Attached to the e-mail MCU10/2065.01 Request to Extend the Development Approval 17 Grant St Noosa Heads.
| NOOSA COUNCIL
Sustainable Planning Act 2009
This form must be ‘submitted to Council accompanied by the applicable fee.
Attach ‘extra pages if there i a — eke
Please note that for development approvals that include water. and sewerage conditions, a Unitywater 1 fee may also apply. Se
insufficient space on the form.
Full name — individual or com pany Lune We, Dow Covles\
Contact Name — for company LiWoe We Pd Lad AVE The Covlal\
Postal address Po Box \ee24 SS Foywilu Wy st}
Suburb Centenary Arla lets, State QUD __ [Postcode AR ED
Business phone . : 3 [AJH phon) Mobile O4\) S2SQ B\2R2
Email address lynelte OSOT Clotwail.com Fax
2. Details of existing approval
Type-of approval (please tick ALL applicable categories) wa ntity issued approval?
wy Development Permit Council
Preliminary Approval O Other entity — please specify
Compliance Permit
Material Change of Use
Reconfiguring a Lot
Operational Works
Building Works
Plumbing or Drainage Works
Compliance Certificate
Environmentally Relevant Activity
ooaooooood
Application number/council reference cVU [OO 20b YS Date issued 2 -B-\\
Is the approval for a mobile and temporary ERA? wy No Yes — complete below
Insert the name of each local government area ‘in which the mobile and temporary ERA is proposed to operate/operating
3. Nature of request (please tick ALL applicable categories)
O To change the development {1 To change the development To extend the relevant period
approval conditions before lapsing
Please attach documentation outlining the detail of and the reasons and justification for the requested change or
extension.
Privacy
Council will use any personal information provided for the intended purpose only and for remaining in contact with you. Council is authorised to collect
this information in accordance with the Local Government Act 2009 and other Local Government Acts. Your personal information is only accessed by
persons authorised to do so. Your personal information is dealt with in accordance with council’s privacy policy.
www.noosa.qid.gov.au [email protected] T 07 5329 6500
PO Box 141 Tewantin Qld 4565 ABN 97 969 214 121
Page 1 of 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 17 pages
Page 2
4. Location of the premises
Unit No. [StreetNo \7q | Street Growt Stree
Suburb Nloo sa State QLD | Postcode ASE
) : eld ai elon :
\\ SPoimag7a
5. Concurrence Agencies
Was there one or more concurrence agencies involved in the original approval?
Weswiovile details below
Note — Under $372 of the Sustainable Planning Act 2009 the person making the request is required to give a copy of this request to all
concurrence agencies.
‘Concurrence Oisy ee : a LS Date copy en aS
KAA Developmen Managers
6. Pre-request response notice ;
Has-a pre-request response been given by a relevant entity (e.g. a concurrence agency) for this request?
No QO Yes
If yes, please attach a copy of the notice.
7. Owner's consent
Is the owner's consent required for this request? O No
W Yes- complete either Table A or Table B below
Note ~ If more than one owner of the land all owners’ details are required
Owner's name/s
“lier ss owners hemels
c\\ Fave
MWe, the -povemotvones mine a the land, consent Fyyae ol The owner's written consent is attached.
to the making of this request.
