Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Change Representations - Eumundi Noosa Rd · MCU24/0125

of 6

Text shows just the words. Original shows the document exactly as it was published.

3. Prior to Council issuing a Development Permit, provide an amended Stormwater
 Management Plan and associated Engineering Drawings that incorporates an
allowance for climate change in accordance with Performance Outcome 2 of the
Water Quality and Drainage Code. The amended package must include amendments
to Engeny’s Stormwater Management Plan and associated Engineering Drawings
prepared by TOD Consulting, be prepared by a suitably qualified person (RPEQ),
and include in particular:

       3.1. allowance for a 20% increase in rainfall intensity by the year 2100 for all
       modelled scenarios (10% and 1% AEP event);
       3.2. a revised assessment of non-worsening based on like-for-like scenarios
       for climate change scenarios, based on the 1% AEP event (2100);
       3.3. revised internal site drainage drawings and calculations to include a
       climate change allowance; and
       3.4. additional detail demonstrating how the “gap flow” has been calculated
       – nothing that Section 4.1 of the Stormwater Management Plan suggests that
       development flows in excess of the pipe network fail to report to the existing
       bioretention basin in Ely Street.

TODs development engineers provide updated engineering and stormwater management
plans, incorporating minor modifications to the stormwater calculations sheet. It is also
recognised there are no requirements to increase any pipe sizes of the building.



4. Prior to Council issuing a Development Permit, provide a Waste Management
       Plan demonstrating that all waste servicing and collection is to occur onsite.
       The Waste Management Plan must be prepared by a suitably qualified person
       and include, in particular:
       4.1. onsite collection of refuse/recycling must be undertaken using 1,100
       litre, low-noise waste containers – waste servicing, include the storage of
       waste containers, must occur in locations that minimise the amenity impact
       on adjacent properties.
       4.2. provision for on-site servicing by a Refuse Collection Vehicle (i.e.,
       Dennis Eagle Elite 2 6x4 with rear lift configuration) – the Refuse Collection
       Vehicle must be able to enter and exit the site in a forward gear while
       remaining wholly within the access driveway (i.e., the access handle to
       Starboard Avenue).
       4.3. If a Refuse Collection Vehicle is unable to remain wholly within the
       access driveway, provide a revised development layout that accommodate
       on-site manoeuvring of a Refuse Collection Vehicle; and
       4.4. Compliance with The Noosa Plan 2020 – Waste Management Code and
       PSP9 Waste Management.

The proposal demonstrates appropriate onsite collection points for 1,100L containers
located within the driveways of the development site. Swept path diagrams are included
with the engineering plans demonstrating compliance.

Used in these records

About this file

File size
3.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Change Representations - Eumundi Noosa Rd.pdf · 3.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.