THESE PLANS ARE INDICATIVE ONLY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO




                                                                                                                                                                                                                                                                                                                                                                                                                                     37.0
          ENSURE THAT THE INTENT OF THESE PLANS AND THE ENVIRONMENTAL MANAGEMENT PLAN ARE COMPLIED WITH.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       SB




                                                                                                                                                                                                                                                                                                                                                                                                                                                             36.5
      3. STABILISED ACCESS (ENTRY AND EXITS), DRAINAGE AND EROSION AND SEDIMENT CONTROLS ARE TO BE INSTALLED PRIOR TO THE
          CLEARING AND GRUBBING AND CONSTRUCTION OF HAUL ROADS.




                                                                                                                                                                                                                                                                                                                                                                               0




                                                                                                                                                                                                                                                                                                                                                                                                                                                                            /
                                                                                                                                                                                                                                                                                                                                                                           38.
      4. ALL STORMWATER RUN OFF FROM ENTRY/EXIT LOCATIONS IS TO BE TREATED AS DIRTY WATER AND DIRECTED TO AN APPROPRIATE
          SEDIMENT CONTROL DEVICE.




                                                                                                                                                                       .0




                                                                                                                                                                                                                                                                                                                                                                                                                                                               /
                                                                                                                                                                       41
      5. DRAINAGE, EROSION AND SEDIMENT CONTROL DEVICES/STRATEGIES SHALL BE IMPLEMENTED PRIOR TO DISTURBANCE OF THE SITE, AND
          SHALL REMAIN IN PLACE UNTIL PERMANENT WORKS ARE COMPLETED AND CATCHMENT VEGETATION IS ESTABLISHED (80% GRASS
          COVER, MINIMUM).




                                                                                                                                                                                                                                                                                                                                                                                                                                                   /
      6. WHERE PRACTICAL, HIGH EROSION AND SEDIMENTATION RISK CONSTRUCTION WORKS, SUCH AS WORKS ADJACENT TO AND WITHIN
          OVERLAND FLOW PATHS, ARE TO BE SCHEDULED DURING LOW RISK PERIODS WITH MINIMAL PREDICTED RAINFALL.
                                                                                                                                                                                                                                                                                                                                                             ENTRY




                                                                                                                                                                                                                                                                                                                                                                                                                                                        36
      7. SEDIMENT DEPOSITS THAT OCCUR OFF-SITE, AS A RESULT OF THESE CONSTRUCTION WORKS ARE TO BE CLEANED UP AND




                                                                                                                                                                                                                                                                                                                                                                                                                                                          .5
                                                                                                                                                                                                                                                                                                                                                                                                                                       /
          REHABILITATED TO PRIOR CONDITION AS SOON AS POSSIBLE, FOLLOWING IDENTIFICATION OF PROBLEM. CORRECTIVE ACTION TO BE
                                                                                                                                                                                                                                                                                                                                                              EXIT




                                                                                                                                                                                      .5
                                                                                                                                                                                      40
          UNDERTAKEN AND RECORDED TO PREVENT RECURRENCE.
      8. SUFFICIENT STOCKPILES OF MULCH/JUTE MAT/FLOCCULANT/ SOIL BINDER MUST BE RETAINED ON SITE AT ALL TIMES TO ENABLE




                                                                                                                                                                                                                                                                                                                                                                                                                          /
          ONGOING EROSION AND SEDIMENT CONTROL.
                                                                                                                                                                                                       .0
      9. ALL EROSION AND SEDIMENT CONTROL DEVICES ARE TO BE MAINTAINED IN GOOD WORKING ORDER AT ALL TIMES. MAINTENANCE OF                                                                            40
          DEVICES IS TO CONTINUE UNTIL SITE IS STABILISED.
      10. LAND CLEARING AND VEGETATION SELECTED FOR REMOVAL IS TO BE UNDERTAKEN IN ACCORDANCE WITH THE RELEVANT APPROVALS




                                                                                                                                                                                                                                                                                                                                                                                      37.0
           AND MANAGEMENT PLANS.




                                                                                                                                                                                                                                                                                                    /
                                                                                                                                                                                                                                 .5
      11. SEDIMENT AND DRAINAGE CONTROL STRUCTURES ARE TO BE INSTALLED PRIOR TO VEGETATION CLEARING, WHERE POSSIBLE, IN ORDER                                                                                                  39




                                                                                                                                                                                                                                                                                                           /
          TO MINIMISE ANY SOIL LOSS AND IMPACTS TO SITE DRAINAGE FLOW PATHS.




                                                                                                                                                                                                                                                                                          /
      12. ONCE VEGETATION CLEARING HAS OCCURRED, STABILISATION MEASURES ARE REQUIRED PRIOR TO COMMENCING CONSTRUCTION                                                                                                                                                                                                                                                /
           ACTIVITIES.




