Council archive · source document
08/1128 - Response to Information Request [As Published] · 132008.1128
Very large file (18.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Chapter, 5 —
BIOR
Inspection 1 to 6 monthly
Location: = -
Description: |;
LD.
Site Visit by: . «
INSPECTION ITEMS: . i
Sediment accumulation at inflow points?
Litter within basin?
Erosion at inlet or other key structures?
‘raffic damage present?
Evidence of dumping (e.g. buitding waste)?
Vegetation condition satisfactory (density, weeds etc)?
Watering of vegetation required?
Replanting required?
Mowing/slashing required?
Clogging of drainage points {sediment or debris}?
Evidence of ponding?
Oamage/vandalism to structures present?
Surface clogging visible?
Drainage system inspected?
Resetting of system required?
COMMENTS
.|Action Required (details)
Eas WSUD Technical Design Guidelines for South East Queensland ~ Version 1 June 2006
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1128 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 18.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.