BOLI ZZ
Date I“ T-AS
Signature/s
Page 2 of 4
Page 3
NOTES: For question 7 : Under section 371. of the Sustainable Planning Act 2009, if the person making the request is not the owner of the land to which the approval relates, the request must be accompanied by the owner's consent. However, owner's consent is not required if the approval: - relates to land the was acquisition land to which section 263(2)(d) of the Sustainable Planning Act 2009 applied when the application for the approval was made; or - is for building work or operational work for the supply of community infrastructure on land designated for the community infrastructure, or - the consent of the owner would not be required under section 263(1) of the Sustainable Planning Act 2009 if a development application were made for the requested change. Also, owner's consent is not required if the Assessment Manager is satisfied that: - the number of owners of the land make it impractical to obtain owners’ consent, and the requested change does not materially affect the owners’ land; or - having regard to the nature of the proposed change, the owner has unreasonably withheld consent and the requested change does not materially affect the owner’s land. 8. Does the request involve a State resource prescribed under the SustainablePlanning Regulation 2009, Schedule 14? Yes — complete below details Nature of State owned resource: Nature of Evidence required: 1 Evidence of allocation of / entitlement to, the resource O Evidence the chief executive has agreed to the request Attach a copy of the evidence required above NOTES: For question 8 Section 370(3) and (4) of the Sustainable Planning Act 2009 requires that if an application for the development approval were made at the time of making this request and evidence under section 264(1) of the Sustainable Planning Act 2009 would be required to support the application, this request must be accompanied by the written agreement of the chief executive from whom evidence would be required under section 264(1). Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a State resource, a regulation may require the application to be supported by certain evidence prescribed under regulation. Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the State resources for which evidence is required to be given, and the evidence required, to support the application. 9. Declaration of applicant \We, the applicant, declare that the above i correct in all respects, at the time of lodgement of this --application-with-Gouncil--Should- any-of-the-d n-relation to this: application be“changedin’ the future; the applicant shall advise Council in writing prior to any such change being implemented. Signature/s | Date Page 3 of 4
Page 4
Payment options In person | 9 Pelican Street, Tewantin: 8.30 am to 4.30 pm Monday to Friday (excludes public holidays). By mail Cheque or money order to be made payable to Noosa Council. C1 Cheque [C1 Money order jo Mastercard (0 Visa All payments made by credit card will incur a 0.50% surcharge (exempt of GST) to reflect the cost of fees charged for credit card transactions. Page 4 of 4
Page 5
Friday, 5 August 2011 Our Ref: 100833 / Office: Sunshine Coast Anthony and Lynelle Corkill PO BOX 434 SOUTHTOWN QLD 4350 Dear Anthony and Lynelle COUNCIL'S DECISION MATERIAL CHANGE OF USE - DUPLEX 17 GRANT STREET, NOOSA HEADS Please find enclosed a copy Council’s Development Approval for the abovementioned project. The approval provides for a relevant period until 2 August 2015. We consider the conditions to be generally standard in nature with the exception of the following: Condition 10.3 — requires a minimum width of 500mm of screening vegetation along the southern boundary. This cannot be achieved in the vicinity of the garage/driveway. Condition 12 — the fencing setback requirement of this condition is contrary to that shown on the plan and required under the planning scheme Condition 22 — requires a 1.5m concrete footpath along the frontage of the site. I am not aware that any other duplex in Grant Street has been required to provide this. Under the provisions of the Sustainable Planning Act 2009 you now have twenty (20) business days, concluding on the 30 August 2011 to make a representation to Council about conditions or lodge an appeal with the Planning & Environment Court. The appeal period can be suspended to provide further time to make a representation if required. You should carefully read the conditions and if you have any doubts or queries please contact me for clarification or to arrange suspension of the appeal period and preparation of a representation. Should you have any questions with respect to the above, please do not hesitate to contact me direct. Yours faithfully KHA DEVELOPMENT MANAGERS Scott Sobey DIRECTOR PLANNING | SURVEYING | PROJECT MANAGEMENT | COURT APPEALS Brisbane Sunshine Coast North Queensisnd Suite 1, 14 Lever Street, Albion Qid 4010 Suite 1, Corner Surf Road & Gardak Street 1C/41 Sturt Street, Townsville Qld 4810 PO Box 266, Albion DC Qld 4010 Alexandra Headland Qld 4572 PO Box 5027, Townsville Qld 4810 pl 0732621200 F | 0732621499 PO Box 6380, Maroochydore BC Qid 4558 pl 0747213066 Ff | 0747213088 Pp! 07 5443 2844 F | 07 5443 7146 Ken Hicks & Associates Pty Ltd ACN 010 278 823 ABN 74 308 405 611 trading as KHA Development Managers
Page 6