                                                                                                                                                                                                                                                                                              /
                                                                                                                                                                                                                                                                              /
      13. STOCKPILES ARE TO BE POSITIONED AWAY FROM OVERLAND FLOW PATHS, POOR DRAINAGE AREAS OR OTHER LIKELY CONFLUENCES




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   T
                                                                                                                                                                                                                                                                                                                                                             37.5
          WHERE CONCENTRATED FLOW MAY CAUSE SEDIMENT TRANSPORTATION.                                                                                                                                                                                                                                                                                                                         37




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                EE
                                                                                                                                                                                                                                                                                                                                                                                                  .0




                                                                                                                                                                                                                                                                                  /
                                                                                                                                                                                                                                                                          /
      14. STOCKPILES ARE TO BE LOCATED UP GRADIENT OF AN APPROPRIATE SEDIMENT CONTROL DEVICE, WITH A CATCH DRAIN OR DIVERSION




                                                                                                                                                                                                                                                                                                                                                                                                                                                                           TR
                                                                                                                                                                                                                                                                                                                                                                         /
                                                                                                                                                                                                                                                                                                                                                0
          BUND INSTALLED UP GRADIENT TO REDUCE OVERLAND FLOW INTO THE STOCKPILE AREA.




                                                                                                                                                                                                                                                                                                                                             38.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                    NS
      15. STOCKPILED (FILL OR EXCAVATED) MATERIAL THAT WILL REMAIN ONSITE FOR LONGER THAN 10 DAYS IS TO BE COVERED AND BUNDED TO
                                                                                                                                                                                                                                                                                          SB




                                                                                                                                                                                                                                                                                                                             38.5
          PREVENT SEDIMENT LADEN WATER RUN-OFF.




                                                                                                                                                                                                                                                                                                                                                                                                                                                              SO
                                                                                                                                                                                                                                                                                                                                                             /
      16. IF WORKS ARE TO BE SUSPENDED IN AREAS THAT ARE NOT COMPLETE, THE EXPOSED AREAS ARE TO HAVE TEMPORARY COVERAGE




                                                                                                                                                                                                                                                                                                                                                                         37




                                                                                                                                                                                                                                                                                                                                                                                                                                                         ER
                                                                                                                                                                                                                                                                                                                                                                         .5
          (HYDROMULCH/SOILBINDER etc.) APPLIED TO REDUCE THE RISK OF EROSION DUE TO RAINFALL AND WIND.




                                                                                                                                                                                                                                                                                                                                                                                                                                                   ND
                                                                                                                                                                                                                                                                                                            39.0




                                                                                                                                                                                                                                                                                                                                                   /




                                                                                                                                                                                                                                                                                                                                                                                                                                              HE
                                                                                                                                                                                                                                                                                                                                        /

                                                                                                                                                                                                                                                                                                                                                   38
                                                                                                                                                                                                                                                                                                                                                     .0
                                                                                                                                                                                                                                                                                                                              /
                                                                                                                                                                                                                                                                                                          PLAN
                                                                                                                                                                                                                                                                                              SCALE A1 - 1 : 100
                                                                                                                                                                                                                                                                                                    A3 - 1 : 200


                                                                                                                                                                                                                 Issue   Made By      Date       Description
                                                                                                                                                                                                                                                                                                        PROPOSED RESIDENCE                                                                                                                                                                  Scale : AS SHOWN                  NOTES:
                                                                                                                                                                                                                   A     M.T.         06/09/24   For Operational Works Approval
                                                                                                                                                                                                      REVISION




0    1        2                     4           6          8         10m                                                                                                                                                                                                                                at No.3 HENDERSON STREET SUNSHINE BEACH
                                                                                                                                                                                                                   B     M.T.         11/09/24   For Operational Works Approval                                                                                                                                                                                                             Job No.: 24-0285                  1. Do not scale drawings.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              2. Scale is correct at A3.
                                                                                                                                                                                                                   C     M.T.         18/09/24   For Operational Works Approval                         Client: JMML INVESTMENTS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            Dwg No.: C08                      3. Check and verify all dimensions
SCALE 1:100                                                         @A1                                                                                                                                                                                                                                 Designed By : B.J. WINNING BEngTech (Civil), MEngPrac (Civil), MIEAust Drawn By : MT           Date : 30/08/24                                                                                                          prior to commencement of work.
                                                                                                                                                                                                                                                                                                        Certified By : B.R. CROMAR BEng(Civil), MEIAust, CPEng, RPEQ, NER                              Date : 30/08/24   Ph: (07) 5444 5578   Email: [email protected]         EROSION & SEDIMENT CONTROL PLAN
Log in to download the original file

24-0285 Civil Issue C.pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.