Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Approved Plans - MCU20-0072

of 9

Plans and drawings: the text below has words only, no drawings.

Very large file (15.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                                                             -
                                                                                                                                                                    APPROVED PLANS
                                                                                                                                                                       MCU20/0072




                                                                                                                                                                                                                                           SK-02
                                                                                                                                                                     NOOSA COUNCIL




                                                                                                                                                                                                                                                                                 SK-01
                                                                                                                                                                     19 AUGUST 2021
                                                                                                                                                                             -




                                                                                                                                                                                                                                           SITE PLAN

                                                                                                                                                                                                                                                                                 LOCATION PLAN
                                                                                                                                                                                            JOB:
                                                                                                                                                                                            GSL04JOB:
                                                                                                                                                                                                 GSL07
                                                                                                                                                                                            DATE:
                                                                                                                                                                                                   DATE:
                                                                                                                                                                                            8/02/2017
                                                                                                                                                                                                   1/7/20


                                                                                                      E2



                                                                                                                  E4
                                                                                     APPROVED   E3                       E3
                                                                                       STAFF
                                                                                      CARPARK        bag racksliding
                                                                                                         teaching operable
                                                                                                        SITE AREA
                                                                                                              teaching
                                                                                                               doorteaching
                                                                                                                       wall
                                                                                                E1            wall        E1
                                                                                                                     wallwall




                                                                                                                                                                                 17 SHORT ST SOUTHPORT QLD 4215 AUSTRALIA
                                                                                                      E2



                                                                                                                  E4




                                                                                                                                                                                 PO BOX 930 SOUTHPORT QLD 4215 AUSTRALIA
                                                                                                                                                                                 P +61 7 5532 2044 / ABN 35 071 453 257

                                                                                                                                                                                                                                 SHORT ST SOUTHPORT QLD 4215 AUSTRALIA
                                                                                                                                                                                                                                 BOX 930 SOUTHPORT QLD 4215 AUSTRALIA
                                                                                                                                                                                                                             P +61 7 5532 2044 / ABN 35 071 453 257
                                                                                                                                                                                                                             [email protected]




                                                                                                                                                                                                                                                                           [email protected]
                                                                                                                                                                                                                             PO BURLINGBROWN.COM




                                                                                                                                                                                                                                                                           BURLINGBROWN.COM
                                                                                 N
                       LOCATION PLAN
                       PROPOSED DEMOUNTABLE BUILDINGS          SCALE 1:2000@A3


                                                                                                                                                                                  _PRELIMINARY




                        LOCATION PLAN
                      0        20       40       60     100m                                                                                                                      ISSUE    _PRELIMINARY
                                                                                                                                                                                  NOT FOR ISSUE

                                                                                                                                        SITE PLAN
                                                                                                                                                                                           NOT FOR
                                                                                                                                                                                  CONSTRUCTION
         GOOD SHEPHERD LUTHERAN COLLEGE

         F.L.A LEARNING SPACE
                                                                                                                                                                                           CONSTRUCTION




                                                                                                                                N
               PROPOSED DEMOUNTABLE BUILDINGS

            PROPOSED  DEMOUNTABLE  BUILDINGS
                                                                                                                                                2000@A3
                                                                                                                                        SCALE 1:1000@A3
                                                                                                                                                                                                                            ISSUE

                                                                                                                                                                                                                               P3 P1
                                                                                                                                                                                                                                                                         ISSUE
         LOCATION: 115 Eumundi Rd, _ _Noosaville_QLD_4566.                                                                          0         20
                                                                                                                                              10          40
                                                                                                                                                          20   60
                                                                                                                                                               30     100
                                                                                                                                                                       50m
               LOCATION: 115_NOOSAVILLE_QLD_4566.


Document Set ID: 21594200
                  21213117
                  21260700
Version: 1, Version Date: 25/08/2021
                          05/08/2020
                          14/10/2020
Log in to download the original file

Approved Plans - MCU20-0072.pdf · 15.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

Full text of the other 8 pages

Page 2

                                                                                                                                                                                                                                                                                                                                                       SK-02
                                                                                     EXISTING CARPARK
                                                                                          to remain
                                                                                                                                         EXISTING BUILDING
                                                                                                                                              to remain
                                                                                                                                                                                                                                                                                    EXISTING
                                                                                                                                                                                                                                   EXISTING BUILDING                                BUILDING
                                                                                                                                                                                                                                        to remain                                   to remain




                                                                                                                                                                                                                                                                                                                                                       PROPOSED SITE PLAN
                                                                                                                                                                                                                                  existing administration building
                                                                                                                                                                                                                                  to be relocated

                                                                                                                                                                                                                                                                                   EXISTING
                                                                                                                                                                                                                                                                                   BUILDING
                                                                                                                                      FUTURE PERFORMING                                                                                                                            to remain
                                                                                                                                         ARTS BUILDING




                                                                               EXISTING BUILDING
                                                                                    to remain                                                                                                                         EXISTING BUILDING                              EXISTING BUILDING
                                                                                                                                     PROPOSED FORECOURT                                                                    to remain                                      to remain
                                                                                                                                            AREA


                                                                                                                              proposed location for existing
                                                                                                                                    administration building
                                                                                                                                                                                              10,3
                                                                                                                                                                                                      50




                                                                                                                                                                                     ION
                                                                                                                                                                                  EPT
                                                                                                                                                                                           OFFICE 2




                                                                                                                                                                               REC
                                                                                                                                                                                                      OFFICE 1
                                                                                                                                                                                                                                                                                   EXISTING               JOB:
                                                                                                                                                                                                                                                                                   BUILDING               GSL07
                                                                                                                                                                                                                                                                                   to remain




                                                                                                                                                                                                                 00
                                                                                                                                                                                                             12,0
                                                                                                                                                                                     OPEN OFFICE

                                                                                                                                                                                                                                                                                                          DATE:
                                                                                                                                                                                                                                                                                                          20/7/20
                                                               EXISTING
                                                               BUILDING
                                                               to remain                                                                                                                                                                         EXISTING BUILDING
                                                                                                                                                                       DECK
                                                                                                                                                                                                                                                      to remain
                                                                                   EXISTING POOL
                                                                                      to remain
                                                                                                                                                                               BREAKOUT




                                                                                                                                              CLASSROOM




                                                                                                                                                          CLASSROOM




                                                                                                                                                                                                                 STAFF
                                                                                                                                                                                                                 ROOM


                                                                                                                                                                                                                         12,028
                                                                                                                                                                                ROOM 02

                                                                                                                                                                                              BREAKOUT




                                                                                                                                                  01




                                                                                                                                                              02
                                                                                                                                                                                               ROOM 03

                                                                                                                                                                        BREAKOUT
                                                                                                                                                                         ROOM 01
                                                               EXISTING
                                                               BUILDING
                                                               to remain

                                                                                                                                                                      30,906




                                                                                                                                                                                                                                                                                                17 SHORT ST SOUTHPORT QLD 4215 AUSTRALIA
                                                                                                                                                                                                                                                                                                PO BOX 930 SOUTHPORT QLD 4215 AUSTRALIA
                                                                                                                                                                                                                                                                                                P +61 7 5532 2044 / ABN 35 071 453 257
                                                                                                                                              EXISTING BUS ZONE
                                                                                                   existing bollards                               to remain
                                                                                                                                                                                                                                                                     EXISTING PLAYING
                                                                                                                                                                                                                                                                         COURTS
                                                                                                                                                                                                                                                                         to remain
                                                                                                   existing trees to remain            EXISTING CARPARK
                                                                                                                                            to remain




                                                                                                                                                                                                                                                                                                                                              [email protected]
                                                                           N




