                                               Officer:            Denis Wallace
                                               Direct Telephone:   (07) 5449 5179
                                               Response Address:   PO Box 141, Tewantin QLD 4565
                                               Email:              [email protected]
                                               Our Reference:      2007/1173
                                               Your Reference:     BNE21026
22 January 2009

Environmental Protection Agency
PO Box 15155
CITY EAST QLD 4002



Dear Sir

                              Negotiated Decision Notice
                                    Integrated Planning Act 1997

Your Department was a referral agency for the above application and provided a response to Council
in a letter dated 29 September 2008. Following representations made by the applicant, Council on 22
January 2009 agreed to issue a Negotiated Decision Notice.

Details of the negotiated decision are as follows:

1        APPLICATION DETAILS

    Application No:            2007/1173
    Street address:            172 Gympie Terrace, Noosaville
    Real property              Lot 164 CP 907410
    description:
    Planning Scheme:           The Noosa Plan

2        DECISION DETAILS
Council on 1 December 2008 decided to issue the following type of approval:-
        Development Permit for Operational Works - Prescribed Tidal Works - Refurbishment of
         Commercial Boathouse and Jetty/Pontoon
In relation to representations, Council on 22 January 2009 decided to:
A.       Agree to delete Conditions 3, 4, 5, 7 & 9
B.       Refuse to delete Condition 8 for the following reason:
         The condition is required to address safety and infrastructure concerns raised under the
         Prescribed Tidal Works Code
C.       Include two additional advice conditions
D.       Issue a Negotiated Decision Notice

3        RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.

                                                                                                 1 of 13
Full text of the other 12 pages

Page 2

                                                                                     2007/1173



4     ASSESSMENT MANAGER CONDITIONS
1.    Development undertaken in accordance with this approval must generally comply with the
      approved plans of development. The approved plans are listed in the following table and as
      may be amended by these conditions: -
      Plan         /      Rev.    Plan / Document Name                       Date
      Document No.
      4616-D01            B       Site Plan & General Arrangement –          3 September 2008
                                  Superior Jetties
      4616-D03                    Elevation & General Notes – Superior       17 April 2008
                                  Jetties
      Sheet 2 of 7                Floor Plan – Adrian Baker Computer         13 August 2008
                                  Drafting
      Sheet 3 of 7                East Elevation, West Elevation, South      13 August 2008
                                  Elevation & North Elevation – Adrian
                                  Baker Computer Drafting
      Sheet 4 of 7                Section 1 – Adrian Baker Computer          13 August 2008
                                  Drafting
      Sheet 5 of 7                North East & North West – Adrian           13 August 2008
                                  Baker Computer Drafting
      Sheet 6 of 7                South East & South West – Adrian           13 August 2008
                                  Baker Computer Drafting
      Sheet 7 of 7                Site Plan – Adrian Baker Computer          13 August 2008
                                  Drafting

2.    Handrails shall be fitted as per indicated on the approved drawings.
3.    Deleted.
4.    Deleted.
5.    Deleted.
6.    Any external Lighting associated with the use shall be designed, installed, operated, and
      maintained in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of
      Outdoor Lighting.
7.    Deleted.
8.    The rails to the abandoned slipway structure shall be removed prior to completion of the
      works,
9.    Deleted.
10.   The mooring facility shall not be utilised for live-aboard purposes.
11.   Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
      upgrading various infrastructure at the rates applicable at the time of payment. An estimate
      only of the contribution amounts under the current Council policies and requirements is
      outlined in the table below:




                                                                                        2 of 13

Page 3

                                                                                      2007/1173




       Contribution Required For:                                                    Amount:
       PSP12 – Public Open Space Contributions (Park)                                $42
       PSP16 – Sewerage Headworks Contributions                                      $241
       PSP17 – Water Supply Headworks Contributions                                  $134
       PSP20 – Pathway Trunk Network Contributions                                   $42
       TOTAL Contribution Amount =                                                   $ 459
       Please note, that these amounts are all subject to variations in the Consumer Price Index, All
       Groups Brisbane from September 2008 until the date of payment.

