2021-05-11 Services & Organisation Committee Meeting Agenda
The original of this document is very large (10.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Page 34 of 96
Report run date: 27-Apr-2021 16:07:37
500973 501000 500973 - Transport Strategy, Walking & Cycling Strategy &CNLG Grant 0 250,496 250,496 250,496 199,861 185,573 38,561.@ 74.08%
Total Transport and Infrastructure Management 500,000 2,140,701 2,210,701 2,210,701 1,900,833 1,844,738 87,939 83.45%
500974 501001 500974 - Noosa Heads The
5 1 1 1 4 8 908 623 90 19 54 Woods Bin Storage Enclosure 0 58,457 58,457 58,457 45,341 10,192 14,344. @ 17.44%
500976 501003 500976 - Masterplan Landfill SW Controls & Design 0 115,466 115,466 115,466 59,781 22,433 51,[email protected]%
510028 510028 510028 - Illegal Dumping Hotspot 0 59,433 59,433 59,433 44,900 44,900 00 75.55%
510042 501040 510042 - Noosaville Eumundi Road Landfill Outbound Weighbrdge 560,000 560,000 560,000 80,000 301,574 25,941 4,[email protected]%
510043 501041 510043 - Noosaville Eumundi Road Landfill Liner, Cell capping design 2,110,000 2,110,000 2,110,000 200,000 153,489 154,498 3,[email protected]%
510044 501042 510044 - Noosaville Eumundi Road Landfill Expansion of Resource Recov 750,000 750,000 750,000 50,000 83,858 1,622 10,[email protected]%
Total Waste Management 3,420,000 3,653,356 3,653,356 563,356 688,942 259,586 84,729 46.08%
Other Capital PR ERE EL 6,590,000 ete EY eS REE 4,725,756 1,891,911 880,590
500686 501044 500686 - Shire Bridge Annual Level 3 Inspections Annual 55,000 55,000 55,000 55,000 55,000 1,592 50,[email protected]%
500753 500753 500753 - Zero Emissions Noosa Project Implementation 250,000 521,655 521,655 521,655 332,857 369,244 79,[email protected]%
500963 500991 500963 - Shire CCTV Drainage Condition Assessment Program Annual 220,000 220,000 220,000 220,000 170,000 119,864 33,[email protected]%
500964 500992 500964 - Shire Road Infrastructure Asset Data Mat & Condition Annual 220,000 340,000 340,000 340,000 237,519 199,858 00 58.78%
500977 501004 500977 - Asset Management Systems Implementation 200,000 200,000 200,000 200,000 116,662 69,004 182,[email protected]%
510020 510020 510020 - Noosa Junction Streetscape 0 46,000 46,000 46,000 39,000 10,342 3.1250 22.48%
510062 #NIA 510062 - Unite and Recover Community Stimulus Package Revenue U&R 0 0 0 0 0 450 00 0.00%
Total Asset Management 945,000 1,382,655 1,382,655 1,382,655 951,039 770,355 348,780 55.72%
500518 500518 500518 - Plant and Fleet Replacement Program 895,000 1,344,345 1,234,345 1,234,345 301,149 211,149 429,[email protected]%
Total Fleet - Plant Replacement 895,000 1,344,345 1,234,345 1,234,345 301,149 211,149 429,867 17.11%
500542 500542 500542 - Implementation of Cl Anywhere Functionality for TechnologyOn 628,000 713,000 713,000 713,000 452,852 383,860 68,504. @ 53.84%
Total Information Technology 628,000 713,000 713,000 713,000 452,852 383,860 68,504 53.84%
510045 501043 510045 - QTC Capital Debt Redemption 2,414,000 2,414,000 2,414,000 2,414,000 2,414,000 0 08 0.00%
Total Other 2,414,000 2,414,000 2,414,000 2,414,000 2,414,000 0 0 0.00%
500714 500714 500714 - Whole of Shire, Climate Change Adaptation Strategy 210,000 210,000 210,000 210,000 172,987 134,399 5,[email protected]%
500716 500716 500716 - Whole of Shire, Project Team Resources for New Planning Sche 366,000 366,000 301,000 421,000 301,000 315,917 00 75.04%
500890 500890 500890 - Shire Planning Scheme Consultancy 0 0 100,000 100,000 81,803 61,774 27,955. @ 61.77%
500968 500995 500968 - Shire Project Place Spaced Approach - Placemaking Pilot Prog 160,000 160,000 125,000 5,000 50,928 14,457 018 289.15%
Page 34 of 96See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.