                                                                                                                                                                                                                                                                                                                                              BURLINGBROWN.COM
                                                                                                                                                   existing tree to be removed
                 PROPOSED SITE PLAN
                 PROPOSED DEMOUNTABLE BUILDINGS         SCALE 1:500@A3



                 0       5        10       15     25m
                                                                                                                                                                                                                                                                                                _PRELIMINARY



                           PROPOSED SITE PLAN
                                                                                                                                                                                                                                                                                                ISSUE
                                                                                                                                     RELOCATED EXISTING & NEW GFA CALCULATIONS                                                                                                 -
                                                                                                                                                                                                                                                                                                NOT FOR
                                                                                                                                                                                                                                                                                                CONSTRUCTION
                PROPOSED DEMOUNTABLE BUILDINGS
                                                                                                                                     RELOCATED EXISTING GFA = 103m2                                                                                                  APPROVED PLANS
                PROPOSED DEMOUNTABLE BUILDINGS
                LOCATION: 115_NOOSAVILLE_QLD_4566.
                                                                                                                                     NEW GFA = 290m2                                                                                                                    MCU20/0072
                                                                                                                                                                                                                                                                      NOOSA COUNCIL
                                                                                                                                                                                                                                                                                                                                           ISSUE

                                                                                                                                                                                                                                                                                                                                           P3
                                                                                                                                                                                                                                                                      19 AUGUST 2021
Document Set ID: 21594200
                  21213117
                  21260700                                                                                                                                                                                                                                                     -
Version: 1, Version Date: 25/08/2021
                          05/08/2020
                          14/10/2020