      All contributions must be paid prior to the commencement of the use.

      Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
      contributions not be paid at the due time, Council shall call upon the trading bank guarantee in
      full.

      Processing of bonds for security where specific Council approval has been given for the
      bonding of contributions will incur an administration fee in accordance with Council’s Land
      Development Commercial & Regulatory Fees at the time of lodgement.

      In the event that the Development Permit for Material Change of Use of Premises lapses or is
      cancelled, the paid contributions and/or the trading bank guarantee will be returned.
12.   Any damage caused to any public utility during the course of construction shall be repaired to
      Council’s standards and at no cost to Council.
13.   Any alteration of any public utility or other facilities necessitated by the development of the
      land or associated construction works external to the site shall be at no cost to Council.
14.   The transportation of all materials to and from the site shall be undertaken in a manner such
      that no particle matter escapes onto a public road. All vehicles carrying materials either to or
      from the site shall be covered to prevent materials including dust being windblown from the
      vehicle.
15.   Any construction and post construction activity is not to impact on the condition of the
      waterway, and is to be conducted so as not to breach the Environmental Protection Act (EPA)
      1994 and the Environmental Protection (Water) Policy 1997.
16.   The approval or conditions do not constitute a ruling on structural safety and the applicant
      must make their own arrangements to ensure adequacy of design and work. Also any
      approval granted does not warrant that such plans and specifications have been checked in
      detail, nor does it absolve the owner of the land from complying with all the conditions of this
      approval and/or relevant Council By-Laws and Policies and/or relevant statutes and/or
      statutory regulations in the execution and/or performance of said works. The Council does not
      accept any responsibility for the accuracy of such plans and specifications as approved.
17.   At the completion of the works certification by a Registered Professional Engineer of
      Queensland shall be submitted to Council prior to the return of any bond monies held by
      Council. The certification shall state that the works (boatshed, jetty, gangway, pontoons and
      piles) have been constructed in accordance with best practice methods, are in accordance
      with Coastal Protection and Management Act 1995, are structurally sound and will have no
      detrimental affect on the river bed, river banks or existing revetment walls.
18.   A final inspection and approval of the structure by Council’s Inspector is required prior to the
      return of any bond monies held by Council. Please contact Council’s Land Development
      Section to arrange the inspection.
                                                                                           3 of 13

Page 4

                                                                                       2007/1173



19.   The Development Permit for Operational Works lapses if the works have not been completed
      by 1 December 2010, unless an application to extend the currency is approved by Council.

5     REFERRAL AGENCY CONDITIONS

The referral agencies applicable to this application are:

 Referral Trigger            Referral Status     Referral Agency          Referral Address

 Operational Works that      Concurrence         Queensland               Brisbane          Region
 is  Prescribed   Tidal                          Transport            –   MacArthur Avenue    East
 Works                                           Maritime Safety          PINKENBA QLD 4008

 Operational Works that      Concurrence         Environmental            PO       Box       15155
 is  Prescribed   Tidal                          Protection Agency        CITY EAST QLD 4002
 Works

A copy of any referral agency conditions is attached.

6     APPROVED PLANS/DOCUMENTS

The approved plans and / or documents for this development approval are listed in the Assessment
Manager conditions.
7     ADVISORY NOTES

The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.    The applicant is advised that development contributions and infrastructure charges applicable
      to this development approval have been based on the following Uses Class/ Uses and
      applicable quantities:-

                    Existing Development                            Approved Development
       Existing Use Class /                                 Approved Use Class
                                  Existing Quantity                               Approved Quantity
               Use                                                / Use
       Commercial
                                                            Commercial Business
       Business Type 1 -        41m² Use Area                                     55m² Use Area
                                                            Type 1 - Office
       Office

