Amended Stormwater Managment Plan
Attached to the e-mail SWMP & Protected Plant Survey - 3 of 4 MCU16/0081.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSC5594 – Walter Hay Dr, Noosaville 2
TABLE OF CONTENTS
1.0 Introduction ............................................................................................................. 3
1.1 Background ......................................................................................................... 3
1.2 Scope .................................................................................................................. 3
1.3 Existing Topography ............................................................................................ 3
1.4 Proposed Development........................................................................................ 4
2.0 Water Cycle Management ....................................................................................... 5
2.1 Background ......................................................................................................... 5
2.2 Wastewater Minimisation ..................................................................................... 5
2.3 Stormwater Harvesting Tanks .............................................................................. 5
3.0 Water Quality Management .................................................................................... 6
3.1 Background ......................................................................................................... 6
3.2 Construction Phase.............................................................................................. 6
3.3 Operational Phase ............................................................................................... 7
3.3.1 Water Quality Objectives.................................................................................. 7
3.3.2 Catchment Areas ............................................................................................. 8
3.3.3 Pollutant Export Modelling ............................................................................... 8
3.3.3.1 Rainfall Data................................................................................................ 9
3.3.3.2 Treatment Nodes ....................................................................................... 10
3.3.4 Effectiveness in Pollution Reduction............................................................... 10
4.0 Stormwater Quantity Management....................................................................... 11
4.1 Background ....................................................................................................... 11
4.2 Site Drainage Constraints and Opportunities ...................................................... 11
4.2.1 Drainage Constraints ..................................................................................... 11
4.2.2 Drainage Opportunities .................................................................................. 11
4.3 Modelling Overview............................................................................................ 12
4.3.1 Methodology .................................................................................................. 12
4.3.2 Catchment Areas ........................................................................................... 12
4.3.3 Roughness Coefficients ................................................................................. 13
4.3.4 Storm Events ................................................................................................. 13
4.3.5 Backwater Condition ...................................................................................... 13
4.3.6 On-Site Detention .......................................................................................... 14
4.4 Modelling Results.............................................................................................. 16
5.0 Conclusions .......................................................................................................... 17
APPENDIX A – STORMWATER MANAGEMENT PLAN..................................................... 18
APPENDIX B – STORMWATER QUALITY MUSIC MODELLING ....................................... 19
APPENDIX C – XP-STORM MODELLING .......................................................................... 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.