LANDSCAPE GENERAL NOTES:

THE CONTRACTORS SHALL:
·     Remove all un-wanted debris/materials from site, including umbrella trees. A regular weed removal program                                GENERAL:
      is recommended during the demolition and construction process to ensure weeds are supressed prior to                                     ·    For more detail regarding architecture or engineers refer to the projects Architect and Engineers
      landscape construction.                                                                                                                        drawings - when applicable
·     Confirm all dimensions in site prior to construction.                                                                                    ·    Planting shown reflects the design intent, exact numbers and locations will require confirmation on site
·     Seek instruction from site foreman where level discrepancies and poor soil structure occurs.                                                  by the superintendent.
                                                                                                                                               ·    Any changes to be made to the landscape plan must be approved by the landscape architect and
SERVICES:                                                                                                                                           superintendent.
·     The contractor shall confirm the location of all services with relevant authorities prior to planting and                                ·    All planting layouts are to be approved by the landscape architect on site prior to planting.
      excavating.                                                                                                                              ·    All structures are to be approved by the appropriate government departments prior to any construction
·     All trees must be planted a min. of 1500mm from underground services.                                                                         taking place.
·     All trees must be planted 4 -5 m from overhead street lights.                                                                            ·    All landscape plans presented assume that all base and survey information is accurate and to scale.
                                                                                                                                               ·    The contractor shall check landscape plans presented for any discrepancies with the existing site
DRAINAGE:                                                                                                                                           conditions or other dwelling presented prior to any construction work taking place. If discrepancies do
·     Install sub-soil drains as required and where garden abuts building and connect into stormwater.                                              occur these shall be highlighted at once to the superintendent prior to any construction work taking
·     Sub-soil drains to be 100mm slotted ag pipe covered with filter fabric and shall be surrounded with a                                         place.
      minimum 100mm or 25mm diameter drainage gravel.
·     Ensure drainage works correlate with adjacent land and specified finished levels.                                                        IRRIGATION:
                                                                                                                                               ·         These landscape plans assume all landscapes areas will be irrigated automatically to appropriate
GENERAL PLANTING:                                                                                                                                         standards and installed by a suitably qualified person and have a minimum 12 month warranty.
·         Plant stock is to be approved by landscape contractor and qualified aborist prior to acceptance of delivery.
·         Mulch bed areas should not exceed a 1:3 grade; where slopes are more than 1:3, install biodegradable jute                            MAINTENANCE:
          matt. Where slopes are greater than 1:2 install jute mesh product to manufacturers specification.                                    It is recommended that the whole landscape is maintained. This will be quoted on separately. Maintenance is
·         Install specified topsoil and crown bed at centre with 1 inch Organic Hoop Mulch as specified.                                       recommended fortnightly basis for the first 13-14 weeks.
·         All plantings shall incorporate the inclusion of a slow release native plant fertiliser, preferably Nutristore Gold                  ·        Weed removal and wick wiping, as required to reduce competition and seeding.
          (as per manufacturers specification) and the use of soil moisture retention additive (as per manufactures                            ·        Re- mulching, as required to maintain a consistent depth until plants are established.
          specification), placed adjacent to the plant root ball at the time of planting.
·         Trees are to be certified by a qualified aborist as natspec compliant prior to delivery to site.                                     IRRIGATION AND WATERING:
·         Qualified aborist to select natspec compliant trees at nursery and check delivery to site.
                                                                                                                                               ·      Daily for 3 weeks, every 2-3 days thereafter.
TOPSOIL:                                                                                                                                       ·      Irrigation system is installed which by the garden can be watered automatically for 30 mins per day for
·         All imported topsoil to comply with AS 4419.                                                                                                watering or every second / third day.
·         Where site soil is to be used as topsoil, ameliorate site soil as specified by the soil testing laboratory. All soil
          stockpiles are to be maintained to control weeds routinely and guard against dispersion by wind or water. ·
·         Stockpiles shall be limited to a maximum height of 2m and may require covering or retaining. Stockpiles are
          not permitted within close proximity to residential properties.
·         Generally soil to be used shall comply with AS 4419 and the contractor should ensure it complies with the
          following specification:
1.        Friable and free drainage.
2.        Good texture and structure for selected use.
3.        Acceptable conductivity and ph. levels for intended plant species to be planted.
4.         Evenly spread topsoil to meet desired grades at minimum of 300mm depth. For compaction of subgrades,
           refer to garden bed detail.

MULCH:
·         All mulch proposed to be used on site shall be free of foreign matter including anthrpogenic waste, rock,
           soil, sediment, contamination, weeds and sticks.
·         Planted areas should be mulched to a minimum 100mm deep to ensure site water conversation
          requirements are achieved as specified.


                                                                          This drawing is subject to             JOB: Landscape Design -
                                                                          copyright, with all rights remaining                                               DATE: 12/09/2018       DESIGN: AL
                                                                          to Createscapes Noosa. These           8 Attunga Heights
                                                                          drawings should not be copied
                                                                          without permission in anyway.                                                      JOB NAME: CSL028       CHECK: AL
                                                                          All contractors are to confirm         CLIENT: Tim McGary
                                             CREATESCAPES NOOSA:          measurements on site prior to                                                      SCALE:                 ISSUE: D
                                             Abi Leybourne                construction or planting. The
                                             E: [email protected]
                                                                          identification of existing services    ADDRESS: 8 Attunga Heights,                 PAGE: 1 OF 5           PURPOSE: OPW
                                                                          should also take place before
                                             P: 0411 138 269
                                                                          commencement of works.
                                                                                                                 Noosa Heads, 4567

Used in these records

About this file

File size
2.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Landscape plan.PDF · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.