2.    The applicant is informed that approval of this development application will trigger an
      Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
      Charges Plan for the estimated amount of $2,025 and is subject to variations in the Consumer
      Price Index, All Groups Brisbane from September 2008 until the date of payment. An
      Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated
      Planning Act 1997.
3.    The applicant is informed that payment via credit card transaction will not be an acceptable
      method of payment for development contributions conditioned in this permit or for
      infrastructure charge notices issued separately.
4.    Should any changes or modifications to the approved plans be required as a result of
      construction constraints, a Change to an Existing Approval Application under the Integrated
      Planning Act must be made. Amended plans clearly indicating the changes must be lodged
      with this application along with the appropriate fees.
5.    The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
      Local Law No. 12, prevents a builder or building contractor carrying out building work on a
      building site in a way that makes or causes audible noise to be made from the building work:-
                                                                                         4 of 13

Page 5

                                                                                         2007/1173



       5.1.   On a Sunday or public holiday, at any time; or
       5.2.   On a Saturday or a business day, before 7.00am or after 6.30pm.
       A maximum penalty of $1,500 applies to an offence under this legislation.
6.     Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
       the cost of operational works exceeds $80,000, then a portable long service leave levy is
       required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight
       the approved form issued by the Building and Construction Industry (Portable Long Service
       Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory
       declaration outlining the cost of the operational works must be submitted to Council prior to
       commencement of work.
Additional advice conditions
1.     The jetty must be licensed with the Council upon completion of the structural work and be
       licensed annually thereafter.
2.     Wastewater and sullage from vessels must only be disposed of at approved pumpout facilities.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8      PROPERTY NOTES

Not applicable

9      PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable

10     FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit              Subject of the required Development Permit
 required
 Nil

11     SELF ASSESSABLE CODES
Not applicable

12     SUBMISSIONS
Not applicable

13     REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME

Not applicable
                                                                                           5 of 13

Page 6

                                                                                     2007/1173



14     RIGHTS OF APPEAL
You have continuing appeal rights in respect of Council’s decision on your application. Refer Section
4.1.27. of the Integrated Planning Act 1997.

15     OTHER DETAILS
Should you wish to obtain more information about Council’s decision, electronic copies of Council’s
decision are available on line at www.sunshinecoast.qld.gov.au, or at Council Offices.

DECISION NOTICE HISTORY
 Original Decision Notice issued 1 December
  2008.
 Negotiated Decision Notice issued 22 January
  2009 with deletion of Conditions 3, 4, 5, 7 & 9
  and inclusion of two additional advice
  conditions.
Yours faithfully,



Kerri Coyle
MANAGER – LAND USE




                                                                                        6 of 13

Page 7

                                           2007/1173




Referral   Agency   Conditions    -
Queensland    Transport   (Maritime
Safety)
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




                                                 7 of 13

Page 8

2007/1173




  8 of 13


[OCR of page images]
2007/1173

6. You must adequate! y light the structuro. The contractor must position all lighting so it does not
omise a righ to the 6 tf navigation of other vessels, Any freestanding piles must have reiro-
refleative tape fitter.

7, You, or your agent must remove ary obstructions and debris encountered during construction
and demolition, ani dispase of them, as the Harbour Master requires.

3, You, or your agen , must extract all wharf piles.

9. The tidal works 7 ust not impade or restrict the operations of neighbouring properties, joases or
facilities.

10, Any ships and eq aipment you or your agent Use tnust comply with the Transport Operations
(Morine Safety) viet 1994, the Transport Operations (Marine Safety) Regulation 2004 aud the
Transport Operations (Marine Pollution) Act 1995.

il. Any ships using this fanility must comply with the Transport Operations (Marine Safety) Act
1994 and the Tr misport Oparations (Marine Safety) Regulation 2004,

12. The contractor roust complete construction and demotition within two years from the date of
approval. If ¢o. istruction and demolition js not comploted, you will need additional or amended
cormnents from the Regional Harbour Master.

Maritine Safety Qu sonsland does not need to be further consulted if alk of the above conditions are
met.