[00 §33 S hi C Sunshine Coast Regional Council T 67 5475 7272 U ns ine oast Locked Bag 72 F 07 5475 7277 C 1 | Sunshine Coast Mail Centre Q 4560 E [email protected] oO U Nn Cl ABN 37 876 973 913 W www.sunshinecoast.qld.gov.au ——— eee ee ee ee eee eee ne mime me . eee eens suet nan tint eteee es eae emgage ene ann mam einem gm Ama . 4 SRTIVED Officer: Marcus Brennan . Direct Telephone: 07) 5449 5331 & fuG 7011 Fax; (07) 8475 7277 . Response Address: Locked Bag 72, SCMC 4560 . K x : Our Reference: MBB:JLP:MCU10/2065 os — Your Reference: 400833 2 August 2011 Mr AD Corkill C/- KHA Development Managers PO Box 6380 MAROOCHYDORE BC QLD 4558 Dear Sir/Madam Decision Notice Sustainable Planning Act 2009 | refer to your application and advise that on 2 August 2011 Council decided to approve the application in full subject to conditions. Details of the decision are as follows: Application No: MCU10/2065 Street Address: 17 Grant St NOOSA HEADS QLD 4567 Real Property Description: Lot 11 SP 179879 Planning Scheme: The Noosa Plan (11 May 2009) The following type of approval has been issued: ° Development Permit for Material Change of Use ~ Multiple Housing Type 2 (Duplex) The relevant period for this development approval is identified in the assessment manager conditions. This development approval is subject to compliance with the following assessment manager conditions: . Caloundra Office Maroochydore Office Nambour Office Tewantin Office 1 Omrah Avenue 11-13 Ocean Street Cnr Currie and Bury Streets 9 Pelican Street Caloundra Q 4551 Maroochydore Q 4558 Nambour Q 4560 P Fewantin Q 4565 age 1 of PD-DA-FM384/1-13/04/2010
Page 7
MCU10/2065 PLANNING 4. General Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following _ table and as amended by these conditions: an Na Q Site Plan Level 1, prepared by EPS Design 14/07/11 Site Plan Level 2, prepared by EPS Design 44/07/11 “Level 1, prepared by EPS Design 14/07/11 Level 2, prepared byEPS Design =—S«14/07/11 Southeast & Northeast Elevations, prepared | 14/07/11 by EPS Design . Northwest & Southwest Elevations, prepared | 14/07/11 06 by EPS Design i The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions. The requirements of this development approval are to be effected, prior to the use of the premises. Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect compliance with conditions. The developer. must obtain all of the other Development Permits referred to in the _ Decision Notice, prior to obtaining a Development Permit for Building Works. Security Bond 5. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be submitted, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Operational Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs .-incurred-by-Council-in respect of enforcing performance. ofthis permit... The requirements of this development approval are to be effected, prior to the use of the premises. Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect compliance with conditions. Building Design 7. The building height of the development shall.not exceed 8m above the natural or “finished ground level, whichever is higher, at any one point. - The garage wall must be setback a minimum 200mm from the southeast boundary and either:- 8.1. provided with battens as indicated on the approved plans which comply with part 3.7.1 - Fire Separation of the National Construction Code; or 8.2. provided with an alternate fagade treatment that is approved by the assessment manager prior to the premises being occupied; and 8.3. A fence shall be constructed along the boundary line, in front of the garage. PD-DA-FM384/1-13/04/2010 Page 2 of 13
Page 8
MCU10/2065 Landscaping 9. The open space and setback must:be landscaped in accordance with Council's Policy on Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably qualified Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to the premises being occupied and maintained at all times thereafter. 10. The landscape .plans required to be submitted as part of the Operational Works applications are to denote areas of existing vegetation or existing trees proposed, or required to be retained, and shall include: 10.1. The frontage must be planted with densely growing native vegetation; . 10.2. 2.x 465 Litre street trees shall be located along the front boundary of the site. Council recommends the planting of appropriate edible fruit tree varieties, where practical; 10.3. Screening vegetation shall be provided around the perimeter of the site, including the southern side boundary, with a minimum width of 500mm; 10.4. The rear and northeast boundary of the site is encumbered by a sewer lines and the following species shall not be utilised for this planting: 10.4.1. Gum trees (particularly those that grow into large trees); 10.4.2. Fig trees; or 10.4.3. Lilly pilly trees. 41. Cleared vegetation is to be suitably processed by one of the following methods and removed from the site: ~ Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high. with a minimum of 10 metres between edges of heaps. 11.1... Disposal for firewood. : - 11.2. Disposal for landscaping purposes. 11.3. Transport to alternative site for breaking down materials provided that all necessary permits have been obtained to allow the alternate site to be used for this purpose. : 11.4. The disposal method for clearing works is to be submitted in conjunction with "ain application fora Development Permit for Operational Work: The Applicant is ~ advised that other methods may be considered provided full details of the method are submitted. The Applicant i is advised that burning off is an unacceptable method of disposal. Fencing 12. Front fencing shall be either setback at least 1 metre from the front property boundary, with at least half of the fencing setback 2 metres; or, where on the property boundary, ~ less than 1.2 metres in height or of open construction. Relevant Period 13. The Development Permit for a material change of use lapses if the use has not happened by 2 August 2015, unless an application to extend the currency is approved by Council. PD-DA-FM384/1~-13/04/2010 ‘ Page 3 of 13