Page 3

                                                                                           Manufacturing - Floor                                                                                                                                                                                                                  Manufacturing - Ceiling                                             General Notes & Disclaimers
                                                                                                                                                                                                                          Manufacturing - Electrical Equipment                                                                                                                                        • Wall/Ceiling/Roof frames built to Ausco
                   Tag                                      Type                                       Frame Crs.              Pan Material                           Insulation                    Tag                      Description                           Phases Qty.         Installed                                    Frame                                                               Backbone framing design standards.
                   FL01 Particleboard, 22mm, F11 flooring grade, LC150 joists                         400                  0.35mm Galv Steel Pan R1.5 Glass Wool                                   EQ01 PE Cell                                                                    3   By Ausco    Tag             Frame             Crs.                  Lining                  Insulation         • Building chassis designed to Ausco
                   FL02 Decking, Modwood 22mm                                                         480                  -                     -                                                 EQ02 Smoke Alarm 240V                                                           1   By Ausco    CL01 Engineered steel frame, 400            Versilux, 6mm, H-mould (White), to -                     Standard Chassis drawings.
                                                                                                                                                                                                                                                                                                        75mm "Lipped C" section                eaves & verandah                                       • All work must be done in accordance with
                                                                                                                                                                                                                                                                                                   CL02 Engineered steel frame, 400            Plasterboard, 10mm, TSF (White)    R4.0 Glass            the relevant Australian/New Zealand
                                                                                                                                                                                                                                                                                                        75mm "Lipped C" section                                                   Wool Bats
                                                                                           Manufacturing - Walls                                                                                                            Manufacturing - Electrical Fixtures                                                                                                                                         Standard(s) and the National Construction
                                                                                                                                                                                                                                                                                                                                                                                                        Code.
                                                                         Frame                                                                                                                      Tag                            Description                                Qty.     Installed                                                                                                      • Furniture, plumbing, & electrical
                   Tag                     Frame                          Crs.                        Cladding                                      Lining                      Insulation         EE01 Draw wire, with plate                                                     31    By Ausco
                                                                                                                                                                                                                                                                                                                                                                                                        representations are indicative. Appearance
                   WL01 Engineered steel frame, 75mm,                   600           -                                               Plasterboard, 10mm, TSF               -                      EE02 GPO, 2 gang, 10A, single pole                                             32    By Ausco                                    Manufacturing - Roof
                                                                                                                                                                                                                                                                                                                                                                                                        may vary depending on supplier.
                        "Lipped C" section                                                                                            (Blanc)                                                      EE03 Isolator Switch, 20A, single pole WP                                       9    By Ausco                              Frame                                                                   • Loose items to be packed for transport.
                   WL02 Engineered steel frame, 75mm,                   400           Scyon Matrix Panel (Deep Ocean &                Plasterboard, 10mm, TSF               R2.0 glasswool         EE05 Switch, 2 gang, 1 way, single pole                                         4    By Ausco   Tag         Frame           Crs.          Cladding            Lining           Insulation
                        "Lipped C" section                                            Paperbark, refer elvations, express joint       (Blanc)                               batts                  EE06 Floor Box, flush mounted, -'Commander F4BP' 2 x GPO 2 gang                 2    By Ausco
                                                                                                                                                                                                                                                                                                                                                                                                      • Site, stairs, ramp and building skirting
                                                                                      painted black)                                                                                                                                                                                               RF01 Engineered steel 1100             Custom Orb (Deep -                   R1.8 Glass Wool          indicative only. Size, fall and location to suit
                                                                                                                                                                                                        10A single pole & 4 x Draw wire with plate
                                                                                                                                                                                                                                                                                                        frame purlins,                    Ocean)                               Foil
                   WL03 Engineered steel frame, 75mm,                   400           3.6mm Rough Ply                                 Plasterboard, 10mm, TSF               R2.0 glasswool         EE09 General purpose outlet, weatherproof, 10A, single pole                     6    By Ausco        75mm, "Lipped C"
                                                                                                                                                                                                                                                                                                                                                                                                        site conditions. Constructed to comply with
                        "Lipped C" section                                                                                            (Blanc), one side only                batts                  EE10 Switch, 2 gang, 1 way, single pole - Ceiling Fan                           4    By Ausco        section                                                                                         AS1428.1.
                   WL03 Engineered steel frame, 75mm,                   400           Scyon Matrix Panel (Deep Ocean &                Plasterboard, 10mm, TSF               R2.0 glasswool                                                                                                                                                                                                            Manufactured to Wind Speed: B190
                        "Lipped C" section                                            Paperbark, refer elvations, express joint       (Blanc)                               batts
                                                                                      painted black)
                                                                                                                                                                                                                                                                                                                                                                                                      Manufactured in: MQB
                                                                                                                                                                                                                             Manufacturing - Lighting Fixtures                                        Manufacturing - Trims (General)                 Manufacturing - Trims (Gutters)                 Intended Location: Noosaville, QLD
                                                                                                                                                                                                    Tag                      Description                           Lamps Qty.          Installed                   Description                                     Description
                                                                                                                                                                                                                                                                                                   CCS pre-finished barge (Manor Red)              CCS prefinished gutter (Manor Red)                 Client Approval
                                                                                           Manufacturing_Doors                                                                                      LT01 Light, Emergency Exit compliant to AS2293.1, ceiling      1               6    By Ausco
                                                                                                                                                                                                         mounted                                                                                                                                                                                      Client:           Good Shepard Lutheran College
                                                                               Size                                              Finish
                                                                                                                                                                                                    LT02 Vandal resistant light, 18W, clear                        1              13    By Ausco                            Manufacturing - Plumbing Fixtures
                                                                                                                           Frame      Frame
                                                                                                                                                                                                    LT03 Fluorescent batten, 2x36W, diffused                       2              38    By Ausco   Tag                             Description                              Qty.         Installed    Approved by:
                    Tag   Qty.      Style/Type      Leaf 1 Leaf 2         H       H (R)    W (R)    Head     Glazing        Type      Finish        Leaf Finish            Accessories
                                                                                                                                                                                                    LT04 LED 3W Emergency Surface Mount                                           1     By Ausco
                    D02     6     Swing Door       920       0           2040     2085     950      2040     Clear       Aluminium    Clear       Timber SC       Half Glazed, lever escape set                                                                                                                                                                               3          By Ausco     Company:
                                                                                                                         w/           Anodised w/ (Deep           (Satin Chrome), hold open door                                                                                                   PL01 CCS Slotted Gutter (Manor red)                                        1          By Ausco
                                                                                                                         Aluminium    Black trims Ocean)          closer
                                                                                                                         trims
                                                                                                                                                                                                                                Manufacturing - Mechanical                                         PL02 100x75mm CCS Straight Downpipe (Deep Ocean)                           5          By Ausco     Date (dd-mm-yyyy):
                                                                                                                                                                                                                                                                                                   PL03 100x75mm Offset CCS Down Pipe(Deep Ocean)                             7          By Ausco
                                                                                                                                                                                                   Tag                             Description                                Qty.     Installed                                                                                                      Signature:
                                                                                                                                                                                                   ME01 AC, Split system, indoor unit, 7.1kW pipework concealed in wall       5        By Ausco
                                                                                          Manufacturing_Windows                                                                                    ME02 AC, Split system, indoor unit, 5.0kW pipework concealed in wall       4        By Ausco                             Manufacturing - Structural Framing
                                                                                  Size                                       Finish                                                                ME03 Split System Reverse Cycle, Outdoor unit, packed and installed on     9        By Ausco      Tag       Qty.      Comments                               Description
                                                                                                                             Frame        Frame                                                         site                                                                                                                                                                                                               Drawings - Architectural
                                                                                                                                                                                                                                                                                                   B          2                              Ausco Type 'B' wall bracing
                    Tag    Qty.           Style/Type              H      H (R)        W     W (R)   Head       Glazing        Type        Finish                     Accessories                   ME04 Ceiling fan, 1400mm                                                   15       By Ausco                                                                                                              Sheet                 Content                                          Rev
                                                                                                                                                                                                                                                                                                   B          19      Type B Wall Brace      Ausco Type 'B' wall bracing
                    W01     15         Half Slider Window        1075    1080     1800      1810     2275       Grey       Aluminium      Clear       Fibreglass Mesh Aluminium Flyscreen
                                                                                                                                         Anodised     (Black)                                                                                                                                      BF01       3       Subframe black         Perimeter, 150mm PFC, 12,000 x 3,450mm                           A-000         Schedules - Building Shell                                    I
                                                                                                                                                                                                                                                                                                                                                                                                              A-001         Site Plan                                                     I
                    W02      4         Half Slider Window        1075    1080     1155      1165     2275       Grey       Aluminium      Clear       Fibreglass Mesh Aluminium Flyscreen                                  Manufacturing - Complexing
                                                                                                                                         Anodised     (Black)                                                                                                                                                                                                                                                 A-100         Ground Floor Plan                                             I
                    W4       8      Window w/Side Louvres        462     467      1800      1810     612        Grey       Aluminium      Clear       Fibreglass Mesh Aluminium Flyscreen          Rear Wall external         - Flexible Gap sealant with Down pipe over               By Ausco                                                                                                               A-101         Roof Plan                                                     I
                                                                                                                                         Anodised     (Black)
                                                                                                                                                                                                                                                                                                                                                                                                              A-200         Elevations                                                    I
                                                                                                                                                                                                   Front wall external        - Flexible Gap sealant & painted finish                  By Ausco                                                                                                               A-300         Ground Floor RCP                                              I
                                                                                                                                                                                                   Internal walls             - Fully flushed and painted finish                       By Ausco                                                                                                               A-500         Section & Details                                             I
                                                                                          Manufacturing - Rooms
                                                                                                                                                                                                   Internal Ceiling           - Fully flushed and painted finish                       By Ausco
                          Name                 Area         Perim.            Floor Covering                                Skirting                                    Cornice
                  Breakout Room 1          Not Placed Not Placed Carpet Tiles                               Aluminium skirt 100mm (Clear Anodised) 55mm Set plaster cornice                        External Soffit/Eave       - 50mm 'T' mold 'White'(8 x 600L & 4 x 2400L)            By Ausco
                  Breakout Room 2          Not Placed Not Placed Carpet Tiles                               Aluminium skirt 100mm (Clear Anodised) 55mm Set plaster cornice
                  Staff Room               Not Placed Not Placed Carpet Tiles                               Aluminium skirt 100mm (Clear Anodised) 55mm Set plaster cornice                        External Barge             - 80x40 CCS angle under gutter 'Manor red'(8 x 600L)     By Ausco
                  Breakout Room 1           39.61 m²   26.32 m
                                                                                                                                                                                                   No Floor coverings.                                                                 By Others
                  Breakout Room 2           23.25 m²   19.30 m
                  Breakout Room 3           47.00 m²   28.82 m Carpet Tiles                                 Aluminium skirt 100mm (Clear Anodised) 55mm Set plaster cornice
                  Classroom 1               63.37 m²   32.30 m Carpet Tiles                                 Aluminium skirt 100mm (Clear Anodised) 55mm Set plaster cornice
                  Classroom 2               62.90 m²   32.20 m Carpet Tiles                                 Aluminium skirt 100mm (Clear Anodised) 55mm Set plaster cornice
                                                                                                                                                                                                                                                                                                                                                                                                       I       Moved ramp, Added deck, stairs & windows                      15.07.2020       CB
                  Deck                      15.82 m²   16.11 m Modwood                                      NA                                     NA                                                                                                                                                                                                                                                  H       Moved Staff Room                                              30.06.2020       CB
                  Deck                      65.31 m²   59.54 m Modwood                                      NA                                     NA                                                                                                                                                                                                                                                  G       Bigger Breakout Room 2                                        29.06.2020       CB
                  Staff Room                30.38 m²   25.30 m                                                                                                                                                                                                                                                                                                                                         F       Adjusted Building Location and added RL's, Moved Stairs and   26.07.2019       JP
                                                                                                                                                                                                                                                                                                                                                                                                               Ramp
                                                                                                                                                                                                                                                                                                                                                                                                        E      Resizing of Buildings and Layouts. Relocated Office Moved     19.07.2019       JP
                                                                                                                                                                                                                                                                                                                                                                                                       D       For Client Approval                                           31.08.2018       IC
                                                                                                                                                                                                                                                                                                                                                                                                      Iss.                              Description                            Date           By


                                                                                                                                                                                                                                                                                                                                                                                                                       FOR APPROVAL


                                                                                                                                                                                                                                                                                                                                                                                                                   COPYRIGHT AUSCO MODULAR PTY LTD. THIS DOCUMENT MAY NOT BE
                                                                                                                                                                                                                                                                                                                                                                                                                    REPRODUCED OR HAVE ITS CONTENTS DIVULGED WITHOUT WRITTEN
                                                                                                                                                                                                                                                                                                                                                                                                                                            AUTHORITY.
                                                                                                                                                                                                                                                                                                                                                                                                     Title


                                                                                                                                                                                                                                                                                                                                                                                                       Schedules - Building
                                                                                                                                                                                                                                                                                                                                                                                                       Shell (MQB)
                                                                                                                                                                                                                                                                                                                                                                                                     Project
                                                                                                                                                                                                                                                                                                                                                                                                       30.85x12m Learning Centre-
                                                                                                                                                                                                                                                                                                                                                                                                       SG (B190)
                                                                                                                                                                                                                                                                                                                                                                                                     Client

                                                                                                                                                                                                                                                                                                                                                                                                       Good Shepard Lutheran
                                                                                                                                                                                                                                                                                                                                                                                                       College


