11/88/2688 17:81 61-74471862 NOOSA SHIRE COUNCIL PAGE 97/89 -6- Please also provide a copy of the manual tuming movement counts undertaken on Wednesday 28 May, as outlined In the Traffic Report, for Council to assess against our own traffic count date. + 48, An intersection analysis shail also be carried out on all intersections within the area that result i in 9 5% increase in traffic as'a result of the proposed development, and recommendations } made as to fiow best to improve these intersections. It is noted that a 10 year horizon has been used based on all construction being completed by 2012, giving a projected year of 2022 as stated in Section 4.1.1 of the Traffic Assessment ©. li... Report by. ARUP, however at section 4.4 of the report the intersection analysis has been ., based on traffic-volumes projected to 2019, not 2022. This anomaly should be corrected and ,,. the data revised accordingly. Furthermore the completion date of 2012 for the entire” # ) development with full occupancy seems an ambitious target and it is questionable as ‘to ‘ “ of whether the 10-year horizon should be based on a more realistic completion date for the! i}; development. Lite In terms of traffic distribution It Is noted that no assessment has been made for traffic that will utilise Eenie Creek Road, Though it is acknowledged that the section of Eenle Creek Road that adjoins Ben Lexcen Drive has not been open to traffic at this point in time, this is likely to change very soon as this section of the Road network is due to be completed and open before the end of 2008. Accordingly some traffic too and from the proposed development is likely to use this route and this should be taken into consideration in the analysis. 51, In terms of the Origin / Destination split of traffic, It Is also noted that no assessment has been made for traffic that utilises the existing service road that currently cuts across the north- eastem boundary of proposed Lot 9, that is, the one-way service road that has entry off Ben Lexcan Drive south of Lipton Street. In this regard consideration needs to be given to existing traffic that take this route as well as some of the traffic that will be associated with the proposed development which will also take this route. 62, In addition to the above, also review the traffic impacts of changing the one-way service road off Ben Lexcen Drive to allow two-way vehicle movements with an exit onto Ben Lexcen Drive to avoid vehicles with a southern origin’ destination having to use the Lipton / Ben Lexcen Drive roundabout and having to travel past the Shop precinct. . Internal Traffic Generation and Vehicular Access ‘. §3. Provide a plan that clearly illustrates all of the internal road widths and whether two-way or . one-way vehicle movements are proposed. Information provided to date Is unclear and based on drawing 0873_DA16 by Smith & Tracey Architects is likely to result in drivar confusion, panic, and low speed accidents occurring. This convoluted arrangement is unacceptable and itis recommended that all circulation roads be designed to cater for two-way movements, with low volume internal roads being at least 5.5m wide, and the higher volume intemal roads being approximately 7m wide as suggested in the Traffic Assessment by ARUP. 54. Demonstrate that all internal roads can cater for the vehicles intended to use them, by illustrating appropriate vehicle swept paths. This is an issue that must be addressed up front @$ Opposed to delaying to operational works stage as vehicle turning paths and internal foadway requirements are likely to affect the proposed building focations, shapes and sizes, 55. Provide a plan that also illustrates all internal pathways and the width of such pathways. It is suggested that an intemal pathway hierarchy needs to be established, with the pathways carrying the tower volume of users being 1.5m wide (also the narrowest), and the pathways more likely to carry higher volumes being at least 2.0m wide. Consideration also needs to be given to the mobility levels of the various patrons, as it is considered that some patrons will utilise walking fames and some will be in wheelchairs. To this end the pathway network needs to be designed to cater for these users. The applicant may also choose to provide wider pathways than that which has been mentioned to enhance the standard of their development. 56. Demonstrate that service vehicle access (Ie. exit and entry) to various parts of the site will occur In & forward gear at all times. :
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1128 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 18.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.