Page 9
MCU10/2065 — CIVIL ENGINEERING Vehicle Access 14. 15. 16. 417. A vehicular access driveway to serve the development must be constructed from the Grant Street frontage of the site with a maximum width of 4.5m at the property boundary. The driveway must be designed and consiructed to Council’ 's design standards and to grades that prevent vehicles from scraping and/or bottoming whilst also allowing ~ pedestrians movements along the footpath without any step or level difference. Should any driveways be constructed to grades that do not comply with AS/NZS 2890.1+-2004, Council will require that the driveway be removed and reconstructed to levels that do comply. Please note, a step between the driveway and the footpath must be avoided, as it is preferred to have the footpath continue at a constant grade to minimise the potential for pedestrians to trip or fall: To ensure pedestrian safety between vehicles exiting the site and pedestrians on the’ footpath, the driveway and any associated fencing or vegetation near the driveway must comply with the minimum sight line requirements as defined in AS 2890.1, section 3.2.4. The applicant must demonstrate compliance by illustrating these sight lines on the plans submitted for both Operational Works approval and Building Works © approval. All vehicles must enter and leave the site in a forward direction. Car Parking 18. 19. 20. Carparking must be provided within the site generaily as shown on drawing number A- 03 dated 14 September 2010 by EPS Design, except as modified herein. The carparking area must be designed to comply with the provisions of AS/NZS 2890.1-2004 for user class 1A with allowance for vehicles to enter and leave the site in a forward gear and-with a minimum head clearance (headroom) at any point of 2.2m. . All carparking must be kept and maintained in a condition fit for use. . Frontage Works 21. 22, 23. 24. Footpath improvements such as topsoiling, grassing, and tree planting are required to __ the Grant Street frontage of the site in accordance with Planning Scheme Policy PSPO03 Landscaping Ph jants & Guidelines. Grass must be couch, free of weeds. Anew 1.5m wide concrete path must be constructed along the Grant Street frontage of the site in accordance with Council's design standards and fo an alignment that protects any significant vegetation or any underground services. All paths, driveways and parking areas must be designed and constructed: to ensure pedestrian safety using non-slip materials, to produce an evenly graded surface finish, and to be in accordance with the Disability | Discrimination Act 1992 and Australian Standard 1428.1 Design for Access & Mobility. All redundant vehicular crossings to the site must be removed and replaced by kerb & channel, footpath paving and landscaping such as trees and grasses in accordance with Council’s Standard specifications prior to commencement of the use permitted by this permit. PD-DA-FM384/1-13/04/2010 - : . . Page 4 of 13
Page 10
MCU10/2065 Roof Water & Stormwater Drainage 25, 26. 27. 28. 29. The design of the internal stormwater drainage system must be in accordance with Council’s Planning Scheme Policy 5 ~ Engirieering Design Standards — Roads, Drainage and Earthworks and be sufficient to ensure that stormwater runoff from the driveway and vehicle manoéuvring area does not adversely affect the proposed units or any adjoining property. Roof runoff from any new dwelling must be directed to a a rainwater storage system or tank that is installed to ensure water from the rainwater storage system or tank is used for external uses (such as watering gardens, irrigation, ornamental ponds, water features, topping-up swimming pools, outdoor cleaning, etc) and for internal (ground floor) use in washing machine cold taps and toilet cisterns. All rainwater tanks are to be designed and installed in accordance with the Queensland Development Code (QDC).current at the time of building approval, and must be part of the plumbing application for approval. The location and capacity of the tanks must be clearly shown on the plans submitted for Building Works and Operational Works approval and any overflow must be directed to the stormwater drainage system. All stormwater drainage (including roof water overflow from the rainwater storage system) must be collected and discharged so there is no net increase in stormwater runoff from the site. Stormwater drainage permitted to drain from the site must be discharged to Council's existing drainage system. To ensure that polluted run-off does not enter Council's stormwater drainage system, stormwater run-off from the carparking areas and the driveways must have the first: flush (the first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor/gross pollutant trap provided. on site prior to being permitted to discharge into Council’s