                                                                                                                                                                                                                                                                                                                                                                                                     Drawn By            Drawn Date         Scale

                                                                                                                                                                                                                                                                                                                                                                      APPROVED PLANS
                                                                                                                                                                                                                                                                                                                                                                                     -
                                                                                                                                                                                                                                                                                                                                                                                                              IC          MAR 18                 1:1                                  A2
                                                                                                                                                                                                                                                                                                                                                                         MCU20/0072                  Checked By          Check Date
                                                                                                                                                                                                                                                                                                                                                                                                                                              DIMENSIONS ARE IN MM
                                                                                                                                                                                                                                                                                                                                                                       NOOSA COUNCIL                       AAD            MAR 18




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   15/07/2020 7:00:51 PM
                                                                                                                                                                                                                                                                                                                                                                                                                                                  DO NOT SCALE
                                                                                                                                                                                                                                                                                                                                                                       19 AUGUST 2021                Project No.                                      Order No.
                                                                                                                                                                                                                                                                                                                                                                                     -                     0240100047                                   -
                                                                                                                                                                                                                                                                                                                                                                                                     Drawing No.                                             Sheet                  Issue

                                                                                                                                                                                                                                                                                                                                                                                                           -                                                 A-000 I
                                                                                                                                                                                                                                                                                                                                                                                                                                                                     Designed by: Brisbane


Document Set ID: 21594200
                  21213117
                  21260700
Version: 1, Version Date: 25/08/2021
                          05/08/2020
                          14/10/2020

Page 4

                                                                                                                                                                                                                                       General Notes & Disclaimers
                                                            GYMNASIUM                                                                                                                                                                  • Wall/Ceiling/Roof frames built to Ausco
                                                                                                                                                                                                                                         Backbone framing design standards.
                                                                                                                                                                                                                                       • Building chassis designed to Ausco
                                                                                                                                                                                                                                         Standard Chassis drawings.
                                                                                                                                                                                                                                       • All work must be done in accordance with
                                                -
                                                                                                                                                                                                                                         the relevant Australian/New Zealand
                              APPROVED PLANS                                                                                                                                                                                             Standard(s) and the National Construction
                                                                                                                                                                                                                                         Code.
                                 MCU20/0072                                                                                                                                                                                            • Furniture, plumbing, & electrical
                               NOOSA COUNCIL                                                                                                                                                                                             representations are indicative. Appearance
                               19 AUGUST 2021                                                                                                                                                                                            may vary depending on supplier.
                                                -                                                                                                                                                                                      • Loose items to be packed for transport.
                                                                                                                                                                                                                                       • Site, stairs, ramp and building skirting
                                                                                                                                                                                                                                         indicative only. Size, fall and location to suit
                                                                                                                                                                                                                                         site conditions. Constructed to comply with
                                                                                                                                                                                                             EXISTING ADMIN              AS1428.1.
                                                                                                                                                                                                             BUILDING TO BE            Manufactured to Wind Speed: B190
                                                                                                                                                                                                             RELOCATED                 Manufactured in: MQB
                                                                                                                                                                                                                                       Intended Location: Noosaville, QLD

                                                                                                                                                                                                                                       Client Approval
                                                                                                                                                                                                                                       Client:           Good Shepard Lutheran College

                                                                                                                                                                                                                                       Approved by:

                                            POOL                                                                                                                                                                                       Company:

                                                                                                                                                                                                                                       Date (dd-mm-yyyy):

                                                                                                                                                                                                                                       Signature:



                                                                                                                                                                                                                                                            Drawings - Architectural
                                                                                                                                                                                                                                              Sheet                 Content                                          Rev
                                                                                                                                                                                                                                               A-000         Schedules - Building Shell                                    I
                                                                                                                                                                                                                                               A-001         Site Plan                                                     I
                                                                                                                                                                        00
                                                                                                                                                                   31                                                                          A-100         Ground Floor Plan                                             I
                                                                                                                                                                             R                                                                 A-101         Roof Plan                                                     I
                                                                                                                                                                          EA
                                                                                                                                                                    CL                                                                         A-200         Elevations                                                    I
                                                                                                                                         PROPOSED                                                                                              A-300         Ground Floor RCP                                              I
                                                                                                                                         RELOCATION FOR                                                                                        A-500         Section & Details                                             I
                                                                                               GL                                        EXISTING ADMIN
                                                                                                 -F                                      BUILDING
                                                                                                   FL
                                                                                                        +7
                                                                                                          73
                                                                                                 00
                                                                                              24
                                                                                  0
                                                                                00




                                                                                                                                             DN
                                                                             12
                                                                                     00
                                                                                  96




                                                                                                                                                                                                                                        I       Moved ramp, Added deck, stairs & windows                      15.07.2020       CB
                                                                                                                                                                                                                                        H       Moved Staff Room                                              30.06.2020       CB
                                                                 GL                                                                                                                                                                     G       Bigger Breakout Room 2                                        29.06.2020       CB
                                                                   -F
                                                                     FL                       Classroom 1                                                                                                                               F       Adjusted Building Location and added RL's, Moved Stairs and   26.07.2019       JP
                                                                          +1                                                                                                                                                                    Ramp
                                                                            26                                                                                                                                                           E      Resizing of Buildings and Layouts. Relocated Office Moved     19.07.2019       JP
                                                                              1                                                                                                                                                         D       For Client Approval                                           31.08.2018       IC
                                                                                                                                Deck                                                                                                   Iss.                              Description                            Date           By
                                                                                                               Classroom 2
                                                                                                                                                                                                                                                        FOR APPROVAL



                                                                                                                                                                     00

                                                                                                                                                                    R
                                                                                                                                                                  30
                                                                                                                             Breakout Room 2




                                                                                                                                                                 EA
                                                                                  BU           17



                                                                                                                                                               CL
                                                                                                  15                    7
                                                                                                                      50
                                                                                          S         0               16                                                       GL
                                                                                                                                                                               -F
                                                                                                                                                                                 FL
                                                                                                                                                                                                                              MATH                  COPYRIGHT AUSCO MODULAR PTY LTD. THIS DOCUMENT MAY NOT BE

                                                                                              DR                   Breakout Room 1                                                    +1
                                                                                                                                                                                        75                                    STAFF   Title
                                                                                                                                                                                                                                                     REPRODUCED OR HAVE ITS CONTENTS DIVULGED WITHOUT WRITTEN
                                                                                                                                                                                                                                                                             AUTHORITY.

                                                                                                      O                                 Breakout Room 3                                   5
                                                                                                                                                                                                                                        Site Plan (MQB)
                                                                                                       P
                                                                                                           O         34                            Staff Room
                                                                                                            FF          50

                                                                                                                  ZO
                                                                                                                       NE      10
                                                                                                                                  25                                                                                                  Project
                                                                                                                                    0
                                                                                                                                                  GL
                                                                                                                                                    -F
                                                                                                                                                                                                                                        30.85x12m Learning Centre-
                                                                                          EXISTING TREE TO
                                                                                          BE REMOVED
                                                                                                                                                      FL
                                                                                                                                                           +2                                                                           SG (B190)
                                                                                                                                                             07                                                                       Client
                                                                                                                                                               8
                                                                                                                                                                                                                                        Good Shepard Lutheran
                W                                                                                                                                                                             HPE / HOME                                College
                    AL
                         TE                                                                                                                                                                   EC / ENGLISH
                               R                                                                                                                                                              STAFF                           NORTH
                                   HA                                                                                                                                                                                                 Drawn By            Drawn Date         Scale


                                            Y                                                                                                                                                                                                  IC          MAR 18 1 : 250                                              A2
                                                DR                                                                                                                                                                                    Checked By
                                                                                                                                                                                                                                            AAD
                                                                                                                                                                                                                                                          Check Date
                                                                                                                                                                                                                                                           MAR 18
                                                                                                                                                                                                                                                                               DIMENSIONS ARE IN MM




                                                                                                                                                                                                                                                                                                                                    15/07/2020 7:00:56 PM
                                                     IV                                                                                                                                                                                                                            DO NOT SCALE

                                       1.             E
                                                Site Plan
                                                                                                                                                                                                                                      Project No.

