Original source · versioned page text
Annexure 1 Negotiated Decision Notice 14 August 2003
Attached to the e-mail Reconfiguring a Lot (1 lot into 19) - RAL18/0023.
NOOSA COUNCIL IDAS Development Application Decision Notice : 30 11, 12. Provide a notice adjacent to the bund valve displaying the following: 13. “Bund drain valve to be kept closed and locked” 14. — Minor spills shall be. controlled by use of absorbent material such as rags, kitty litter or similar and disposed of with industrial refuse. 15. Provide fill point to aboveground tank inside bund containment with a dry break coupling or spill tray to prevent incidental spill during refueling. 16. Clean and maintain bund compound integrity at all times. Solid Waste 17. All solid waste shall be removed from the premises to an approved waste facility by a licensed waste transporter. : General / 18. All storage of flammable and combustible liquids must be stored in compliance with Australian Standard _ AS 1940 - 1993 “The Storage and Handling of Flammable and Combustible Liquids”. If storage limits exceed minor storage, then an application for licence for the storage of flammable and combustible liquids must be lodged with the local authority. - 19. Develop an inventory control system. Such inventory control measurements shall be reconciled by comparing product and water level! measurements with dispenser metre readings and deliveries. The reconciliation shall be conducted for each individual tank each day that product is added or removed from the underground storage tank. The inventory control computations on any loss or gain of product shall be included with a monthly summary of cumulative losses or gains of product. Note: Inventory control records and reconciliation data shall be: a) maintained and kept on site b) kept in an acceptable manner and format c) made available to the administering authority d) maintained for a minimum of 5 years 20. When a loss of product or discharge is indicated by any unexplained variation greater than 0.5% in the inventory reconciliation, the operator shall immediately notify the Administering Authority. 21. In the event of a situation creating environmental harm pertaining to a spill, leak, fire, explosion or similar, the Administering Authority shall be notified and advised of the incident and circumstances as soon as reasonably practicable after becoming aware of the event. 22. All mechanical and electrical leak detection equipment shall be inspected and tested annually. All records shall be kept on site for a minimum of 5 years. 23. — Ensure tank abandonment is carried out by either removal of the tank, or filling the whole of the tank with an inert soil material such as sand, concrete or other approved material, and the disconnection. of all pipes from the tank as stipulated in AS 1940 and the Contaminated Land Act. 24. — Ensure all persons working on, site where petroleum products are stored shall have relevant training in accordance with AS 1940 clause 9.3. . 25. —_ Ensure that the premise is licensed with the Local Authority under the Dangerous Goods and Safety Act Drainage from tank and package store bunds and compounds must be manually controlled so that all wastewater passes through treatment facilities before release to the environment. Any valve controlling the drainage from a compound shail be located outside the bund. The vaive shail be of a type in which the distinction between open and closed Positions is obvious and shall be closed and locked at all times except when flow to the treatment facility is authorised by management. 2001. A o:\database\onestop\decision.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.