Council archive · source document
08/1128 - Response to Information Request [As Published] · 132008.1128
Very large file (18.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Blue Care Property Development Unit Blue Care Sunrise Beach Traffic Impact Assessment Table 4.4b — Ben Lexcen Drive / Girraween Court Intersection Analysis Results: 2019 Design Year Peak Approach Movement Degree of Average 95" Percentile Period Saturation (%) —_ Delay (s) Queue (m) Left 59 10 43. Ben Lexcen * Drive (South) Through 59 8 43 Right 60 16 43 AM Peak Ben Lexcen Through 27 5. 14 Drive (North) Right 27 12 14 Girraween Left 18 4 9 Court (West) Right 18 14 9 Left 27 9 15 Ben Lexcen > Drive (South) Through 27 6 415 Right 27 14 15 PM Peak Ben Lexcen Through 65 ‘ 5 19 Drive (North) Right 65 12 19 Girraween Left 18 7 8 Court (West) Right "18 13 “8 The above results demonstrate that both intersections are predicted to operate well within acceptable limits during the 2019 morning and evening commuter peak, with the intersection volumes and geometries assumed. , JABG0O0\865 1\B6\1OOCUMENTSIREPORTSIREPORT Page 15 Arup TITLE\FINALWOOO2REPORT_JUNE08_V2.D0C Issue 24 June 2008
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1128 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 18.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.