                                                                                                                                                                                                                                            0240100047
                                                                                                                                                                                                                                                                                       Order No.
                                                                                                                                                                                                                                                                                         -
                                                                                                                                                                                                                                      Drawing No.                                             Sheet                  Issue
                                                1 : 250
                                                                                                                                                                                                                                            -                                                 A-001 I
                                                                                                                                                                                                                                                                                                      Designed by: Brisbane


Document Set ID: 21594200
                  21213117
                  21260700
Version: 1, Version Date: 25/08/2021
                          05/08/2020
                          14/10/2020

Page 5

                                                                                                                    1                           2                              3                             4                              5               30850
                                                                                                                                                                                                                                                                                6                              7                              8                              9                       10
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          -
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                APPROVED PLANS
                                                                                                                                                                            13650                                                                           3450                                                                             13750                                                                                                                                                 MCU20/0072
                                                                                                                 116           3224            176                    4987                   100                                 8497                                       116                            6674                              176                            6724                     116
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 NOOSA COUNCIL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 19 AUGUST 2021
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          -




                                                                                                                                                                                                                                                                                                                                                                                                                                    Eave
                                                                                                                                                                                                                                                                                    PL02                                                       PL02




                                                                                                                                                                                                                                                                                                                                                                                                                          600
                                                                                                                                           PL02                                                        PL02                                                                                                 WL02                                                            WL02B               PL02
                                                                                                                               W01                           W01                     W02             W02                   W01                                                        B       W01           BB B              W01      B      BB     B     W01          B              W01     B     B




                                                                                       116




                                                                                                                                                                                                                                                                                                                                                                                                              116
                                                                A


                                                                                                                                                                                                                           Breakout Room 1


                                                                                       4662
                                                                                                              W01                                                                                                              39.61 m²


                                                                                                        WL02                          WL03                 Breakout Room 3                                        FL01                                                                                                           WL03                 WL03
                                                                                                                                                               47.00 m²




                                                                                                                                                                                                                                                                                                                                                                                                                                                   Proposed New Building
                                                                                                                                                                                                                                                                                                                                                                                                                          9600
                                                                                                                                                                                                                 WL01
                                                                                       100



                                                                                                                                                                                                                                                                      D02
                                                                                                                                                                                                                                                                                                     Classroom 2                                                    Classroom 1
                                                                                                                         Staff Room                                                                                                                                                                    62.90 m²                                                       63.37 m²
                                                                     12000




                                                                                                                                                                                                                                                                                                                                                                                                                                           12000
                                                                                                                                                                                      WL01
                                                                                                                          30.38 m²                                                                                                                              WL02                                       FL01                                                             FL01
                                                                                                                                                      FL01
                                                                                                                                                                                                          Breakout Room 2
                                                                                                                                                                                                              23.25 m²
                                                                                       4662




                                                                                                              W01                                                                                                                           W01         Deck
                                                                                                                                                                                                                                                       15.82 m²

                                                                                                                                                                                                     FL01
                                                                                                                                                                                                                                                                                       W04 Above                   W04 Above                                W04 Above                 W04 Above
                                                                                         116




                                                                B
                                                                                       Eave
                                                                         600




                                                                                                                                                             W01                       D02          D02                    W01                                                                W01                       W02           D02          D02         W02                     B
                                                                                                                                                                                                                                                                                                                                                                                       W01       B
                                                                                                                                                                       WL03                                                                                                                              WL03                                                                 WL03




                                                                                                                                                                                                                                                                                                                                                                                                                          2400
                                                                                  2372




                                                                                                                                                                                                                                                        Deck
                                                                                                                                                    D02
                                                                                                                                                                                                                                                       65.31 m²

                                                                C                                                      PL03    W01                  PL03                  PL03                                                                  PL03                                          FL02               PL03                                                         PL03

                                                                                                                                        WL02




                                                                                                                               3400                          3400                          3450                           3400                              3450                             3400                         3450                            3450                        3450
                                                                                                                                                                                                                                                                                                                                                                                                                                                                             I       Moved ramp, Added deck, stairs & windows                      15.07.2020     CB
                                                                                                                                                                                                                                                                                                                                                                                                                                                                             H       Moved Staff Room                                              30.06.2020     CB
                                                                                                                              Module 1                     Module 2                       Module 3                       Module 4                       Module 5                            Module 6                    Module 7                         Module 8                    Module 9   Drawings - Architectural
                                                                                                                                                                                                                                                                                                                                                                                                                                                                             G       Bigger Breakout Room 2                                        29.06.2020     CB
                                                                                                                                                                                                                                                                                                                                                                                          Sheet         Content                                    Rev                       F       Adjusted Building Location and added RL's, Moved Stairs and   26.07.2019     JP
                                                                                                                                                                                                                                                                                                                                                                                             A-000     Schedules - Building Shell                                   I                Ramp
                                                                                                                                 1. Ground Floor                                                                                                                                                                                                                                             A-001     Site Plan                                                    I
                                                                                                                                                                                                                                                                                                                                                                                                                                                                             D
                                                                                                                                                                                                                                                                                                                                                                                                                                                                              E      Resizing of Buildings and Layouts. Relocated Office Moved
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     For Client Approval
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   19.07.2019
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   31.08.2018
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  JP
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  IC
                                                                                                                                                                                                                                                                                                                                                                                             A-100     Ground Floor Plan                                            I
                                                                                                                                            1 : 100                                                                                                                                                                                                                                                                                                                         Iss.                              Description                            Date         By
                                                                                                                                                                                                                                                                                                                                                                                             A-101     Roof Plan                                                    I
                                                                                                                                                                                                                                                                                                                                                                                             A-200
                                                                                                                                                                                                                                                                                                                                                                                             A-300
                                                                                                                                                                                                                                                                                                                                                                                                       Elevations
                                                                                                                                                                                                                                                                                                                                                                                                       Ground Floor RCP
                                                                                                                                                                                                                                                                                                                                                                                                                                                                    I
                                                                                                                                                                                                                                                                                                                                                                                                                                                                    I
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             FOR APPROVAL
                                                                                                                                                                                                                                                                                                                                                                                             A-500     Section & Details                                            I


