Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Amended Stormwater Managment Plan

Attached to the e-mail SWMP & Protected Plant Survey - 3 of 4 MCU16/0081.

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
SC5594 – Walter Hay Dr, Noosaville                                                       24




Site Location: Noosa
DURATION          1 Year     2 years      5 years    10 years   20 years   50 years   100 years
5Mins             130.00     165.00       202.00     224.00     253.00     291.00     320.00
6Mins             122.00     155.00       190.00     210.00     238.00     274.00     302.00
10Mins            100.00     127.00       156.00     173.00     197.00     227.00     250.00
20Mins            73.70      93.50        116.00     128.00     145.00     168.00     185.00
30Mins            60.20      76.50        94.70      105.00     119.00     138.00     152.00
1Hr               40.60      51.90        64.90      72.40      82.60      96.10      106.00
2Hrs              26.00      33.40        42.60      48.10      55.40      65.10      72.60
3Hrs              19.60      25.40        33.00      37.50      43.50      51.50      57.70
6Hrs              12.10      15.80        21.10      24.40      28.70      34.40      39.00
12Hrs             7.65       10.10        13.80      16.20      19.20      23.30      26.60
24Hrs             5.04       6.69         9.30       11.00      13.10      16.10      18.50
48Hrs             3.35       4.47         6.28       7.45       8.96       11.00      12.70
72Hrs             2.53       3.39           4.81       5.75      6.94      8.60       9.94
                               Table C.1 - IFD Date Sourced from BOM (Noosa)


[OCR of page images]
$C5594 — Walter Hay Dr, Noosaville

24

 

 

Site Location: Noosa

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DURATION 1 Year | 2 years 5 years 10 years | 20 years | 50 years 100 years
5Mins 130.00 | 165.00 202.00 224.00 253.00 291.00 320.00
6Mins 122.00 | 155.00 190.00 210.00 238.00 274.00 302.00
10Mins 100.00 | 127.00 156.00 173.00 197.00 227.00 250.00
20Mins 73.70 | 93.50 116.00 128.00 145.00 168.00 185.00
30Mins 60.20 | 76.50 94.70 105.00 119.00 138.00 152.00
1Hr 40.60 | 51.90 64.90 72.40 82.60 96.10 106.00
2Hrs 26.00 33.40 42.60 48.10 55.40 65.10 72.60
3Hrs 19.60 | 25.40 33.00 37.50 43.50 51.50 57.70
6Hrs 12.10 15.80 21.10 24.40 28.70 34.40 39.00
12Hrs 7.65 10.10 13.80 16.20 19.20 23.30 26.60
24Hrs 5.04 6.69 9.30 11.00 13.10 16.10 18.50
48Hrs 3.35 4.47 6.28 7.45 8.96 11.00 12.70
72Hrs 2.53 3.39 4.81 5.75 6.94 8.60 9.94
Table C.1 - IFD Date Sourced from BOM (Noosa)

 
Log in to download the original file

Amended Stormwater Managment Plan.pdf · 2.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.