Council archive · source document
PS To Whom It May Concern OPW16/0028.01
As a consequence of this vertical movement, and recognising also that there may well be further lateral and/or vertical movement at some in the future, during the construction of the timber deck Council officers determined that the timber deck could sit slightly higher than (but not pass beyond) the revetment wall. The picture below shows the agreed, as built, position of the timber deck. Given the existing height variation (and possible future movement) in the revetment wall, and with a view to establishing and maintaining a safe and level transition from the Council-approved position and height of the timber deck, we believe that the height of the jetty should be the same as the timber deck – approximately 60mm above the revetment wall. Sincerely Paul & Marylou Shaw 29 The Promontory Noosaville QLD 4566 0424 188 346
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
PS To Whom It May Concern OPW16/0028.01.pdfRelated documentApplication case desk ↗
About this file
- File size
- 522 KB (small file)
- File type
No other editions are linked here.