Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Amended Stormwater Managment Plan

Attached to the e-mail SWMP & Protected Plant Survey - 3 of 4 MCU16/0081.

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
SC5594 – Walter Hay Dr, Noosaville                                                                  6




3.0 Water Quality Management
3.1      Background
A requirement of the proposed development is that Stormwater quality treatment shall be provided to meet
the design objectives set out in Section 2.4 of DERM’s Urban Stormwater Quality Planning guidelines 2010
and the associated with State Planning Policy (SPP) 4/10 Healthy Waters. The scope typically
encompasses the ‘post construction’ phase of the development however ‘construction phase’ water quality
is briefly addressed.


3.2      Construction Phase
Table 3.1 has been adapted from Table C4.1 of Brisbane City Council’s (BCC) Stormwater Best
Management Practices 2000 and details the typical stormwater pollutants which may be generated during
the construction phase of the development.


                      Pollutant                                       Sources

                         Litter                    Paper, construction packaging, food packaging,
                                                              cement bags and off-cuts

                     Sediment                     Unprotected exposed soils and stockpiles during
                                                              earthworks and building

                   Hydrocarbons                 Fuel and oil spills, leaks from construction equipment

                  Toxic Materials              Cement slurry, solvents, cleaning agents, wash waters

             pH Altering Substances                         Cement slurry, wash waters

                                     Table 3.1 –Typical Construction Phase Pollutants



         The following measures should typically be implemented prior to the commencement of
         construction:

                  Education of all site workers in sediment and erosion procedures

                  Specified storage areas for construction materials and plant that are bunded to prevent
                  any spillages from escaping
Log in to download the original file

Amended Stormwater Managment Plan.pdf · 2.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.