drainage system. Alt other clean stormwater, such as roof water, can be collected on site and discharged through a single underground drain ‘line directly into the existing drainage system, bypassing the grease/oll arrestor/gross pollutant trap. To this end, a detailed maintenance plan must be prepared for the proposed grease/oil __arrestors/gross pollutant trap, which must be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works. ° The approved maintenance plan must be incorporated in the Community Management Scheme for.the development and a copy of this must be provided for Council s records prior to commencement of the approved Use. A Development Permit for Building Works must not be granted until a Development Permit for Operational Works has been issued in regard to the drainage scheme. All site stormwater drainage must be by means oF a gravity system. Earthworks 30. 31. Earthworks required onsite must be carried out in ‘accordance with Council’s Planning Scheme Policy PSP5 — Engineering Design Standards, so as not to cause the additional ponding of water on any adjoining lands or the blockage of, or interference with, any natural watercourses. Earthworks carried out on site must not affect the structural integrity of any of the existing fences or structures that border the development site. Fences that are affected must be replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard any fences to be replaced must be clearly shown on the plans submitted for Operational Works approval. PD-DA-FM364/1-13/04/2010 - : Page 5 of 13
Page 11
MCU10/2065 Site Stability 32. A Geotechnical Engineer or similar qualified expert must assess the soil condition on site, determine the soil classification, establish whether any measures are required to protect the stability of adjoining buildings and/or structures and/or land, and make " recommendations on the type of foundation system(s) best suited for the proposed development. The recommendations of this report must be incorporated into the ‘design and construction of the proposed development. Erosion and Sediment Control 33. Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site control measures such as silt fencing, controlled gravel access to the:site and controlled disposal of waste, will be necessary. ‘In this regard plans detailing the methods of. controlling erosion and sediment are required to be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works. General 34. 35. 36. 37. Digital detailed designs including drawings, calculations, specifications etc, must be submitted with any application for a Development Permit for Operational Works in respect of stormwater drainage works. The design must be in accordance with Council’s Planning Scheme Policy PSP05 — Engineering Design Standards — Roads, Drainage and Earthworks. To avoid. conflict with underground pipes or services, all existing and proposed services. required by the development must be shown on the plans. ’ Any damage caused to any public utility’ during the coursé of construction must be ‘repaired to Council’s standards and at no cost to Council. Any alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site must be at no cost to Council. The transportation of all materials to and from the site must be undertaken ina manner such that no particle matter escapes onto a public road. All vehicles carrying materials os " gither to or from the site must be covered to prevent materials including dust being windblown from the vehicle. HEALTHY PLACES Noise Nuisance 38. Noise emission from mechanical equipment shall comply with the following requirements: 38.1. Air-conditioning and Refrigeration . ® 7am to 10pm: Maximum background + 5dB(A) ® 10pm to 7am: Maximum background + 3dB(A) 38.2. Pumps ® 7am to 7pm: Maximum background + 5dB(A) e 7pm to 16pm: Maximum background + 3dB(A) ® 10pm to 7am: No audible noise. PD-DA-FM384/1-13/04/2010 : : , Page 6 of 13
Page 12
MCU10/2065 39. Submission of written certification from a suitably qualified person confirming that the noise levels from all mechanical equipment comply when measured at either the residential boundary or outside the most exposed part of an.affected building, whichever is the closest to the equipment. 40. The assessment and certification is required immediately after installation of the - equipment and prior to any occupation of the building, and in a format approved by. _ Council. All equipment should be operating at the same time to test the overall noise level created. 41. Advice: It is highly recommended that the person you engage to certify the installation is involved at the plan development stage so they can-recommend where this equipment is best located. They can also advise about noise enclosures and can make other suggestions to avoid noise problems. it is a lot more costly to try and deal with noise problems after everything is built. 42. Noise from residential building works shall comply with the following - 42.1. Limited to between 7:00am to 6:30pm Monday to Saturday. 42.2. All reasonable measures are taken to minimise noise emissions. 