2017-02-07 Planning and Environment Committee Agenda

of 125

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                              7 FEBRUARY 2017


RECOMMENDATION
That Council note the report by the Coordinator Planning to the Planning & Environment
Committee Meeting dated 7 February regarding Application No. 132004.240018.C for a change
to Development Permit for Material Change of Use of Premises – 174 Dwelling Houses and
Development Permit for Reconfiguring a Lot - 3 Lots into 174 Lots (& Park Lots) situated at
Straker Drive (previously 47 Pine Street, 99 Garnet Street and 34 Ashgrove Drive) Cooroy and:
A.   Approve a change to conditions 50, 65.1.6, and 65.1.7 to read as follows:
     50.      Except as may be modified by conditions of this permit the lot reconfiguration shall
              generally be in accordance with proposal; plans 97/619P2, dated 11/04/06 by Max
              Watterson & Associates and the Staging Plan (similarly referenced as 97/619P2,
              dated 11/04/06) which stages the development as follows:
              Stage 1    Lots 1 to 8, Lots 156 to 174, Central North Park Reserve (comprising
                         an area of approximately 1.00ha and backing onto Lots 155 and 157-
                         160), new road reserve, and balance lot.
              Stage 2    Lots 9 to 22, Central Park Reserve (comprising an area of
                         approximately 6,357m2 and backing onto Lots 17-23 and 38 & 39),
                         new road reserve, and balance lot.
              Stage 3    Lots 23 to 27, Lots 136 to 154, new road reserve, balance lot, and if
                         not already dedicated, the Central North Park Reserve (comprising an
                         area of 1.00ha and backing onto Lots 149-154).
              Stage 4    Lots 28 to 30, Lots 116 to 135, Eastern Park Reserve (comprising an
                         area of approximately 7.297ha and encompassing Cooroy Creek), new
                         road reserve, and balance lot.
              Stage 5    Lots 31 to 38, Lots 102 to 115, Central South Park Reserve (located
                         between Lot 101 & 102 and extending to the Bruce Highway
                         Boundary), Buffer Strip (backing onto Lots 102-111 and extending to
                         the Bruce Highway), new road reserve, balance lot, and if not already
                         dedicated, the Eastern Park Reserve (comprising an area of
                         approximately 7.297ha and encompassing Cooroy Creek).
              Stage 6    Lots 39 to 44, Lots 80 to 101, Buffer Strip (backing onto Lots 90-101
                         and extending to the Bruce Highway), new road reserve, balance lot,
                         and if not already dedicated, the Central Park Reserve (comprising an
                         area of approximately 6,357m2 and backing onto Lots 17-23 and 38 &
                         39) and the Central South Park Reserve (located between Lot 101 &
                         102 and extending to the Bruce Highway Boundary).
              Stage 7    Lots 45 to 62, Lots 77 to 79, new road reserve, and balance lot.
              Stage 8A Lots 63 to 68, Lots 72 -76, new road reserve, and balance lot (if
                       applicable)
              Stage 8B Lots 69 – 71, new road reserve, and balance lot (if applicable)
     65.1.6   Pine Street, between the new internal loop road (near lot 74) and the western end
              of Lot 69, must be upgraded to an 8.0 metre pavement width and include the
              provision of 3.0 metre wide traffic lanes, and a 2.0 metre wide marked parking lane
              on its southern side. There must be kerb and channel and a 2.0 metre wide
              footpath on the southern side of Pine Street. Kerb and channel is not required to
              the northern side of Pine Street. These works must be completed prior to Plan
              Sealing of Stage 8A.
     65.1.7   The following works are to be implemented to the Pine Street – Bagnalls Road
              route, between the western end of Lot 69 and the northern side of the Bagnalls
              Road Bridge (which crosses the Bruce Highway), prior to Plan Sealing of Stage

                                                                                   Page 4 of 125
Log in to download the original file

2017-02-07 Planning and Environment Committee Agenda(PDF, 18MB).pdf · 19.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