Tho above conditicns must be included in your application to the assessment mavager,

since!
—

W :
a
tain Richard 1 Johason
ional Haxbo ar Master (Brisbane)

Mar
rio Safety Queer Mand

8 of 13

Page 9

                                        2007/1173



Referral Agency Conditions                           –
Environmental Protection Agency
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




                                           9 of 13

Page 10

2007/1173




 10 of 13


[OCR of page images]
2007/1173

 

 

ecoaccess
environmental kcences and permis
Response
Concurrence Agency Response
Conditions:

Agency Interest: Coastal Protection and Management Act 1995

1

The works must be undertaken tn accordance with the plans listed below

2 The disturbance to the bed and banks of the waterway ts to be kept to a mintmum
3 Any material or debris that falls or ts deposited on tidal lands during the works must be removed at the
applicant's cost and expense prior to the practical completion of the works
4 No CCA treated timber is to be used until external surfaces are dry from the CCA treatment process
All treated timber is to be sawn or drilled over a catchment sheet and all offcuts are be disposed of to
an approved landfill site
5 All appropriate measures must be taken to prevent the pollution of tidal waters as a result of silt runoff,
oil and grease spills from machinery, concrete truck washout and alike Concrete agitator wash out
must only be conducted in a specified area to facilitate the removal of waste concrete from the area to
landfill Wastewater from cleaning equipment shall not discharge directly or in-directly to any
watercourse or stormwater system
Plans:
Drawing Numbers
4616-D01 Revision B, prepared by Superior Jetties dated 3 September 2008
4616-D02 prepared by Superior Jettres dated 17 April 2008
4616-D03 prepared by Superior Jetties dated 17 April 2008
4616-D04 prepared by Superior Jetties dated 1 July 2008
4616-D05 prepared by Superior Jetties dated 1 July 2008
4616-D06 prepared by Superior Jetties dated 1 July 2008
Certification Form 15 — SCG Consulting Engineers dated 16 September 2008
18259-S1 prepared by SCG Consulting Engineers dated AUG 2008
18259-S2 prepared by SCG Consulting Engineers dated AUG 2008
0808S Sheet 1 of 7 prepared by Adrian Baker dated 13 August 2008
0808S Sheet 2 of 7 prepared by Adrian Baker dated 13 August 2008
0808S Sheet 3 of 7 prepared by Adrian Baker dated 13 August 2008
0808S Sheet 4 of 7 prepared by Adrian Baker dated 13 August 2008
0808S Sheet 5 of 7 prepared by Adrian Baker dated 13 August 2008
0808S Sheet 6 of 7 prepared by Adrian Baker dated 13 August 2008
0808S Sheet 7 of 7 prepared by Adrian Baker dated 13 August 2008

Reasons for the inclusion of development conditions

In accordance with Section 3 3 18(7) of the Integrated Planning Act 1997 and Section 27B of the Acts
Interpretation Act 1954, the reasons for the inclusion of development conditions are

The Environmental Protection Agency ts recognised as a concurrence agency under the Integrated
Planning Amendment Regulation (No 1) 1998 for coastal management, other than amenity and aesthetic
significance or value Development conditions placed on the development approval for the application are
in accordance with section 106 of the Coastal Protection and Management Act 1995

 

Page 2 of 3 + 09/03 Version 11 Environmental Protection Agency

10 of 13

Page 11

2007/1173




 11 of 13


[OCR of page images]
2007/1173

 

ecoaccess

environmental bcences and permits
Response

Concurrence Agency Response

 

Additional information for applicants

This response does not authorise environmental harm unless a concurrence agency condition within this
response explicitly authorises that harm Where there ts no condition, or the development approval is silent
on a matter, the lack of a condition or silence shall not be construed as authorising harm

It is a requirement of the Environmental Protection Act 1994 that if the owner or occupier of this site
becomes aware a Notifiable Activity (as defined under Schedule 2 of the Environmental Protection Act 1994)
ts being carned out on this land or that the land has been affected by a hazardous contaminant, they must,
within twenty two (22) business days after becoming aware the activity is being carried out, give notice to the
Environmental Protection Agency A list of Notifiable Activities is provided within Schedule 2 of the
Environmental Protection Act 1994

This concurrence response pursuant to the Integrated Planning Act 1997 and assessed against section 104
of the Coastal Protection and Management Act 1995 does not remove the need to obtain any further
approvals for this development which may be required pursuant to this or other legislation, both State and
Commonwealth Applicants are advised to check with all relevant statutory authorities for such approvals as
may be required

Additional information for the Assessment Manager:

The Environmental Protection Agency referral agency jurisdiction for the development application ts confined
to that aspect of the application involving the triggers identified in the response EPA has no referral
agency jurisdiction in relation to other aspects of the development application.