42.3. Not permitted on Sunday or public holidays. UNITYWATER ‘ 43. The fire-fighting demand on Unitywater’s water supply system from the development must not exceed 165 litres per second 44, Separate 25mm PE water services must be installed to a common lot boundary with independent. meters: installed outside the boundary of the lot in accordance with Unitywater Standard Drawing SCW 361 45. Water meters must be located on alternative boundaries to electrical pillars 46. Buildings and other structures must maintain a minimum clearance of 1.5 metres from Unitywater sewer mains, and 1.0 metre from sewer manhole chambers and inspection openings 47, The storm water retention system must be located a minimum of 1. 5 metres from Unitywater sewerage infrastructure 48. Stormwater pipes greater than 225mm diameter must maintain a minimum clearance of 1.0 metre from Unitywater sewerage infrastructure 49. The level of the existing sewer manholes must be adjusted to suit the proposed : finished surface levels. Work must be undertaken by Unitywater at the applicants cost ..§0.--Tree--plantings.must.maintain..a.minimum.horizontal..clearance..of 1.0 metre. from Unitywater water mains and 1.5 metres from Unitywater sewerage mains. Landscaping plants within these clearances must be low growing when mature and suitable approved varieties 51. Construction works undertaken in the vicinity of Unitywater water supply or sewerage : infrastructure must not adversely affect: thé integrity of the infrastructure. All costs associated with repair, replacement or alteration of infrastructure must be met. by the - applicant L& Not Applicable [:6. "APPR NS/DOCUMENTS . The approved plans and / or documents for this development approval are listed in the. following tables: PD-DA-FM384/1-13/04/2010 SO, : Page 7 of 13
Page 13
MCU10/2065 Approved Plans . Plan : Rev. | Plan Name Date Drwg No. A-01 Cc Site Plan Level 7, prepared by EPS Design | 14/07/11 Drwg No. A-02 c Site Plan Level 2, prepared by EPS Design | 14/07/14 Drwg No. A-03 - C | Level 7, prepared by EPS Design __ |. 14/07/11 Drwg No. A-04 Cc Level 2, prepared by EPS Design 14/07/11 Drwg No. A-05 D Southeast. & Northeast Elevations, | 14/07/11 prepared by EPS Design Drwg No. A-06 B Northwest & Southwest Elevations, | 14/07/11 prepared-by EPS Design These Advisory Notes do not form part of this approvai or the conditions attached thereto. ' The. following Advisory Notes are intended to provide guidance to the applicant where necessary and inform the applicant of actions that Council may take with respect to the development site or the approval: CIVIL ENGINEERING 1. In this document, an effectively stabilised surface is defined as one that does not: 1.1." ‘have visible evidence of soil loss caused by sheet, rill or gully erosion or 1.2. lead to sedimentation, or 1.3. - lead fo water contamination. 2. Diverting clean stormwater runoff into a sediment basin is an inferior option to diverting clean stormwater around or through the site because it will cause an increase in the volume and frequency of contaminated releases from the sediment basin. For this reason, diverting clean stormwater into a sediment basin is not acceptable unless the proponent demonstrates that diverting clean stormwater around or through the site is not feasible. : — 3. Compensatory controls are erosion controls, flow controls and sediment controls which compensate for the lack of sediment basin and are applied such that the type, timing, placement and management of controls. minimise the potential for water contamination and environmental harm. This is primarily achieved by reducing the risk of erosion and : subsequent sediment release, for example by turfing or mulching and managing concentrated flows in the area. . 4. Research has shown that sediment basins designed on a “batch” or total storm capture approach are only capable of treating a small percentage of the annual runoff volume without basin size becoming excessive. Innovation in sediment basin design to incorporate continuous flow treatment is likely to occur in the future and as this technology becomes available in-best practice guidelines it is required that this technology be adopted where a better water quality outcome will result. In the interim the minimum basin size is as specified in the condition. PD-DA-FM384/1-13/04/2010 Page 8 of 13
Page 14
MCU10/2065
Dewatered flows from sediment basins must be treated to ensure total suspended
solids concentrations of less than 50mg/L and that pH is within 6.5-8.5 unless it can
be' demonstrated that a non compliant release occurred to facilitate a better
‘environmental outcome. For example, higher total suspended solids concentrations
may be acceptable in circumstances where further rain is imminent and it can be
substantiated that releasing partially treated basin water which has a TSS ,
concentration exceeding the release limit, would minimise the total contamination
released from the site, by providing for the capture and treatment of expected runoff.
However, releasing waters from Sediment basins without treatment i is not acceptable.
UNITYWATER
Connection to Unitywater live water mains and the Unitywater live sewer system must-
be undertaken by Unitywater at the applicants cost.
A Trade Waste permit is required prior to any stormwater, groundwater or sump pump
discharge into Unitywater’s sewerage system.
STATE PLANNING REGULATORY PROVISION (ADOPTED CHARGES)
8. “This development permit may trigger an ‘Adopted Infrastructure Charge Notice’ (if
applicable) to be issued in accordance with Councils 'Adopted Infrastructure Charges
Resolution (No.1) 2011' under the State Planning Regulatory Provision (Adopted
Charges) and the Sustainable Planning Act 2009.
GENERAL . 5
Equitable Access And Facilities
9.
