Council archive · source document
Change Representations - Eumundi Noosa Rd · MCU24/0125
3. Prior to Council issuing a Development Permit, provide an amended Stormwater
Management Plan and associated Engineering Drawings that incorporates an
allowance for climate change in accordance with Performance Outcome 2 of the
Water Quality and Drainage Code. The amended package must include amendments
to Engeny’s Stormwater Management Plan and associated Engineering Drawings
prepared by TOD Consulting, be prepared by a suitably qualified person (RPEQ),
and include in particular:
3.1. allowance for a 20% increase in rainfall intensity by the year 2100 for all
modelled scenarios (10% and 1% AEP event);
3.2. a revised assessment of non-worsening based on like-for-like scenarios
for climate change scenarios, based on the 1% AEP event (2100);
3.3. revised internal site drainage drawings and calculations to include a
climate change allowance; and
3.4. additional detail demonstrating how the “gap flow” has been calculated
– nothing that Section 4.1 of the Stormwater Management Plan suggests that
development flows in excess of the pipe network fail to report to the existing
bioretention basin in Ely Street.
TODs development engineers provide updated engineering and stormwater management
plans, incorporating minor modifications to the stormwater calculations sheet. It is also
recognised there are no requirements to increase any pipe sizes of the building.
4. Prior to Council issuing a Development Permit, provide a Waste Management
Plan demonstrating that all waste servicing and collection is to occur onsite.
The Waste Management Plan must be prepared by a suitably qualified person
and include, in particular:
4.1. onsite collection of refuse/recycling must be undertaken using 1,100
litre, low-noise waste containers – waste servicing, include the storage of
waste containers, must occur in locations that minimise the amenity impact
on adjacent properties.
4.2. provision for on-site servicing by a Refuse Collection Vehicle (i.e.,
Dennis Eagle Elite 2 6x4 with rear lift configuration) – the Refuse Collection
Vehicle must be able to enter and exit the site in a forward gear while
remaining wholly within the access driveway (i.e., the access handle to
Starboard Avenue).
4.3. If a Refuse Collection Vehicle is unable to remain wholly within the
access driveway, provide a revised development layout that accommodate
on-site manoeuvring of a Refuse Collection Vehicle; and
4.4. Compliance with The Noosa Plan 2020 – Waste Management Code and
PSP9 Waste Management.
The proposal demonstrates appropriate onsite collection points for 1,100L containers
located within the driveways of the development site. Swept path diagrams are included
with the engineering plans demonstrating compliance.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Change Representations - Eumundi Noosa Rd.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.