In this regard it should be noted that the State Coastal Management Plan 2001 and SEQ Regional Coastal
Management Plan 2006 which, for the purposes of making a statutory decision, has the same effect as a
state planning policy The assessment manager Is required to give due consideration to the relevant State
planning policies when deciding the application

Should you have any queries in relation to this Response, please contact lan Biggs, the Project Manager, on the
telephone listed below

Yours sincerely

Be) ae

 

‘Signature Decision Date
Ben Sale Enquiries:
Manager (Sunshine Coast Office) Environmental Services
Brisbane North Region Environmental Protection Agency
Environmental Services GPO Box 2771 Brisbane Qld 4001
Environmental Protection Agency Telephone 3225 1209

Facsimile 3225 8723

 

Page 3 of 3 + 09/03 Version 11 Environmental Protection Agency

11 of 13

Page 12

                                                                                                        2007/1173




                                                     Appeal Rights
                                                     INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




The following is an extract from the Integrated                         (6) If an application involves assessment against a
Planning Act (Chapter 4).                                           concurrence agency code, appeal rights for submitters
                                                                    for the application are not available against the part of
Division 8 - Appeals to                court   relating    to       the approval that represents the concurrence agency’s
development applications                                            response for the code.
Appeals by applicants                                               Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application may           4.1.29.(1) An advice agency may, within the limits of its
appeal to the court against any of the following-                   jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development           development approval for a development application if-
    application;                                                    (a) the development      application     involves   impact
(b) a matter stated in a development approval, including any           assessment; and
    condition applying to the development,           and   the      (b) the advice agency told the applicant and the
    identification of a code under section 3.1.6;1                     assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a                 application as a submission for an appeal.
    development permit was applied for;                                (2) The appeal must be started within 20 business
(d) the length of a relevant period;                                days after the day the decision notice or negotiated
(e) a deemed refusal.                                               decision notice is given to the advice agency as a
                                                                    submitter.
    (2) An appeal under subsection (1)(a) to (d) must be
started within 20 business days (the “applicant’s appeal            Appeals for matters arising after approval given
period”) after the day the decision notice or negotiated            (co-respondents)
decision notice is given to the applicant.                          4.1.30.(1) For a development approval given for a
    (3) An appeal under subsection (1)(e) may be started at         development application, a person to whom any of the
any time after the last day a decision on the matter should         following notices have been given may appeal to the
have been made.                                                     court against the decision in the notice-
Appeals by submitters                                               (a) a notice giving a decision on a request for extension
4.1.28.(1) A submitter for a development application may               of the relevant period for an approval;
appeal to the court about-                                          (b) a notice giving a decision on a request to make a
(a) the giving of a development approval, including any                minor change to an approval.
    conditions (or lack of conditions) or other provisions              (2) The appeal must be started within 20 business
    of the approval; or                                             days after the day the notice of the decision is given to
(b) the length of a relevant period for the approval.               the person.
    (2) The appeal must be started within 20 business                   (3) Subsection (1)(a) does not apply if the approval
days (the “submitters appeal period”) after the day the             resulted from a development application (superseded
decision notice or negotiated decision notice is given to           planning scheme) that was assessed as if it were an
the submitter.                                                      application under a superseded planning scheme.
   (3) If a person withdraws a submission before the                   (4) Also, a person who has made a request
application is decided, the person may not appeal the               mentioned in subsection (1) may appeal to the court
decision.                                                           against a deemed refusal of the request.
   (4) If an application involves both impact assessment               (5) An appeal under subsection (4) may be started at
and code assessment, appeal rights for submitters are               any time after the last day the decision on the matter
available only for the part of the application involving            should have been made.
impact assessment.
                                                                    Division 9 - Appeals to court about other matters
    (5) If an application is processed under section                Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the application         (no co-respondents)
are available only for the aspects of the development that
would have required public notification under the                   4.1.31.(1) A person to whom any of the following notices
repealed Act.                                                       have been given may appeal to the court against the
                                                                    decision in the notice-
                                                                    (a) a notice giving a decision on a request to change or
                                                                       cancel a condition of a development approval.

