PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 FEBRUARY 2017
b. an environmental consultant with a minimum of 3 years current experience in
the field of acoustics.
Air
30. Offensive odours, dust, smoke, fumes, particulates, or other contaminants likely to
cause a nuisance must not be emitted beyond the boundaries of the premises.
31. Incineration or open burning is not permitted on the premises.
32. When requested by Council, an Air Quality Assessment Report (AQAR)
characterising, monitoring and recording of nuisance emissions must be undertaken
to investigate any complaint (other than a frivolous or vexatious complaint) caused by
odours, dust, smoke, fumes, particulates or other contaminants from operations at
the premises.
33. Such monitoring must be undertaken within a reasonable and practicable timeframe
nominated by Council and be performed by a suitably qualified person in accordance
with relevant guidelines and Standards. The report must be submitted to Council
detailing the results of such monitoring and recommendations for control measures to
eliminate nuisance air emissions from the operation of the premises.
Outdoor Lighting Devices
34. Lighting associated with the use must be designed, sited, installed and tested to
comply with Table 2.1 & 2.2 of Australian Standard AS4282-1997 “Control of the
obtrusive effects of outdoor lighting” using a control level of 1.
35. Certification must be submitted to Council from a qualified person which certifies that
all outdoor lighting devices comply with the requirements of this Decision Notice at
the time of commissioning.
For the purpose of certifying outdoor lighting devices for the development, a qualified
person is:
a. a Registered Professional Engineer of Queensland;
b. an environmental or electrical design consultant with a minimum of 3 years
current experience in the field of outdoor lighting.
Waste Disposal
36. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial
and Industrial Premises”. The facilities must include an external impervious area
correctly sized for all refuse and recycling containers and suitably screened from
public places and neighbouring properties. A bin wash area is required with a cold-
water tap, hose and drain outlet connected to sewer, via a bucket trap. The drain
outlet must be designed to prevent storm water entry to the sewerage system. This
can be achieved with a nib wall 50mm high and up to 700mm x 700mm wide (max
0.5m²), or alternatively the waste area can be roofed, or any other design approved
by Council.
37. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
OPERATIONAL WORKS – CIVIL WORKS/LANDSCAPING
Approved Plans
1. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Page 16 of 125
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.