ADDITIONAL INFORMATION FOR ITEM 40 - STORMWATER The basement level of the proposed Residential Aged Care facility is RL 27.6mAHD. The base level of the bio-retention basin to which its basement drains (Lot 6) is RL 27.0mAHD. Therefore, the basement would drain under gravity. The pipe grade would be 0.8%, which is above the 0.5% minimum as specified in the QUDM Table 7.12.1. The 2 year ARI tail water level in the Lot 6 basin would be RL 27.8mAHD (Depth=0.8m) which would result in 200mm flood depths for the 2 year ARI event. Therefore, a non-return device is recommended to stop return flow into the basement. This will be detailed at Operational Works. The basement level of the proposed apartment buildings ranges from is RL 23.6 to 24.8 mAHD. The base level of the bio-retention basin to which the apartment buildings drain (Lot |) is RL 19.5mAHD. The grade would range from 5-13% which is acceptable under QUDM Table 7.12.1. The 100 year ARI tail water level in the Lot 1 basin would be RL 23.16mAHD (Depth=3.66m), which provides a minimum 0.44m freeboard to level of each apartment basement. Information provided by Cardo 27" November 2008 $:1301 1:081128inReqCardno
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1128 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 18.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.