Skip to the record
Every meeting, every word.

Original source · versioned page text

2021-06-08 Planning & Environment Committee Meeting Agenda

of 119

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                 8 JUNE 2021


   Bushfire          FMU              Asset Protection Zone          Fire unit           Maintenance
  Interface       Assessment                   (APZ)                 access              requirements
  Zone risk                         Fire access       Fuel
 assessment                          trail width   Reduction
                                                   Zone (FRZ)
                                                     width
                  highly erodible
                  soil.

 Category B Essential service and hazardous facilities (e.g. utilities)
 3              <20 degrees       10m             5m                 Large fire    Fire trails every 3 months
                                                                     appliance     FRZ every 3 years
                                                                     can access
                                                                     and
                                                                     undertake 3   Slashing/mowing every 3
                                                                     point turn    months
                                                                     on trail.
                Narrow            3m              N/A                N/A control
                vegetation                                           line only
                corridor
 4              >20 degree        N/A             15m                N/A           FRZ every 3 years
                slope and/or
                highly erodible
                soil.
 Category C Residential buildings and facilities
 5              <20 degrees       4m              N/A                Medium and    Fire trails every 4 months
                                                                     small fire
                                                                     appliances
                                                                     can have
                                                                     one way
                                                                     access.
                Narrow            3m              N/A                N/A control   Slashing/mowing every 3
                vegetation                                           line only     months
                corridor
 6              >20 degree        N/A             10m                N/A           FRZ every 4 years
                slope and/or
                highly erodible
                soil.
 Category D Industrial, commercial, agricultural
 7              <20 degrees       3m              N/A                Small fire    Fire trails every 5 months
                                                                     appliance
                                                                     can have
                                                                     one way
                                                                     access.       Slashing/mowing every 5
                Narrow            3m              N/A                N/A control   months
                vegetation                                           line only
                corridor
 8              >20 degree        N/A             6m                 N/A           FRZ every 5 years
                slope and/or
                highly erodible
                soil.
4.    Consultation
Prior to the development of the Draft, internal consultation was undertaken with Council’s Natural
Areas Team and Disaster Management Team. An early Draft was provided to Queensland Fire &
Emergency Services for their review. The Draft was workshopped with Councillors on 17 December
2020 and presented to Council at its Ordinary Meeting of 18 February 2021, where Council resolved
to undertake public consultation over a four week period.



                                                                                              Page 77 of 119
Log in to download the original file

2021-06-08 Planning & Environment Committee Meeting Agenda(PDF, 17MB).pdf · 18.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.