                                                                                               Manufacturing_Doors                                                                                                                                                                  Manufacturing - Floor
                                                                               Size                                                   Finish                                                              Tag                                    Type                                           Frame Crs.              Pan Material                        Insulation                    General Notes & Disclaimers
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         COPYRIGHT AUSCO MODULAR PTY LTD. THIS DOCUMENT MAY NOT BE
                                                                                                                              Frame        Frame                                                          FL01 Particleboard, 22mm, F11 flooring grade, LC150 joists                           400                 0.35mm Galv Steel Pan          R1.5 Glass Wool                         • Wall/Ceiling/Roof frames built to Ausco                                                       REPRODUCED OR HAVE ITS CONTENTS DIVULGED WITHOUT WRITTEN
                       Tag    Qty.     Style/Type    Leaf 1 Leaf 2       H        H (R)        W (R)   Head    Glazing         Type        Finish    Leaf Finish            Accessories                                                                                                                                                                                                     Backbone framing design standards.                                                                                    AUTHORITY.
                                                                                                                                                                                                          FL02 Decking, Modwood 22mm                                                           480                 -                              -                                                                                                                        Title
                       D02     6     Swing Door      920    0          2040       2085         950     2040    Clear      Aluminium     Clear       Timber SC      Half Glazed, lever escape set                                                                                                                                                                                          • Building chassis designed to Ausco
                                                                                                                          w/
                                                                                                                          Aluminium
                                                                                                                                        Anodised w/ (Deep
                                                                                                                                        Black trims Ocean)
                                                                                                                                                                   (Satin Chrome), hold open door
                                                                                                                                                                   closer                                                                                                                                                                                                                   Standard Chassis drawings.
                                                                                                                                                                                                                                                                                                                                                                                          • All work must be done in accordance with
                                                                                                                                                                                                                                                                                                                                                                                                                                                                             Ground Floor Plan
                                                                                                                          trims                                                                                                                                                 Manufacturing_Windows
                                                                                                                                                                                                                                                                        Size                                        Finish
                                                                                                                                                                                                                                                                                                                                                                                            the relevant Australian/New Zealand
                                                                                                                                                                                                                                                                                                                                                                                            Standard(s) and the National Construction
                                                                                                                                                                                                                                                                                                                                                                                                                                                                             (MQB)
                                                                                                                                                                                                                                                                                                                    Frame           Frame
                                                                                                                                                                                                          Tag     Qty.         Style/Type               H      H (R)        W       W (R)     Head     Glazing       Type           Finish                  Accessories                     Code.
                                                                                          Manufacturing - Rooms                                                                                           W01      15       Half Slider Window         1075    1080     1800         1810     2275      Grey       Aluminium      Clear       Fibreglass Mesh Aluminium Flyscreen         • Furniture, plumbing, & electrical
                             Name                 Area     Perim.              Floor Covering                                  Skirting                                  Cornice                                                                                                                                                 Anodised     (Black)                                       representations are indicative. Appearance                                     Project

                      Breakout Room 1         Not Placed Not Placed Carpet Tiles                              Aluminium skirt 100mm (Clear Anodised) 55mm Set plaster cornice
                                                                                                                                                                                                          W02      4        Half Slider Window         1075    1080     1155         1165     2275      Grey       Aluminium      Clear
                                                                                                                                                                                                                                                                                                                                 Anodised
                                                                                                                                                                                                                                                                                                                                              Fibreglass Mesh Aluminium Flyscreen
                                                                                                                                                                                                                                                                                                                                              (Black)
                                                                                                                                                                                                                                                                                                                                                                                            may vary depending on supplier.                                                  30.85x12m Learning Centre-
                                                                                                                                                                                                                                                                                                                                                                                          • Loose items to be packed for transport.
                      Breakout Room 2
                      Staff Room
                                              Not Placed Not Placed Carpet Tiles
                                              Not Placed Not Placed Carpet Tiles
                                                                                                              Aluminium skirt 100mm (Clear Anodised) 55mm Set plaster cornice
                                                                                                              Aluminium skirt 100mm (Clear Anodised) 55mm Set plaster cornice
                                                                                                                                                                                                           W4      8      Window w/Side Louvres        462     467      1800         1810     612       Grey       Aluminium      Clear
                                                                                                                                                                                                                                                                                                                                 Anodised
                                                                                                                                                                                                                                                                                                                                              Fibreglass Mesh Aluminium Flyscreen
                                                                                                                                                                                                                                                                                                                                              (Black)                                     • Site, stairs, ramp and building skirting                                         SG (B190)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Client
                      Breakout Room 1          39.61 m²   26.32 m                                                                                                                                                                                                                                                                                                                           indicative only. Size, fall and location to suit
                      Breakout Room 2          23.25 m²   19.30 m
                                                                                                                                                                                                                                                                                    Manufacturing - Walls
                                                                                                                                                                                                                                                                                                                                                                                            site conditions. Constructed to comply with                                      Good Shepard Lutheran
                                                                                                                                                                                                                                                                                                                                                                                            AS1428.1.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                             College
                      Breakout Room 3          47.00 m²   28.82 m Carpet Tiles                                Aluminium skirt 100mm (Clear Anodised) 55mm Set plaster cornice
                      Classroom 1              63.37 m²   32.30 m Carpet Tiles                                Aluminium skirt 100mm (Clear Anodised) 55mm Set plaster cornice                                                                                  Frame                                                                                                                      Manufactured to Wind Speed: B190
                      Classroom 2              62.90 m²   32.20 m Carpet Tiles                                Aluminium skirt 100mm (Clear Anodised) 55mm Set plaster cornice                             Tag                    Frame                          Crs.                           Cladding                                      Lining                     Insulation        Manufactured in: MQB
                      Deck                     15.82 m²   16.11 m Modwood                                     NA                                     NA                                                   WL01 Engineered steel frame, 75mm,                  600           -                                                 Plasterboard, 10mm, TSF               -                     Intended Location: Noosaville, QLD
                      Deck                     65.31 m²   59.54 m Modwood                                     NA                                     NA                                                        "Lipped C" section                                                                                             (Blanc)
                      Staff Room               30.38 m²   25.30 m                                                                                                                                         WL02 Engineered steel frame, 75mm,                  400           Scyon Matrix Panel (Deep Ocean &                  Plasterboard, 10mm, TSF               R2.0 glasswool        Client Approval                                                                  Drawn By            Drawn Date         Scale
                                                                                                                                                                                                               "Lipped C" section

                                                                                                                                                                                                          WL03 Engineered steel frame, 75mm,                  400
                                                                                                                                                                                                                                                                            Paperbark, refer elvations, express joint
                                                                                                                                                                                                                                                                            painted black)
                                                                                                                                                                                                                                                                            3.6mm Rough Ply
                                                                                                                                                                                                                                                                                                                              (Blanc)

                                                                                                                                                                                                                                                                                                                              Plasterboard, 10mm, TSF
                                                                                                                                                                                                                                                                                                                                                                    batts

                                                                                                                                                                                                                                                                                                                                                                    R2.0 glasswool
                                                                                                                                                                                                                                                                                                                                                                                          Client:    Good Shepard Lutheran College                                                  IC          MAR 18 1 : 100                                              A2
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Checked By          Check Date
                                                                                                                                                                                                               "Lipped C" section                                                                                             (Blanc), one side only                batts                 Approved by:                                                                                                              DIMENSIONS ARE IN MM
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 AAD            MAR 18




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       15/07/2020 7:00:57 PM
                                                                                                                                                                                                          WL03 Engineered steel frame, 75mm,                  400           Scyon Matrix Panel (Deep Ocean &                  Plasterboard, 10mm, TSF               R2.0 glasswool                                                                                                                                      DO NOT SCALE
                                                                                                                                                                                                               "Lipped C" section                                           Paperbark, refer elvations, express joint         (Blanc)                               batts                 Company:                                                                         Project No.                                        Order No.
                                                                                                                                                                                                                                                                            painted black)
                                                                                                                                                                                                                                                                                                                                                                                          Date (dd-mm-yyyy):                                                                     0240100047                                     -
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Drawing No.                                              Sheet                 Issue

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 -                                                  A-100 I
                                                                                                                                                                                                                                                                                                                                                                                          Signature:


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            Designed by: Brisbane


Document Set ID: 21594200
                  21213117
                  21260700
Version: 1, Version Date: 25/08/2021
                          05/08/2020
                          14/10/2020

Page 6

                                                          1                 2              3                 4                      5                       6                    7                      8                            9                         10                                                                                                              -
                                                                                                                                                                                                                                                                                                                                                      APPROVED PLANS
                                                                                                                                              30850
                                                                                                                                                                                                                                                                                                                                                         MCU20/0072
                                                                                                                                                                                                                                                                                                                                                       NOOSA COUNCIL
                                                                                                                                                                                                                                                                                                                                                       19 AUGUST 2021
                                                                                                                                                                                                                                                                                                                                                                               -




                                                                                                                                                                                                        ?


