Original source · versioned page text
MCU14/0084 - Applicant's copy of Concurrence agency response with conditions
SDA-1114-015945 Our reference: SDA-1114-015945 Your reference: MCU14/0084 Attachment 1—Conditions to be imposed No. Conditions Condition timing Material change of use – Coastal management districts Schedule 7, Table 3, Item 5 – Coastal management districts —Pursuant to section 255D of the Sustainable Planning Act 2009, the chief executive administering the Act nominates the Director- General of the Department of Environment and Heritage Protection to be the assessing authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following condition(s): 1. The development must be carried out generally in accordance At all times with the following plans: ‘Site Plan’ prepared by TOD Consulting Engineers dated 10/10/14, drawing number 14517-OP03, Revision B ‘Earthworks – Cut Plan’ prepared by TOD Consulting Engineers dated 10/10/14, drawing number 14517-OP10, Revision B. 2. During the construction phase of the works: For the duration of the works the subject (a) install and maintain all measures, plant and equipment of this approval necessary to ensure compliance with these conditions; (b) only use materials which are: i. clean and free of silt; ii. free from pests, chemicals and other contaminants as defined under section 11 of the Environmental Protection Act 1994; and iii. suitable for the purpose; and (c) promptly remove any material or debris which has been deposited within the coastal management district or tidal waters, other than in accordance with this approval. 3. Erosion and sediment control measures are to be installed and Prior to maintained to prevent the release of sediment to tidal waters. commencement of the works and maintained until their completion 4. Should the works become damaged as a result of erosion, At all times flooding or storm tide inundation, the registered landowner(s) of the land to which the works are attached, shall be responsible for the collection and removal of all debris, previously being a part of the works, at their own expense. 5. Any disturbed or oxidised acid sulfate soil must be treated and For the duration of managed in accordance with the current Queensland Acid Sulfate the works the subject Soil Technical Manual: Soil Management Guidelines v4.0, of this approval Department of State Development, Infrastructure and Planning Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.