The plans for the proposed building work have NOT been assessed for compliance
with the requirements of the Building Code of Australia - Part D3 as they relate to
people with disabilities. Your attention is also directed to the fact that in addition to the
requirements of the Building Code of Australia —- Part D3 as they relate to people with
disabilities, one or both of the following may impact on the proposed building work:
(a) The Disability Discrimination Act 1992 (Commonwealth)
{b) — Anti-Discrimination Act 1991 (Queensland)
Sunshine Coast Regional Council. recommends that the following matters be
... considered.to-address-.equitable.access-and-facilities-in.the-building:-..
(a) The building and environs should be designed to meet the requirements of the
Human Rights and Equal Opportunity Commission “Advisory Notes on Access
_to Premises” and AS 1428.2
(b) Applicants should be aware that a “Disability Standard on Access to premises”
is currently being developed and most likely will impose changes on, the
Building Code of Australia :
(c) — Any services and facilities in the building complex should allow independent,
dignified and equitable use of the services and facilities for all people.
Aboriginal Cultural Heritage Act 2003
10.
There may be a requirement to establish a Cultural Heritage Management Plan and/or
obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003. :
The ACH Act establishes a cultural heritage duty of care which provides that: “A
person who carries out an activity must take afl reasonable and practicable measures
to ensure the activity does not harm Aboriginal cultural heritage." It is an offence to
_PD-DA-FM384/1-13/04/2010 . Page 9 of 13
Page 15
MCU10/2065
fail fo comply with the duty of care. Substantial monetary penalties may apply to
individuals or corporations breaching this duty of care. Injunctions may also be issued:
by the Land and Resources Tribunal, and the Minister administering the Act can also
issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural ~
heritage or the cultural heritage value of Aboriginal cultural-heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3239 3647 to
discuss any obligations. under the ACH Act.
»® Development Permit for Building Works.
e Development Permit for Operational Works (Access and/or Carparking, Stormwater
Drainage, Frontage Works, Site Filling, Landscaping; Erosion & Sediment Control).
Not Applicable
Not Applicable
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from.
the Sustainable Planning Act 2009 is attached. .
During the appeal period, you as the applicant may suspend your appeal period and make
written representations to Council about the conditions contained within the development
approval. {f Council agrees or agrees in part with the representations, a “negotiated decision
notice” will be issued. Only one “negotiated decision notice” may be given. Taking this step
will defer your appeal period, which will commence again from the start the day after you
"receive a “negotiated decision notice’. (Refer to Part 8 “Dealing with decision notices and
approvals” - Division 1 “Changing decision notices and: approvals during applicant's appeal
period” of the Sustainable Planning Act 2009.)
PD-DA-FM384/1-13/04/2010 , Page 10 of 13 ~
Page 16
MCU10/2065 If you wish to obtain more information about Council's decision, electronic copies are available on line at www.sunshinecoast.qid.gov.au, or at Council Offices. Yours faithfully CL\ IL DENIS WALLACE |. SENIOR DEVELOPMENT PLANNER Enc: _ Adopted Infrastructure Charge Notice . Approved Plans Appeal Rights PD-DA-FM384/1-13/04/2010 . Page 11 of 13
Page 17
i
i
MATERIAL CHANG
.- s , . " i | = h / :
S n I n c Coa st a eeaerghts AGT 2009 & SUSTAINABLE PLANNING
Regional Council :
REGULATION 2009
MCU10/2065:
e
E OF USE, RECONFIGURING A LOT &
OPERATIONAL WORKS
Division 8
461
(1)
(3)
462
(1)
(4)
. Negotiated decision notice is
463
Q)
to
and
Appeals to.
development
approvals
court relating
applications
Appeals by applicants
An applicant fora development application may appeal!
to the court against any of the following—
(a) the refusal, or the refusal in part, of the
development application;
(b) any condition of a development approval, another
Matter stated in a development approval and the
identification or inclusion of a code under section
242; .
the decision to give a preliminary approval when a
development permit was applied for; :
the length of a period méntioned in section 341;
(€) a deemed refusal of the development application,
An. appeal under subsection (1){@), (b), (c) or (d)'must
~ be started within 20 business days (the applicant’s
appeal period) after—_ . .
(a) if a decision notice or Negotiated decisicn notice
is given—the day the decision notice or
negotiated decision notice is given to the
applicant; or *
(b) otherwise—the day. a decision’ notice was
required to be given to the ‘applicant.
An appeal under subsection (i)(e) may be started at
any time after the fast day a decision on the matter
should have been made.