                                       A                                                                                                                                                                                                                                                                      A




                                                                                                                                                                                                                                                                                      Proposed New Building
                                                                                                                                                                                                                 5°
                                                   9600




                                                                                                                                                                                                                                                       9600
                                           12000




                                                                                                                                                                                                                                                                              12000
                                                                                                                                                                   RF01




                                       B                                                                                                                                                                                                                                                                      B
                                                   2400




                                                                                                                                                                                                                                                       2400
                                                                                                                                              RF01




                                                                                                                           5°
                                       C                                                                                                                                                                                                                                                                      C
                                                                                                                 PL01




                                                               3400              3400           3450                     3400                 3450                  3400                     3450                     3450                    3450
                                                                                                                                                                                                                                                                                                                    I       Moved ramp, Added deck, stairs & windows                      15.07.2020     CB
                                                                                                                                                                                                                                                                                                                    H       Moved Staff Room                                              30.06.2020     CB
                                                              Module 1          Module 2       Module 3                 Module 4            Module 5              Module 6                Module 7               Module 8                Module 9
                                                                                                                                                                                                                                                                                                                    G       Bigger Breakout Room 2                                        29.06.2020     CB
                                                                                                                                                                                                                                                                                                                    F       Adjusted Building Location and added RL's, Moved Stairs and   26.07.2019     JP
                                                                                                                                                                                                                                                                                                                            Ramp
                                                                                                                                                                                                                                                                                                                     E      Resizing of Buildings and Layouts. Relocated Office Moved     19.07.2019     JP
                                                          1                 2              3                 4                      5                       6                    7                      8                            9                         10                                                   D       For Client Approval                                           31.08.2018     IC
                                                                                                                                                                                                                                                                                                                   Iss.                              Description                            Date         By



                                                              1. Ground Floor Roof                                                                                                                                                                                                                                                  FOR APPROVAL
                                                                      1 : 100


                                                                                                                                                                                                                                                     General Notes & Disclaimers
                                                                                                                                                                                                                                                                                                                                COPYRIGHT AUSCO MODULAR PTY LTD. THIS DOCUMENT MAY NOT BE
                                                                                                                                                                                                                                                     • Wall/Ceiling/Roof frames built to Ausco                                   REPRODUCED OR HAVE ITS CONTENTS DIVULGED WITHOUT WRITTEN
                                                                                                                                                                                                                                                       Backbone framing design standards.                         Title
                                                                                                                                                                                                                                                                                                                                                         AUTHORITY.
                                                                                                                                                                                                                                                     • Building chassis designed to Ausco
                                                                                                                                                                                                                                                       Standard Chassis drawings.
                                                                                                                                                                                                                                                     • All work must be done in accordance with
                                                                                                                                                                                                                                                                                                                    Roof Plan (MQB)
                                                                                                                                                                                                                                                       the relevant Australian/New Zealand
                                                                                                                                                                                                                                                       Standard(s) and the National Construction
                                                                                                                                                                                                                                                       Code.
                                                                                                                                                                                                                                                     • Furniture, plumbing, & electrical
                                                                                                                                                                                                                                                       representations are indicative. Appearance                 Project
                                                                                                                                                                                                                                                       may vary depending on supplier.                              30.85x12m Learning Centre-
                                                                                                                                                                                                                                                     • Loose items to be packed for transport.
                                                                                                                                                                                                                                                     • Site, stairs, ramp and building skirting                     SG (B190)
                                                                                                                                                                                                                                                                                                                  Client
                                                                                                                                                                                                                                                       indicative only. Size, fall and location to suit
                                                                                                                                                                                                                                                       site conditions. Constructed to comply with                  Good Shepard Lutheran
                                                                                                                                                                                                                                                       AS1428.1.
                                                                                                                                                                                                                                                     Manufactured to Wind Speed: B190                               College
                                                                                                                                                                                                                                                     Manufactured in: MQB
                                                                                                                                                                                                                                                     Intended Location: Noosaville, QLD

                                                                                                                                                                                                                                                     Client Approval                                              Drawn By            Drawn Date         Scale


                                                                                                                                   Frame
                                                                                                                                        Manufacturing - Roof
                                                                                                                                                                                                Sheet
                                                                                                                                                                                                      Drawings - Architectural
                                                                                                                                                                                                              Content                    Rev         Client:    Good Shepard Lutheran College                              IC          MAR 18 1 : 100                                              A2
                                                                                                                                                                                                                                                                                                                  Checked By          Check Date
                                                                                                          Tag       Frame           Crs.      Cladding          Lining       Insulation
                                                                                                                                                                                                A-000   Schedules - Building Shell        I
                                                                                                                                                                                                                                                     Approved by:                                                                                          DIMENSIONS ARE IN MM
                                                                                                                                                                                                                                                                                                                        AAD            MAR 18




                                                                                                                                                                                                                                                                                                                                                                                                              15/07/2020 7:00:57 PM
                                                                                                                                                                                                A-001   Site Plan                         I
                                                                                                          RF01 Engineered steel 1100       Custom Orb (Deep -              R1.8 Glass Wool                                                                                                                                                                     DO NOT SCALE
                                                                                                                                                                                                A-100   Ground Floor Plan                 I          Company:                                                     Project No.                                      Order No.
                                                                                                               frame purlins,              Ocean)                          Foil
                                                                                                               75mm, "Lipped C"
                                                                                                               section
                                                                                                                                                                                                A-101
                                                                                                                                                                                                A-200
                                                                                                                                                                                                        Roof Plan
                                                                                                                                                                                                        Elevations
                                                                                                                                                                                                                                          I
                                                                                                                                                                                                                                          I          Date (dd-mm-yyyy):                                                 0240100047                                   -
                                                                                                                                                                                                A-300   Ground Floor RCP                  I                                                                       Drawing No.                                             Sheet                  Issue

                                                                                                                                                                                                                                                                                                                        -                                                 A-101 I
                                                                                                                                                                                                                                                     Signature:
                                                                                                                                                                                                A-500   Section & Details                 I

                                                                                                                                                                                                                                                                                                                                                                                   Designed by: Brisbane


Document Set ID: 21594200
                  21213117
                  21260700
Version: 1, Version Date: 25/08/2021
                          05/08/2020
                          14/10/2020

Page 7

                                                                                                                                                                                                                                                                                                                             General Notes & Disclaimers
                                                                 1                2                3                 4               5          6            7                        8                        9                 10                                                                                          • Wall/Ceiling/Roof frames built to Ausco
                                                                        3400                3400         3450                3400        3450       3400                3450                     3450                  3450                                                                                                    Backbone framing design standards.
                                                                                                                                                                                                                                                                                                                             • Building chassis designed to Ausco
                                                                                                                                                                                                                                                                                                                               Standard Chassis drawings.
                                                                                                                                                                                                                                                                                                                             • All work must be done in accordance with
                                                                                                                                                                                                                                                                                                                               the relevant Australian/New Zealand
                                                                                                                                                                                                                                                                                                                               Standard(s) and the National Construction
                                                                                                                                                                                                                                              Ceiling Pitch Point                                                              Code.
                                                                                                                                                     W4                 W4                       W4                     W4                                                                                                   • Furniture, plumbing, & electrical
                                                                                                                                                                                                                                                             2705                                                              representations are indicative. Appearance
                                                                                                                                                                                                                                                                                                                               may vary depending on supplier.
                                                                                        W01                                  W01                     W01            W02                           W02                  W01
                                                                                                                                                                                                                                                       Deck Ceiling                                                          • Loose items to be packed for transport.
                                                                                                       D02                                                                     D02        D02                                                                     2405                                                       • Site, stairs, ramp and building skirting
                                                                                                                                                                                                                                                                                                                               indicative only. Size, fall and location to suit
                                                             0                                                                                                                                                                                  0      Ground Floor                                                            site conditions. Constructed to comply with
                                                                                                                                                                                                                                                                                                                               AS1428.1.




