Original source · versioned page text
24-0285 Civil Issue C
Original PDF page 4, section 2. The text section number identifies this passage in the reader.
-1
.2
8
INTERSECTION DRIVEWAY
R
.0%
F.L.36.76
38.0
-1
ST
F.L.39.00 3
37
38.2
.4%
.4
38.4
ON
F.L.39.32
38.6
37
S
.6
S
F.L.39.31
38.8
ER
37
39.0
F.L.39.30
-4
.8
ND
39.2
.6
38.0
%
-1
HE
F.L.38.18
8
MATCHES EXISTING
.4%
-3
5.0
1.9
VERGE CROSSFALL
00
%
F.L.38.70 F.L.38.05 MATCH NEATLY TO
2.97
EXISTING PATH
5
1.05
VC LENGTH
0.00
5
RADIUS
0
GRADE -19.880% -15.267% -14.827% -5.967% -3.330% -9.571% -5.416% -3.901%
DATUM RL 28.0
PLAN
FOOTPATH CONTROL LINE FP01
0.329
0.193
0.000
-0.000
-0.036
CUT/FILL
(Depth of) SCALE A1 - 1 : 100
A3 - 1 : 200
38.051
36.951
36.712
36.619
35.967
DESIGN
LEVELS
39.110
38.750
38.360
38.051
37.280
36.905
36.583
35.967
35.830
35.734
EXISTING SURFACE
LEVELS
13.216
17.219
20.000
27.241
29.772
32.244
0.000
1.853
3.773
5.798
CHAINAGE
FOOTPATH - FP01
HOR. 1 : 100
LONGITUDINAL SECTIONS
Issue Made By Date Description
VERT. 1 : 100 PROPOSED RESIDENCE Scale : AS SHOWN NOTES:
A M.T. 06/09/24 For Operational Works Approval
REVISION
0 1 2 4 6 8 10m at No.3 HENDERSON STREET SUNSHINE BEACH
B M.T. 11/09/24 For Operational Works Approval Job No.: 24-0285 1. Do not scale drawings.
2. Scale is correct at A3.
Client: JMML INVESTMENTS
SCALE A1 - 1 : 100 C M.T. 18/09/24 For Operational Works Approval
Dwg No.: C03 3. Check and verify all dimensions
SCALE 1:100 @A1 Designed By : B.J. WINNING BEngTech (Civil), MEngPrac (Civil), MIEAust Drawn By : MT Date : 30/08/24 prior to commencement of work.
A3 - 1 : 200 Certified By : B.R. CROMAR BEng(Civil), MEIAust, CPEng, RPEQ, NER Date : 30/08/24 Ph: (07) 5444 5578 Email: [email protected] FINISHED GRADING PLAN
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.