Council archive · source document
01072015144724 · MCU10/2065
Attached to the e-mail MCU10/2065.01 Request to Extend the Development Approval 17 Grant St Noosa Heads.
MCU10/2065 PLANNING 4. General Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following _ table and as amended by these conditions: an Na Q Site Plan Level 1, prepared by EPS Design 14/07/11 Site Plan Level 2, prepared by EPS Design 44/07/11 “Level 1, prepared by EPS Design 14/07/11 Level 2, prepared byEPS Design =—S«14/07/11 Southeast & Northeast Elevations, prepared | 14/07/11 by EPS Design . Northwest & Southwest Elevations, prepared | 14/07/11 06 by EPS Design i The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions. The requirements of this development approval are to be effected, prior to the use of the premises. Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect compliance with conditions. The developer. must obtain all of the other Development Permits referred to in the _ Decision Notice, prior to obtaining a Development Permit for Building Works. Security Bond 5. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be submitted, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Operational Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs .-incurred-by-Council-in respect of enforcing performance. ofthis permit... The requirements of this development approval are to be effected, prior to the use of the premises. Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect compliance with conditions. Building Design 7. The building height of the development shall.not exceed 8m above the natural or “finished ground level, whichever is higher, at any one point. - The garage wall must be setback a minimum 200mm from the southeast boundary and either:- 8.1. provided with battens as indicated on the approved plans which comply with part 3.7.1 - Fire Separation of the National Construction Code; or 8.2. provided with an alternate fagade treatment that is approved by the assessment manager prior to the premises being occupied; and 8.3. A fence shall be constructed along the boundary line, in front of the garage. PD-DA-FM384/1-13/04/2010 Page 2 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
01072015144724.pdfRelated documentApplication case desk ↗
01072015144724.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.