Skip to the record
For the highest quality transcripts.

Council archive · source document

09/0273 - Information Response [As Published] · 132009.273

of 3

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

’ TODCONSULTING

TOD CONSULTING PTY LTD DIRECTORS
CML AND STRUCTURAL ENGINEERS S Prystupa se. Muravs, CP Eng. RPEO.
ABN 39 128 805 336 P McGrath tees (cow MiEdus: RPE.
C Dowding se. mirsun APE.
SP:LN 09564 DB. Reynolds s& mipwesus APES
22 May 2009

Sunshine Coast Regional Council
PO Box 14]

TEWANTIN QLD 4565
ATTENTION: Marcus Brennan
Dear Sir

RE; NOOSA RUGBY CLUB Ref: 2009/273

OS ivULT

20 Mary Street Noosaville QLD 4566
PO Box 61 Noosaville GLD 4566
P07 5449 9600

FO7 5449 9494

E [email protected]
www.todconsulting.com

RECEIVED
2 5 MAY 2009

BY:_ én.

    
   

  

As requested in your letter dated 27 March 2009 please find set out below information regarding

stormwater runoff at the Noosa Rugby grounds.

As can be seen from the Locality Plan, the boundary of the Rugby Club is some 100m away from
the proposed new awning and shed. Any water from the roof of the shed or awning would be
dispersed over a very wide area before it reaches the boundary to the National Park, therefore
avoiding any increase or concentration of stormwater crossing the boundary.

With regard to your specific request for information we have set out below our response as

follows:-

1) The specific design of the stormwater absorption pit to the new Terrace Roof will be set
out in the “Operational Works” documents, however the pit will be some 8m° in volume
(1m x 1m x 8m long) and be lined with a geotextile to maintain open pore capacity.

2

As per the Terrace Roof there will be a specific design of an absorption pit adjacent to the

proposed shed when the “Operational Works” documents are submitted. The pit will be

some Im x 1m x 4m long, having a capacity of 4m*

3) Runoff from the N-W corner of the carpark will be addressed by the use of a grassed
swale which will disperse the stormwater, this will be incorporated with the design of the
shed absorption pit and detailed on the “Operational Works” documentation.

Yours faithfully

Stat Top

STEFAN PRYSTUPA
TOD CONSULTING

b/c : Scott Sobey

Used in these records

About this file

File size
94 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0273 - Information Response [As Published].pdf · 94 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.