1
   Section 3.1.6 (Preliminary approval may override local
planning instrument)
                                                                                                           12 of 13

Page 13

                                                                                                  2007/1173

(b) a notice under section 6.1.442 giving a decision to        (c) the decision to give a preliminary approval when a
    change or cancel a condition of a development                    development permit was applied for;
    approval.                                                  (d) the length of a period mentioned in section 3.5.21
    (2) The appeal must be started within 20 business                relevant period;
       days after the day the notice of the decision is        (e) a deemed refusal.
       given to the person.
                                                                   (2) An appeal under subsection (1)(a) to (d) must be
    (3) Also, a person who has made a request                  started within 20 business days (the “applicant’s appeal
       mentioned in subsection (1)(a) may appeal to the        period”) after the day the decision notice or negotiated
       court against a deemed refusal of the request.          decision notice is given to the applicant.
    (4) An appeal under subsection (3) may be started at           (3) An appeal under subsection (1)(e) may be started
       any time after the last day the decision on the         at any time after the last day a decision on the matter
       matter should have been made.                           should have been made.
Appeals against decisions to change approval conditions        The Registrar for the Building and Development
under the repealed Act                                         Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a decision       http://www.localgovernment.qld.gov.au/
made on an application to change the conditions
attached to an approval given under section 2.19(3)or          For Infrastructure Charges Only
section 4.4 of the repealed Act may appeal to the court        4.1.36 Appeals about particular infrastructure
against-                                                       charges
(a) the decision; or                                           (1) This section applies to a person who has been
(b) a deemed refusal of the application.                       given, and is dissatisfied with, an infrastructure charges
                                                               notice or a regulated State infrastructure charges notice.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of        (2) The person may appeal to the court against the
the decision is to be given to the person.                     notice.
    (3) An appeal under subsection (1)(b) may be started       (3) The appeal must be started within 20 business days
at any time after the last day a decision on the matter        after-
should have been made.                                         (a) if the notice is given because of a development
Appeals against local laws                                          approval or master plan approval-the day the
                                                                    applicant is given notice of the decision about the
4.1.33B.(1) An applicant who is dissatisfied with a                 approval; or
decision of a local government or the conditions applied
under a local law about the use of premises or the             (b)    otherwise-the day the notice is given to the person.
erection of a building or other structure permitted by the     (4)    An appeal under this section may only be about-
planning scheme may appeal to the court against the            (a) whether a charge in the notice is so unreasonable
decision or the conditions applied.                                that no reasonable relevant local government, State
   (2) The appeal must be started within 20 business               infrastructure provider or coordinating agency could
days after the day notice of the decision is given to the          have imposed it; or
applicant.                                                     (b) an error in the calculation of the charge.
For Building Works Only                                        (5) To remove any doubt, it is declared that an appeal
Rights of appeal conferred by Section 4.2.9 of the             under this section can not be about the methodology
Integrated Planning Act 1997 as follows:                       used to establish the charge in the relevant infrastructure
                                                               charges schedule or regulated State infrastructure
Division 3 – Appeals          to   tribunals   relating   to
                                                               charges schedule.
development applications
Appeals by applicants
4.2.9(1) An applicant for a development application may
appeal to the Building and Development Tribunal against
any of the following-
(a) the refusal, or the refusal in part, of a development
    application;

(b) a matter stated in a development approval, including
    any condition applying to the development, and the
    identification of a code under section 3.1.6;3

2
  Section 6.1.44 (Conditions may be changed or cancelled
by assessment manager or concurrence agency in certain
circumstances)
3
   Section 3.1.6 (Preliminary approval may override local
planning instrument)
                                                                                                    13 of 13

Used in these records

About this file

File size
351 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Negotiated Decision Notice - Concurrence Agency - EPA [As Published].pdf · 351 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.