SUPERSEDED Decision Notice - 010.2008.00000811.001 [As Published] · 132008.811
2008/811
0719 1.4 TP06 Site Cover Plan - GF & Site Cover Plan 04/07/2008
– FF – SBT Designs
0719 2.1 TP06 Eastern Elevation & Northern Elevation 04/07/2008
– SBT Designs
0719 2.2 TP06 Western Elevation & Southern 04/07/2008
Elevation
6567-D-1 A Detail Survey – LAU Surveys 14/07/2008
and as may be amended by these conditions and annotations on the plans.
2. The swimming pool shall finish no higher than the finished level of the river front deck (RL 2.8).
No structure shall overhang the revetment wall; in this regard the swimming pool catch pond
shall not over hang the revetment wall.
3. The existing Pandanus tectorius located at the southwest corner of the site shall be
maintained onsite, with protective measures installed to ensure protection during construction.
4. Security in the form of a cash bond or trading bank guarantee to the sum of $3000.00 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for building works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
5. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
6. A rainwater storage tank with a minimum capacity of 5000 litres shall be provided on site to
service the detached house. The tank is to be installed to ensure water from the tank can be
used both:
6.1. For external use such as watering gardens, irrigation, ornamental ponds or water
features, topping up swimming pools, outdoor cleaning; and
6.2. For use in flushing of toilets internal to the building.
7. All hot water systems installed shall be either solar systems; electric heat pump systems; or
gas systems (LPG or natural).
8. The building height shall not exceed 8.0 metres above natural ground level.
9. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:-
9.1. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
minimum of 10 metres between edges of heaps.
9.2. Disposal for firewood.
9.3. Disposal for landscaping purposes.
9.4. Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
9.5. The Applicant is advised that other methods may be considered provided full details of
the method are submitted.
9.6. The applicant is advised that burning off is an unacceptable method of disposal.
10. Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) are
not constructed under overhead electricity transmission lines, or within any easements.
Page 2 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Decision Notice - 010.2008.00000811.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 56 KB (small file)
- File type
No other editions are linked here.