Council archive · source document
08/1128 - Response to Information Request [As Published] · 132008.1128
Very large file (18.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Blue Care Property Development Unit Blue Care Sunrise Beach Traffic Impact Assessment 4.2.4 Total Trip Generation A summary of the abovementioned trip generation rates applied to the respective land uses is shown in Table 4.2.4 below. Table 4.2.4 — Total Trip Generation “Blue Care” Use Number Rate AM Peak PM Peak Independent Living _ 55 _units 0.4 __ trips/unit 23 23 Apartments 54 apart. 0.4 _ trips/unit 23 23 Serviced Apartment 20 apart. 0.2 _ trips/unit 5 5 Staff (Total) N/A 20 32 Aged Care Generation . Visitors (central facility) 98 | beds 0.1 | trips/unit 10 10 TOTAL 81 94 As shown in the above table, it is anticipated that the subject site will generate 87 trips in the AM peak period and 94 trips in the PM peak period. , J:\86000\86512\661DOCUMENTS\REPORTSIREPORT TITLE\FINALYOOOZREPORT_JUNE08_V2.D0C Page 11 ‘Arup Issue 24 June 2008
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1128 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 18.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.