(e)
(a)
Appeals by submitters—general
A submitter for a development application may appeal
to the court only against—
(a) the part of the approval relating to the
assessment manager's decisiori about any part of
the application fequiring impact assessment
under section 314; or
the part _of _th
....elating---to---the---~
nm under section
(b)
To the extent an appeal may be made under
subsection (1), the appeal may be against 1 or more of
the following— :
(a) .the giving of a development approval;
{b) any provision of the approval including—
(i) a condition of, or lack of Condition for, the
approval; or :
(i) the length of a period mentioned in section
341 for the approval.
However, a submitter may not appeal if the submitter—
(a) withdraws the submission before the application
is decided; or .
(b) has: given the assessment manager a notice
under section 339(1Xb\(ii).
The appeal must be started within 20 business days (the
submitter’s appeat Period) after the decision notice or
given to the submitter.
Additional and extended appeal rights for submitters
for particular development applications
This section applies to a development application to
which chapter 9, part 7 applies
PD-DA-FM3B4/1-13/04/2010
decision.
(2). A submitter of a properly made submission for the
, application may appeal to the court about a referral
agency's response made by @ prescribed concurrence
agency for the application. .
(3) However, the submitter may only appeal against a
referral agency's response to the extent it relates to—
(a) if- the prescribed concurrence agency is the chief
executive (environment)—development for an
aquacultural ERA; or
(b) if the prescribed concurrence agency is the chief
executive (fisheries)—development that is—
(@) a material change of use of premises for
aquaculture; or we
(ii) operational work that is the removal, damage
or destruction of a marine plant.
(4) Despite section 462(1), the submitter may appeal
against the following matters for the application even if
the matters relate to code assessment— .
(a) a decision about a matter mentioned ‘in section
462(2) if it is a decision Of the chief executive
(fisheries); :
(b) a referral agency's response mentioned in
subsection (2). .
. 464 Appeals by advice agency submitters
(1) Subsection (2) applies if an” advice agency, in its
response for an application, told the assessment
manager to treat the response as a properly made
submission.
(2) The advice agency may, within the limits of its
jurisdiction, appeal to the court about—
{@) any part of the approval relating to the assessment
manager's decision about any part of the
application requiring impact assessment under -
section 314; or
any part of the approval Telating to the assessment
manager's decision under section 327.
(3) The appeal must be started within 20 business days
after the day the decision notice or negotiated decision
hotice is given to the advice agency as a submitter.
{b)
(4) However, if the advice agency has given the
.assessment manager a notice under section
339(1)(b)(ii), the advice agency..may.not -appeal-the
465 Appeals about decisions relating to extensions for
approvals - :
(1) For a development approval given for a development
application, a person to whom a notice is given under
section 389, other than a notice for a decision under
section 386(2), May appeal to the court against. the
decision in the notice.
(2) The appeal must be Started within 20 business days
after the day the notice of the decision is given to thé
person.
(3) Also, a person who has made a request under section
383 may appeal to the court against a deemed refusat of
the request.
(4) An appeal under Subsection (3) may be started at any
fime after the last day the decision on the matter should
have been made.
466 Appeals about decisio:
changes . :
(1) Fora development approval given for a develapment
application, the following persons May appeal to the
court against a decision on a request to make a
permissible change to the approval—~ -
s relating to permissible.
Page 12 of 13
Page 18
(2)
(3)
(4)
467
(1)
(2)
{a) if the responsible entity for making the change is the
assessment manager for the application—
{i) the person who made the request; or
_ (lf) an entity that gave a notice under section 373
or a pre-request response notice about the
“ request;
(b) if the responsible entity for making the change is a
concurrence agency for the application—the person
who made the request. .
The appeal must be started within 20 business days aiter
the day the person is given notice of the decision on the
request under section 376.
Also, @ person who has made a request under section
369 may appeal to the court against a deemed refusal of
the request:
An appeal under subsection (3) may be started at any
time aiter the last day the decision dn the matter should
have been made.
Appeals about changing or cancelling conditions
imposed by assessment manager or concurrence
agency :
A person to whom a notice under section 378(9)(b) giving
a decision to change or cancel a condition of a
development approval-has been given may appeal to the
court against the decision in the notice. :
The appeal must be started within 20 business days after
the day the notice of the decision is given to the person.
PD-DA-FM384/1-13/04/2010
MCU10/2065
Page 13 of 13
Used in these records
01072015144724.pdfRelated documentApplication case desk ↗
01072015144724.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.