Attachment B - Current Development Approval
Asbestos
32. Removal of building materials containing asbestos must be undertaken by a licensed
asbestos removalist.
33. Asbestos removal work (Section 466) of the Work Health and Safety Regulation 2011
requires a licensed asbestos removalist to give notice to Workplace Health and Safety
Queensland (WHSQ) of licensed asbestos removal work at least five days before the work
commences. Notification must be made using Form 65: Notification of licensed asbestos
removal work, demolition work or emergency demolition.
34. All building materials containing asbestos products are wrapped and disposed of in
accordance with the Public Health Regulation 2006 and the Environmental Protection
Regulation 2008.
Note: Asbestos is a Regulated Waste. The Department of Environment & Science licenses
businesses that transport asbestos waste, and landfills that accept this waste.
35. All building materials containing asbestos, including asbestos cement sheeting or roofing and
lagging are removed from the building prior to demolition/relocation.
Plumbing and Drainage
36. It is a requirement of the ‘Standard Plumbing and Drainage Regulation 2019’ that at
demolition of a building, the existing sanitary drain upstream from the connection point for a
service provider’s sewerage system must be sealed watertight. This work is deemed as
notifiable Work and must be carried out by a suitably licenced plumber who must submit an
As Constructed plan and Form 4 (Notifiable Works Form) to the QBCC (Queensland Building
Construction Commission) within 10 days of completing the work.
37. A separate development permit for Operational Works must be submitted to and approved
by Council prior to the issue of an application for Building Approval. The landscape plan is to
detail the provision of:
• Permanent planters along the upper floor plan terrace area.
• Permanent planters along central lobby
• Internal green walls around internal stairwell
• Planter to support vine over pergola
• Feature tree and understorey planting of ground level.
All landscaping on site is to be maintained for the life of the development.
5. REFERRAL AGENCIES
Not applicable.
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Activities within Road Reserve/Pathways/Car spaces
1. Safe vehicle and pedestrian access in the vicinity of the development mut be maintained at
all times. Should closures of footpath/roads/carspaces be necessary to carry out construction
works, a permit from Council’s Infrastructure Section must be obtained prior to any works
being undertaken.
2. Council encourages the implementation of sustainable and efficient energy infrastructure to
minimise energy consumption and the production of greenhouse gases. In this regard,
Council recommends the installation of solar panels for the development.
Page 6 of 9
Document Set ID: 23023144
Version: 6, Version Date: 22/05/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original