Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Annexure 1 Negotiated Decision Notice 14 August 2003

Attached to the e-mail Reconfiguring a Lot (1 lot into 19) - RAL18/0023.

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

 

 

NOOSA COUNCIL IDAS Development Application Decision Notice 13

73. The applicant, future owners and tenants will implement this Plan.
Bushfire Management Plan (BMP) :

74, The FMP prepared by Les Hawkes of the Consultancy Bureau, dated March 2003, and forming part of
the application is endorsed as the draft BMP. However a revised BMP is to be prepared that
documents, inter alia, the folfowing matters:

74.1, expected behaviour of bushfires;

74.2. fire hazard management actions and risk minimisation strategies;

74.3. access for firefighters;

74.4, fuel toad management in all bushland and open space areas;

74.6, how ecological values, habitat values and the visual and amenity values of the vegetation
will be retained/protected;

74.6. required firebreaks, fire trails, access points and fire hydrants, etc. in bushland and open
space areas;

74.7. maintenance requirement for the above infrastructure;

74.8. how bushfires will be prevented from spreading into adjacent areas, including the Noosa
National Park;

74.9. coordination with other relevant organizations and agencies;

74.10. specific implementation procedures and responsibilities. _

74.11. the amended position of the western fire break to avoid vegetation protected within OS5.

75, The BMP shall be implemented by the applicant/owner.

76. Both the FMP and BMP shail:

76.1. Include drawings at the same scale (1:2000) showing the location and dimensions of all
firebreaks, fire brigade access roads and access points, location of fire hydrants, building
set-back requirements, etc. for the construction and operation stages of the Stage 1
development.
A o:\database\onestop\decision.doc

72.7. access between structures and vegetated areas:

72.8. fire suppression and evacuation procedures;

72.9. _ landscaping measures to reduce fire risk;

72.10. fuel load management and hazard reduction within landscaped areas;
72.11. required infrastructure — vehicle access tracks, firebreaks, hydrants, etc:
72.12. maintenance requirements for the above infrastructure;

72.13. how fires will be prevented from crossing from development precincts into the adjacent
bushland and open space areas;

72.14, coordination with other relevant organisations and agencies;

' 72.15. owners and operators training and responsibilities;

72.16. specific implementation procedures and responsibilities.
Log in to download the original file

Annexure 1 Negotiated Decision Notice 14 August 2003.pdf · 2.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.