Original source · versioned page text
Annexure 1 Negotiated Decision Notice 14 August 2003
Attached to the e-mail Reconfiguring a Lot (1 lot into 19) - RAL18/0023.
ee NOOSA COUNCIL IDAS Development Application Decision Notice ° 27 192. 193. 194, 195. 196. 197. 198. 199. * 200. 201, 202. Fill shall be compacted to 95% relative dry density as per Main Roads Department Test No. Q8A. A registered practicing Geotechnical Engineer shall supervise all the placement of fill and shall certify that all lots have been compacted to the required standard. Any existing fill on the site that does not comply with Council's requirements shall be removed at the direction of the Manager Land Development prior to additional filling works commencing. Following completion of the filling works, the registered practicing Geotechnical Engineer supervising the works shail submit compaction tests across the entire filled areas and a site classification report for each lot subject to filling. The extent of fill and each lot site classification shall be shown on a metes and bounds survey plan. Acid Sulfate Soils Where excavations are proposed below R.L 5.0m AHD a report shall be submitted from a suitably qualified person in conjunction with an application for development permit for operational works (earthworks), to determine if acid sulfate soils are present on site. if acid sulfate soils are present on site the report shall also outline the required treatment and management of the disturbed soils in accordance with the requirements of State Planning Policy 2/02 ‘Planning and managing development involving acid sulfate soils’. Erosion & Sediment Control To protect the environment against siltation/sediment export or soil erosion as a result of this development, an erosion and sediment control plan shall be submitted in conjunction with an application for a development permit for operational works (earthworks). Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, may be necessary. Prior to. commencement of building works, all physical site controt measures shall be installed, and the plan adhered to. Town Water Supply The applicant will construct at its cost a second feed in conjunction with the construction of the Walter Hay Drive access if the anticipated loading on the system for the ultimate development exceeds the equivalent of 35 tenements. Sizes of the mains are to be a minimum of 1 50mm diameter and are to be confirmed by a network analysis carried out by Councils consultants at the applicants cost. A water supply master plan for ultimate development shall be to the satisfaction of the Manager - Land Development and shall be submitted in Conjunction with an application for operational works (water supply). The Water Supply Master Plan will consider metering of individual occupancies and common (body corporate) flows as well as the reticulation system and valving arrangements. All water infrastructure will be designed and constructed in accordance with the approved Water Supply Master Plan. Sewer Capacity The applicant at its costs will construct the proposed sewer rising main in the development to discharge to Manhole NV40/01/418 in Eenie Creek Road. The existing sewer pump station and tising main are to be upgraded by the applicant to the standards and requirements as detailed in Councils Engineering Design Manual - Water & Sewerage. A Sewer Master Plan for ultimate development shall be submitted to the reasonable satisfaction of the Manager Land Development in Conjunction with an application for a development permit for Operational works (sewer works).. All sewer infrastructure will be designed and constructed in accordance with the approved Sewer Master Plan. All internat reticulation works (both water and sewerage) are to be constructed in accordance with Noosa Council Engineering Standards for Water and Sewerage (depending on tenure may be Classified as private main when completed) and checked by Council with full as constructed requirements as per Council standards, A a:\databaselonestop\decision.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.