 4.5 Reconfiguring a lot (1 lot into 3 lots)
The proposal seeks a community title subdivision for 1 lot per dwelling and a small Lot 0 of common
property. The proposal complies with the Performance outcomes PO27 – PO29 for the following reasons:
   •   The subdivision will occur once construction of the approved buildings is complete;
   •   The driveway and entry access are clear statements of design and
   •   The design provides amenity and convenience for the users;
   •   The dwellings are less than 100m to the Noosa Fair shopping centre where all services and
       facilities are located in Noosa Junction including to public transport;
   •   Is within a Medium Density Residential Zone;
   •   Appears as 2 dwellings to the street, not one large bulky dual occupancy;
   •   The proposal is only seeking a different tenure as in reality the building presents no different to a
       building unit format plan with exclusive use areas;
   •   The dwelling and carparking can be accommodated onsite. In fact, 1 additional car space is
       provided to that required by the code;
   •   Urban infrastructure will be provided;
   •   The proposal is in an urban environment and is not negatively impacting on any assessable
       vegetation;
   •   The lots are generally rectangular in shape; and
   •   The proposal complies with LOS and POS requirements of the code and therefore by default
       provides more than reasonable amenity for the residents.


 4.6 Works and Overlay Codes
 Approval is sought for Operational Works. RECOR provides engineering plans and a stormwater design.
 A landscaping plan is also provided as part of the proposal plans which includes landscaped area and
 some planting detail for screening vegetation along the side boundaries, front and rear setbacks.
 A slope stability report, prepared by Tectonic Geotechnical and Environmental Engineers is included as
 part of the documentation.
 In terms of the stormwater management RECOR concludes:
       The existing and proposed development site have been modelled for the critical design storm
       events for the site, which found attenuation would be required to reduce post development peak
       flows to pre-development levels. Provision of 2kL of attenuation storage per unit with a 43mm low
       flow orifice and 100mm high flow outlet was found to provide mitigate the development such that
       there will be no increase to existing peak flow discharges from the site for the modelled storm
       events.
       Run-off from the development will be managed through an internal drainage network of pits and
       pipes to capture and convey run-off to the lawful point of discharge from the development, being
       kerb adaptor outlets in the Wyandra Street frontage. Small amounts of upstream run-off, run-off
       from impervious areas and the mitigated roof run-off will be captured by inlet pits and discharged
       at the north-western corner of the site into the kerb and gutter drainage system.




                                                                                            Page 14 of
Log in to download the original file

planning report 12 wyandra.pdf · 1.6 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.