Original source · versioned page text
2021-06-08 Planning & Environment Committee Meeting Agenda
The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 8 JUNE 2021
8.2.2.3
Performance Outcomes Acceptable Outcomes
PO6 AO6.1
The biodiversity and ecosystem values of Development and clearing of vegetation does not
waterways, wetlands and adjacent riparian zones occur within:
are protected by: a. a riparian buffer area;
a. avoiding any new development in a riparian b. a wetland area; or
buffer area and wetland area;
c. 10 metres either side of the centre line of
b. retaining aquatic and terrestrial habitat in other waterways identified on
riparian zones; a Biodiversity, Waterways and Wetlands
c. maintaining and enhancing wildlife corridors Overlay Map.
and connectivity along watercourses and
drainage lines for native fauna movement; AO6.2
d. avoiding edge effects and damage from Development provides for the rehabilitation of land
adjacent land uses; within:
e. maintaining stream integrity and bank a riparian buffer area;
stability by minimising bank erosion and d. a wetland area; and
slumping;
e. 10 metres either side of the centre line of any
f. maintaining water quality through filtering other waterway identified on a Biodiversity,
sediments, nutrients and other pollutants; Waterways and Wetlands Overlay Map.
and
g. removing pest species and replacing them
with local native species.
PO10 AO10.1
Development provides for ecologically important Landscaping and rehabilitation complements and
areas to be restored and enhanced through: supports ecologically important areas by:
a. designing landscaped areas to complement a. utilising local native species;
and enhance b. utilising suitable plant species identified
existing vegetation and ecological linkages; in PSP2 Landscaping;
b. removing species likely to displace native c. restoring degraded ecosystems to achieve a
flora species or degrade fauna habitat; functional ecosystem state that requires
c. replanting and rehabilitating degraded minimal human intervention;
habitat; d. replicating adjacent remnant habitats of the
d. replacing any vegetation removed with same type, including the
suitable local native species; understorey vegetation;
e. providing for fauna habitat; and e. creating or enhancing linkages
f. avoiding the planting of pest plant species. between existing habitats;
f. avoiding the use of pest plant species listed
in PSP2 - Landscaping;
g. planting riparian zones to filter stormwater
run-off, stabilise soil and provide for wildlife
habitat; and
h. providing ground and arboreal structures for
fauna, which may include ground
depressions, rocks, hollows, nesting boxes
and in-stream habitat.
AO10.2
Vegetation cleared is replaced with:
a. plantings of equivalent area that replicate
the floristic structure of the vegetation
removed; or
Page 24 of 119
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.