                                                                                                                                                                                                                                                                             600
                                                                                                                                                                                                                                              -773                   0                                                       Manufactured to Wind Speed: B190
                                                                                                                                                                                                                                                                 Datum                                                       Manufactured in: MQB
                                                                      -1755
                                                                                                                                                                                                                                                                                                                             Intended Location: Noosaville, QLD
                                                                                                                                                                                                                                                                  -600
                                                                                                                                                                                                                                                                                                                             Client Approval
                                                                                                                                                                                                                                                                                                                             Client:           Good Shepard Lutheran College
                                                                                                              2. Project South
                                                                                                                                                                                                                                                                                                                             Approved by:
                                                                                                             A-200 1 : 120
                                                                                                                                                                                                                                                                                                                             Company:

                                                                                                                                                                                                                                                                                                                             Date (dd-mm-yyyy):
                                                                 A                                               B            C                                                                  C                 B                                                     A
                                                                                       9600                           2400                                                                                                                                                                                                   Signature:
                                                                                                                                                                                                        2400                                9600


                                                                                                                                                                                                                                                                                                                                                  Drawings - Architectural
                                       Ceiling Pitch Point                                                                                                                                                                                                                                 Ceiling Pitch Point                      Sheet                 Content                                          Rev
                                       2705                                                                                                                                                                                                                                                            2705                          A-000         Schedules - Building Shell                                    I
                                                                                                                                                                                                                                                                                                                                     A-001         Site Plan                                                     I
                                       Deck Ceiling                                                                                                                                                                                                                                              Deck Ceiling
                                                                                                                                                                                                                                                                                                                                     A-100         Ground Floor Plan                                             I
                                       2405                                                                                                                                                                                                                                                              2405                        A-101         Roof Plan                                                     I
                                                                                                                                                                                                                                                                                                                                     A-200         Elevations                                                    I
                                                                                                                                                                                                                                                                                                                                     A-300         Ground Floor RCP                                              I
                                                                                                                                                                                                                                                                                                                                     A-500         Section & Details                                             I
                                       Ground Floor                                                                                                                                                                                                                                             Ground Floor
                                       0                                                                                                                                                                                                                                                                   0
                                       Datum                                                                                                                                                                                                                                                           Datum
                                       -600                                                                                                                                                                                                                                                              -600
                                                                              5. Project West                                                                                                                      3. Project East
                                                                            A-200 1 : 120                                                                                                                      A-200 1 : 120

                                                                                                                                                                                                                                                                                                                              I       Moved ramp, Added deck, stairs & windows                      15.07.2020       CB
                                                                                                                                                                                                                                                                                                                              H       Moved Staff Room                                              30.06.2020       CB
                                                                 10               9                8                  7              6          5             4                       3                        2                  1                                                                                           G       Bigger Breakout Room 2                                        29.06.2020       CB
                                                                       3450                 3450         3450                 3400       3450        3400               3450                     3400                  3400                                                                                                   F       Adjusted Building Location and added RL's, Moved Stairs and   26.07.2019       JP
                                                                                                                                                                                                                                                                                                                                      Ramp
                                                                                                                                                                                                                                                                                                                               E      Resizing of Buildings and Layouts. Relocated Office Moved     19.07.2019       JP
                                                                                                                                                                                                                                                                                                                              D       For Client Approval                                           31.08.2018       IC
                                                                                                                                                            Existing Admin Building
                                                                                                                                                                                                                                                                                                                             Iss.                              Description                            Date           By



                                        Ceiling Pitch Point                                                                                                                                                                                                                                                                                   FOR APPROVAL
                                        2705
                                        Deck Ceiling                  W01               W01             W01                  W01                    W01           W02          W02              W01
                                        2405                                                                                                                                                                                                                                                                                              COPYRIGHT AUSCO MODULAR PTY LTD. THIS DOCUMENT MAY NOT BE
                                                                                                                                                                                                                                                                                                                                           REPRODUCED OR HAVE ITS CONTENTS DIVULGED WITHOUT WRITTEN
                                                                                                                                                                                                                                                                                                                                                                   AUTHORITY.
                                        Ground Floor         0                                                                                                                                                                                   0                                                                          Title

                                        0
                                                         -1261
                                                                                                                                                                                                                                                                                                                              Elevations (MQB)
                                        Datum
                                        -600                                                                                                                                                                                                   -2078


                                                                                                                                                                                                                        Ground Level as per suveryors drawing
                                                                                                                                                                                                                                                                                   A-200                                    Project

                                                                              4. Project North                                                                                                                                                                                                                                30.85x12m Learning Centre-
                                                                            A-200 1 : 120
                                                                                                                                                                                                                                                         GL-FFL +2078               4                        GL-FFL +1261     SG (B190)
                                                                                                                                                                                                                                                                                                                            Client

                                                                                                                                                                                                                                                                                                                              Good Shepard Lutheran
                                                                                                                                                                                                                                                         A-200     5                                         3    A-200
                                                                                                                                                                                                                                                                                                                              College

                                                                                                                                                                                                                                                         GL-FFL +1755                           2            GL-FFL +773
                                                                                                                                                                                                                                                                                                                            Drawn By            Drawn Date         Scale


                                         -
                                                                                                                                                                                                                                       Existing Admin Building
                                                                                                                                                                                                                                                                                            DN A-200
                                                                                                                                                                                                                                                                                                                                     IC          MAR 18
                                                                                                                                                                                                                                                                                                                                                               As
                                                                                                                                                                                                                                                                                                                                                           indicated                                         A2
                            APPROVED PLANS                                                                                                                                                                                                                                                                                  Checked By          Check Date
                                                                                                                                                                                                                                                                                                                                                             DIMENSIONS ARE IN MM
                                                                                                                                                                                                                                                                                                                                  AAD           MAR 18
                               MCU20/0072




                                                                                                                                                                                                                                                                                                                                                                                                                          15/07/2020 7:01:04 PM
                                                                                                                                                                                                                                                                                                                                                                  DO NOT SCALE
                             NOOSA COUNCIL                                                                                                                                                                                                                                                                                  Project No.                                      Order No.

                             19 AUGUST 2021                                                                                                                                                                                                                                                                                       0240100047                                   -
                                         -                                                                                                                                                                                                                                                                                  Drawing No.                                             Sheet                  Issue

                                                                                                                                                                                                                                                                                                                                  -                                                 A-200 I
                                                                                                                                                                                                                                                                                                                                                                                            Designed by: Brisbane


Document Set ID: 21594200
                  21213117
                  21260700
Version: 1, Version Date: 25/08/2021
                          05/08/2020
                          14/10/2020

Page 8

                             APPROVED PLANS MCU20/0072
                            NOOSA COUNCIL 19 AUGUST 2021




Concept plan detailing upgrade of the existing drop‐off/pick‐up / carpark configuration

Page 9

         APPROVED PLANS MCU20/0072
        NOOSA COUNCIL 19 AUGUST 2021




Plan detailing options for internal vehicular link

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.